Slide 1: Advancing the Past-Producing Prince Silver Project in Nevada
OCTOBER 2026 Advancing the PAST-PRODUCING PRINCE SILVER PROJECT in Nevada CSE: PRNC OTCQB: PRNCF FRA: T130
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS FORWARDLOOKINGSTATEMENTS FORWARD LOOKING STATEMENTS Certain statements in this presentation are forward-looking statements, including with respect to future plans, and other matters. Forward-looking statements consist of statements that are not purely historical, including
Slide 3: Why Prince Silver & Why Now?
WHY PRINCE SILVER WHY NOW? WHY PRINCESILVER WHY NOW? WHY PRINCE SILVER & WHY NOW? 1. PROVEN NEVADA SILVER DISTRICT 3. CLEAR PATH TO MAIDEN MINERAL RESOURCE ESTIMATE Not An Early-Stage Exploration Story Targeted for Q1 2027 • Large-scale past-producing system with • Drilling is designed to validate a
Slide 4: Prince Silver Project: Modern Bulk CRD Opportunity
PRINCE SILVER PROJECT: “MODERNBULK CRD OPPORTUNITY” PRINCE SILVER PROJECT: “MODERN BULK CRD OPPORTUNITY” LOCATION: Lincoln County, Nevada (240km north of Las Vegas) PROVEN MINING DISTRICT: Between 1912-1964 the Pioche Region produced Ag, Au, Mn, Pb and Zn(1) which at recent spot prices would be valu
Slide 5: Past Producing Prince Silver Project
PAST PRODUCING PRINCE SILVER PROJECT PAST PRODUCING PRINCE SILVER PROJECT RECORDED HISTORIC PRODUCTION (1912–1949) 1.12mt at 100 g/t Ag, 10.2% Mn, 4.5% Zn, 0.50 g/t Au(1), from underground mining of veins and mantos yielding ~3.6 Moz Ag, ~50 Kt Zn, ~17koz Au(1) (Mn was not a focus during this period
Slide 6: Historic Prince Mine Headframe
Historic Prince Mine Headframe Historic Prince Mine Headframe Historic Prince Mine Headframe Surface Collapse of Historic Near-Surface Mined Stopes 6 6
Slide 7: Prince Silver Project: Not a Small Vein System
PRINCE SILVER PROJECT: “NOT A SMALL VEINSYSTEM” PRINCE SILVER PROJECT: “NOT A SMALL VEIN SYSTEM” SHALLOW TO DEPTH CONTINUITY Shallow Mn-rich replacement mineralization • Historic mining progressed from shallow oxides into under gently dipping limestone sulphides to 254 m (835 ft), demonstrating vert
Slide 8: Drilling Ongoing: 2026 Highlight Results
Drilling Ongoing: 2026 Highlight Results Drilling Ongoing: 2026 Highlight Results Broad, Shallow Polymetallic Mineralization PRC-59 47.24 m at 68.17 g/t Ag (119.13 g/t AgEq), 9.57% Mn, 2.40% Zn, 1.95% Pb and 0.26 g/t Au from 62.48 m downhole Strong Silver Grades Over Broad Widths PRC-60 36.58 m at 8
Slide 9: Cross Sections Through Stratigraphic Units
CROSS SECTIONS THROUGH STRATIGRAPHIC UNITS CROSS SECTIONS THROUGH STRATIGRAPHIC UNITS Units Units TARGETING DEEPER UNITS IN 2026 • Past production focused on mining the veins and mantos in the shallow A & B Shale units • Historically left the deeper CM Bed and Prospect Mountain Quartzite Unit untouc
Slide 10: Doubled Land Position in 2026
DOUBLED LAND POSITIONIN2026 DOUBLED LAND POSITION IN 2026 LAND POSITION MORE THAN DOUBLED • Staked ~656 new acres, more than doubling the land package at the Prince Silver Project. CLAIMS ADDED ALONG PROVEN MINERAL TREND • New claims lie directly along the Great Western Fault corridor, the primary c
Slide 11: Unlocking Potential
UNLOCKING POTENTIAL What’s driving the project forward? Key Catalyst Q3 2026 Q4 2026 Q1 2027 Q2 2027 EXTENDED PHASE 1 DRILLING PROGRAM Infill, step-out and depth testing to expand mineralized footprint. EXTENDED PHASE 1 DRILLING RESULTS Releasing additional assay results into Q4. METALLURGICAL TEST
Slide 12: Silver Developers - EV/AgEq
SILVER DEVELOPERS - EV/AG EQ As of September 15, 2026. Based on Global NI 43-101 Resources = Measured + Indicated + Inferred. SILVER DEVELOPERS - EV/AG EQ As of September 15, 2026. Based on Global NI 43-101 Resources = Measured + Indicated + Inferred. EV/AgEq Moz Mkt Cap (C$M) $4.54 $1,840 $3.80 $2.
Slide 13: US Critical Minerals Advantage
• Sept 15, 2026: Bitterroot (TSX.V: BTT) secures US$5.22 M from US Department of War under the Defense Production Act (DPA) Title III for its LM N-Cu project in Michigan. • Feb. 24, 2026: Lithium Americas Corp. (TSX: LAC; NYSE: LAC) received a US$432 million U.S. DOE loan advance US CRITICAL on for
Slide 14: Stampede Gap Project
STAMPEDE GAP PROJECT STAMPEDE GAP PROJECT A District-Scale Cu-Mo Porphyry and Skarn System + Distal Pb-Zn-Ag-Au System EXTENSIVE PORPHYRY SYSTEM • The Stampede Gap Cu-Au-Mo Project is an underexplored porphyry system that has the hallmarks of a large-scale copper-molybdenum deposit. • Evidence sugge
Slide 15: Capital Structure
CAPITAL STRUCTURE As of September 15, 2026 CAPITAL STRUCTURE As of September 15, 2026 OWNERSHIP Shares Issued & Outstanding 59.1 million Newsletter Institutional, Writers, 5% 12% Options (Avg. $0.51/share) 4.0 million Founders & Insiders, 26% Warrants (Avg. $0.62/share) 11.9 million (1) Contingent R
Slide 16: Management & Directors
MANAGEMENT DIRECTORS MANAGEMENT & DIRECTORS DEREK IWANAKA RALPH SHEARING CEO & Director President & Director Derek is a mining-sector executive with over 23 years of Former CEO and Founder of Luca Mining and, current CEO of investor relations, corporate development, and capital Goldgroup Mining, a g
Slide 17: An Undervalued Silver Asset
ANUNDERVALUED SILVER ASSET AN UNDERVALUED SILVER ASSET In the mine-friendly "Silver State" of Nevada, LOW RISK TIER 1 MINING JURISDICTION a recognized region for world-class Ag-Au projects. LEVERAGED TO CRITICAL MINERALS Prince offers rare, U.S.-based leverage to 5 critical and strategic minerals: s