Prince Silver Corp. · CSE:PRNC

Prince Silver — Investor Presentation (May 2026)

18 slides from Prince Silver's investor presentation, May 2026

  1. Slide 1: Advancing the Past-Producing Prince Silver Project in Nevada

    Advancing the May 2026 PAST-PRODUCING PRINCE SILVER PROJECT In Nevada CSE: PRNC OTCQB:PRNCF FRA: T130

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Certain statements in this presentation are forward-looking statements, including with respect to future plans, and other matters. Forward-looking statements consist of statements that are not purely historical, including any statements regarding beliefs, plans, expectatio

  3. Slide 3: Why Prince Silver & Why Now?

    WHY PRINCE SILVER & WHY NOW? 1. PROVEN NEVADA SILVER DISTRICT 3. CLEAR PATH TO MAIDEN MINERAL RESOURCE ESTIMATE Not Early-Stage Exploration Plenty of Exploration Upside • Large-scale past-producing system with • Drilling is designed to validate an Exploration Target of 23-45Mt historical underground

  4. Slide 4: Prince Silver Project: Modern Bulk CRD Opportunity

    PRINCE SILVER PROJECT: “MODERN BULK CRD OPPORTUNITY” LOCATION: Lincoln County, Nevada (240km north of Las Vegas) PROVEN MINING DISTRICT: Between 1912-1964 the Pioche Region produced Prince Projects Ag, Au, Mn, Pb and Zn(1) which at recent spot prices would be valued at over $5.0 Billion(2). GEOLOGIC

  5. Slide 5: Past Producing Prince Silver Project

    PAST PRODUCING PRINCE SILVER PROJECT RECORDED HISTORIC PRODUCTION (1912–1949) 1.12mt at 100 g/t Ag, 10.2% Mn, 4.5% Zn, 0.50 g/t Au(1), from underground mining of veins and mantos yielding ~3.6 Moz Ag, ~50 Kt Zn, ~17koz Au(1) (Mn was not a focus during this period). CURRENT METAL PRICES Historic prod

  6. Slide 6: Surface Collapse of Historic Near-Surface Mined Stopes

    Historic Prince Mine Headframe Surface Collapse of Historic Near-Surface Mined Stopes 6 6

  7. Slide 7: Prince Silver Project: Not a Small Vein System

    PRINCE SILVER PROJECT: “NOT A SMALL VEIN SYSTEM” SHALLOW TO DEPTH CONTINUITY Shallow Mn-rich replacement mineralization • Historic mining progressed from shallow oxides into under gently dipping limestone sulphides to 254 m (835 ft), demonstrating vertical continuity and scale BULK-MINEABLE GEOMETRY

  8. Slide 8: Drilling Underway: New 2026 Drill Results

    DRILLING UNDERWAY: NEW 2026 DRILL RESULTS HIGHLIGHT FROM JAN. 13 & Mar 19 NEWS RELEASES: PRC-37 Historical Exploration 230.20 g/t Ag, 10.78% Mn, PRC-28: EXCEPTIONAL AG AND MN GRADES (186-189 m depth) 1.87% Pb, 2.54% Zn and Target Area 0.58 g/t Au over 7.62 m. 3.05 m @ 1,331 g/t Ag, 14.17% Mn, 2.19%

  9. Slide 9: Cross Sections Through Stratigraphic Units

    CROSS SECTIONS THROUGH STRATIGRAPHIC UNITS Units Units TARGETING DEEPER UNITS IN 2026 • Past production focused on mining the veins and mantos in the shallow A & B Shale units • Historically left the deeper CM Bed and Prospect Mountain Quartzite Unit untouched FIRST 5 HOLES HIT MULTIPLE UNITS (Relea

  10. Slide 10: Doubling Our Land Position

    DOUBLING OUR LAND POSITION LAND POSITION MORE THAN DOUBLED • Staked ~656 new acres, more than doubling the land package at the Prince Silver Project. CLAIMS ADDED ALONG PROVEN MINERAL TREND • New claims lie directly along the Great Western Fault corridor, the primary control of known CRD and vein mi

  11. Slide 11: Unlocking Potential

    UNLOCKING POTENTIAL What’s driving the project forward in 2026? Key Catalysts Q1 Q2 Q3 Q4 PHASE 1 DRILLING WITH 2 RC DRILL RIGS Added 2nd rig in mid-January to boost drilling speeds and results. PHASE 1 DRILLING RESULTS Releasing assay results from January – May from 9,000m program. PHASE 2 DRILLING

  12. Slide 12: Silver Developers - EV/AgEq

    SILVER DEVELOPERS - EV/AG EQ EV/AgEq Moz Mkt Cap (C$M) As of May 5, 2026. Based on Global NI 43-101 Resources = Measured + Indicated + Inferred. $3.82 $1,540 $3.71 $1.83 $1.48 $1.50 $1.10 $437 $436 $0.85 $391 $243 $0.36 $157 $145 $136 $35 Vizsla Silver Corp Backrock Silver Aftermath Silver Silver Ti

  13. Slide 13: U.S. Critical Minerals Advantage

    • Oct. 7 2025: Titan Mining (TSX: TI) enters non- binding LOI for US$120 M credit facility from US EXIM under the “Make More in America” initiative to fast- track their natural flake graphite feasibility study in U.S. CRITICAL New York. MINERALS ADVANTAGE • Oct. 6, 2025: Trilogy Metals (TSX: TMQ) se

  14. Slide 14: Stampede Gap Project

    STAMPEDE GAP PROJECT A District-Scale Cu-Mo Porphyry and Skarn System + Distal Pb-Zn-Ag-Au System EXTENSIVE PORPHYRY SYSTEM • The Stampede Gap Cu-Au-Mo Project is an underexplored porphyry system that has the hallmarks of a large-scale copper-molybdenum deposit. • Evidence suggests the presence of a

  15. Slide 15: Capital Structure

    CAPITAL STRUCTURE As of May 7, 2026 OWNERSHIP Shares Issued & Outstanding 59.0 million Stock Options (Avg. $0.50/share) 3.8 million Newsletter Institutional, Writers, 5% Founders and 12% Warrants (Avg. $0.61/share) 13.6 million(1) Insiders, 26% Contingent Rights 8.5 million Fully Diluted Balance 84.

  16. Slide 16: Management & Directors

    MANAGEMENT & DIRECTORS DEREK IWANAKA RALPH SHEARING CEO & Director President & Director Derek is a mining-sector executive with over 23 years of Former CEO and Founder of Luca Mining and, current CEO of investor relations, corporate development, and capital Goldgroup Mining, a growing gold producer

  17. Slide 17: An Undervalued Silver Asset

    AN UNDERVALUED SILVER ASSET In the mine-friendly "Silver State" of Nevada, LOW RISK TIER 1 MINING JURISDICTION a recognized region for world-class Ag-Au projects. Prince offers rare, U.S.-based leverage to 5 critical and LEVERAGED TO CRITICAL MINERALS strategic minerals: silver, gold, zinc, lead, an

  18. Slide 18: Contact Us

    CONTACT US Derek Iwanaka, CEO & Director info@princesilvercorp.com princesilvercorp.com CSE: PRNC OTCQB: PRNCF FRA: T13

Prince Silver — Investor Presentation (May 2026) on 6ix