King River Resources Limited · ASX:KRR

King River Resources — Investor Presentation (July 2021)

27 slides from King River Resources's investor presentation, July 2021

  1. Slide 1: Company Overview July 2021: Powering the 21st Century

    COMPANY OVERVIEW JULY 2021 POWERING THE 21 CENTURY ST Positioning King River Resources as a significant world producer of 99.99% 4N High Purity Alumina for the rapidly developing high-tech product markets

  2. Slide 2: Important Notices

    IMPORTANT NOTICES The Preliminary Feasibility Study information on the Kwinana Company considers all of the material assumptions to be based on reasonable maintain licences, permits and other regulatory approvals required in connection grounds, there is no certainty that they will prove to be correc

  3. Slide 3: Introduction & Overview

    INTRODUCTION & OVERVIEW KING RIVER RESOURCES: POWERING THE 21ST CENTURY

  4. Slide 4: Introduction

    INTRODUCTION “THE PFS RELEASED King River Resources (KRR) through its wholly owned subsidiary ARC Specialty Metals has in June 2021 completed a comprehensive Preliminary JUNE 2021 Feasibility Study (PFS) on a new High Purity Alumina Project to produce 9,000tpa 4N high purity alumina (HPA), to be loc

  5. Slide 5: Background

    BACKGROUND In late 2019 KRR commenced a new technical study on Three main hydrometallurgical compounds in the staged production of HPA by the ARC process its Kimberley located Speewah Specialty Metals (SSM) (KRR ASX release 16 June 2021) Vanadium-Titanium resources and the PFS test work identified a

  6. Slide 6: Speewah Specialty Metals Project & Gold and Copper Projects

    SPEEWAH SPECIALTY METALS PROJECT & GOLD AND COPPER PROJECTS Vanadium Pentoxide High Purity 99.51% V2O5 Titanium Dioxide High Purity 99.5% TiO2 (KRR ASX release 23 July 2018) (KRR ASX release 30 January 2018) The SSM Project located in the Kimberley region of Northern Western Australia covers Austral

  7. Slide 7: Key Technical Advisors

    KEY TECHNICAL Como Engineers: Process plant design, logistics, and capital and operating cost estimates ADVISORS Ramboll Group: Environmental and Social studies and Permitting KRR’s HPA Project development FTI Consulting: technical team consists of a small Financial modelling and analysis group of e

  8. Slide 8: Kwinana HPA Project

    KWINANA HPA PROJECT KING RIVER RESOURCES: POWERING THE 21ST CENTURY

  9. Slide 9: Kwinana HPA Project: Process Plant Layout

    KWINANA HPA PROJECT PROCESS PLANT LAYOUT Current global HPA supplies are constrained and demand is increasing significantly as 4N HPA is an essential ingredient in the production of light emitting diodes (LEDs) and lithium ion battery (LIBs) separators, both of which are used in clean energy and hig

  10. Slide 10: Kwinana HPA Location

    KWINANA HPA LOCATION The Kwinana HPA Project would be developed in the Kwinana industrial area near Perth, Western Australia where there are readily available feedstock and reagent suppliers. The exiting infrastructure, direct access to utilities, close proximity to port and a skilled workforce prov

  11. Slide 11: Kwinana HPA Flowsheet

    KWINANA HPA FLOWSHEET KRR’s ARC HPA process flowsheet uses conventional crystallisation purification and calcination technologies SIMPLIFIED and unit components, with readily sourced reagents. PROCESS CHART The international chemical industry can provide this REAGENT REAGENTS specific feedstock as i

  12. Slide 12: Summary Kwinana Project Economics

    SUMMARY KWINANA PROJECT ECONOMICS AVERAGE ANNUAL OPERATING FREE • Project Life of 25 years of operation, with ability to extend EBITDA CASH FLOW DURING FULL OPERATION • • • Production rate of 9,000 tonnes per annum of 4N HPA purity Unit cash costs of A$8,987 (US$6,740) per tonne HPA Projected sale p

  13. Slide 13: Cash Flow Projection

    CASH FLOW PROJECTION CUMULATIVE CASH FLOWS (A$M) NET CASH FLOW (A$M) 7,000 7,000 600 3,600 3,200 6,000 6,000 500 2,800 5,000 5,000 CUMULATIVE NET CASH FLOW (A$ MILLION) 400 2,400 2,000 4,000 4,000 300 1,600 A$ MILLION A$ MILLION A$ MILLION 3,000 3,000 200 1,200 2,000 2,000 800 100 400 1,000 1,000 -

  14. Slide 14: Development Plans

    DEVELOPMENT PLANS KRR has engaged a Study Manager for 2021 2022 2023 2024 2025 the Definitive Feasibility Study (DFS). Task Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Kwinana HPA Development Plan The DFS will include building of pilot plants to Prefeasibility Study further optimise the

  15. Slide 15: 4N HPA Market Overview

    4N HPA MARKET OVERVIEW KING RIVER RESOURCES: POWERING THE 21ST CENTURY

  16. Slide 16: 4N HPA Market Overview

    4N HPA MARKET OVERVIEW 4N HPA is a highly valuable commodity due to its excellent properties, chemical stability, a very high melting point, high mechanical strength and hardness (especially as a sapphire), and good thermal conductivity but high electrical insulation, making it an essential ingredie

  17. Slide 17: 4N HPA Market Overview

    4N HPA MARKET OVERVIEW Globally, high quality 4N HPA suppliers are limited, with demand rising on the back of growth in technology and energy applications, the market presents an excellent opportunity for a new HPA producer. The projected demand growth, predominantly from LEDs and EVs, provides supp

  18. Slide 18: 4N HPA Market Overview: Demand by End Use and Purity

    4N HPA MARKET OVERVIEW UNCONSTRAINED 4N+ TOTAL UNCONSTRAINED HPA DEMAND BY PURITY (PERFORMANCE-DRIVEN) HPA DEMAND BY END USE 2015-2028 (METRIC TONNES) 2015-2028 (METRIC TONNES) SOURCE: CRU INTERNATIONAL, SEPT 2020. SOURCE: CRU INTERNATIONAL, SEPT 2020. 250,000 600,000 500,000 200,000 400,000 150,000

  19. Slide 19: 4N HPA Market Overview

    4N HPA MARKET OVERVIEW KING RIVER RESOURCES: POWERING THE 21st CENTURY 19

  20. Slide 20: Synthetic Sapphires & Ceramic Coatings

    SYNTHETIC SAPPHIRES & CERAMIC COATINGS Synthetic Sapphires Ceramic Coatings LED production shows an excellent growth trend. Hybrid electric vehicles and pure battery-electric LEDs continue to transform the global lighting vehicles continue to grow rapidly and are set to take market as part of ongoin

  21. Slide 21: 4N HPA Market Overview: LIB and LED Demand

    4N HPA MARKET OVERVIEW UNCONSTRAINED HPA DEMAND FROM LIB DEMAND FOR LEDs BY SECTOR 2015-2028 (METRIC TONNES) 2015-2028 (MILLIONS OF LEDs) SOURCE: CRU INTERNATIONAL, SEPT 2020. SOURCE: CRU INTERNATIONAL, SEPT 2020. 450,000 1,400,000 400,000 1,200,000 350,000 1,000,000 300,000 800,000 250,000 200,000

  22. Slide 22: Kwinana HPA Optimisation

    KWINANA HPA OPTIMISATION There are significant optimisation opportunities for the Kwinana HPA Project that will be pursued during the Pilot studies and DFS work. Several areas of testwork and studies have been progressing in parallel to the completion of this PFS which indicate potential opportuniti

  23. Slide 23: Kwinana HPA Potential Operating Cost Savings

    KWINANA HPA POTENTIAL OPERATING COST SAVINGS During the DFS, the Company will investigate opportunities for reduction of capital and operating expenditure without compromising the process and/or product quality, as achieving the lowest potential industry capital costs and operating expenditure are c

  24. Slide 24: Speewah Specialty Metals

    SPEEWAH SPECIALTY METALS The Speewah Specialty Metals Project (SSM Project) within the Speewah Dome in the Kimberley region of northern Western Australia has evolved over the last decade into a world class deposit. The SSM Project covers Australia’s largest vanadium-in-magnetite deposit hosting pote

  25. Slide 25: Gold and Copper Projects

    GOLD AND COPPER PROJECTS The Mt Remarkable gold project is in the Kimberley region of northern Western Australia and the Treasure Creek gold and copper project is near Tennant Creek in the Northern Territory. Mt Remarkable is a high grade gold discovery and the Treasure Creek asset is prospective fo

  26. Slide 26: Gold Projects

    GOLD PROJECTS KING RIVER RESOURCES: POWERING THE 21st CENTURY 26

  27. Slide 27: Corporate Directors and Capital Structure

    CORPORATE DIRECTORS King River Resources Limited Anthony Barton Chairman ABN 67 100 714 181 Greg MacMillan Director Website: www.kingriverresources.com.au Leonid Charuckyj Director Email: info@kingriverresources.com.au ASX code: KRR CAPITAL STRUCTURE Shares on issue: 1,553,524,947 listed shares Opti

King River Resources — Investor Presentation (July 2021) on 6ix