King River Resources Limited · ASX:KRR

King River Resources — Shareholder Meeting (November 2025)

15 slides from King River Resources's shareholder meeting presentation, Nov 21, 2025

  1. Slide 1: Presentations to 2025 Annual General Meeting

    P R E S E N TAT I O N S T O 2 025 A N N U A L G E N E R A L M E E T I N G ------------------------------------------------------------------------------------------------------------- Australian Securities Exchange Announcement 21 November 2025 -------------------------------------------------------

  2. Slide 2: Managing Director's Address

    2 025 A N N U A L G E N E R A L M E E T I N G MANAGING DIRECTOR’S ADDRESS ------------------------------------------------------------------------------------------------------------- Australian Securities Exchange Announcement 21 November 2025 -------------------------------------------------------

  3. Slide 3: 2025 Annual General Meeting Presentation

    2025 ANNUAL GENERAL MEETING PRESENTATION Graham Gadsby Managing Director Project Update 21 November 2025

  4. Slide 4: Disclaimer

    Disclaimer The purpose of this presentation is to provide an update of the projects of King River Resources Limited (“KRR”) (ASX:KRR). These slides have been prepared as a presentation aid only and the information they contain should be read in conjunction with past and future announcements made by

  5. Slide 5: Project Overview

    Project Overview Tennant Creek East Tennant Creek township tenements 10 IOGC style targets Rover East Tenements 3 IOGC targets Barkly tenements 3 IOGC style targets Kurundi tenements 6 shear hosted Au targets Figure 1: Summary of KRR tenements around Tennant Creek, divided into 4 projects area Rover

  6. Slide 6: Tennant Creek Prospects

    Tennant Creek Prospects • EL31619 tenement dominated by shallow Cambrian sediments varying from 5-70m. • MLC629 granted over the historic DOT mine with exploration license pending over the surrounding area. • All target areas have detailed airborne magnetics and gravity surveys completed. Figure 2:

  7. Slide 7: Tennant Creek - Serendipity

    Tennant Creek- Serendipity Outcropping ironstone along strike (west) from DOT mine. Hematite and magnetite both observed. Figure 3: Tenement package over the DOT mine area, illustrating approved Mining License MLC629 and surrounding area. (See KRR ASX announcement 8 March 2023). Hypothesised shear-z

  8. Slide 8: Tennant Creek - Lonestar Trend

    Tennant Creek- Lonestar Trend •Previous RC drilling success has highlighted the potential of the area, having intersected substantial 20-metre-thick zones of quartz- hematite, including the presence of specular hematite, hosted in altered Warramunga siltstone. •These quartz-hematite breccias are key

  9. Slide 9: Rover East - BIF Hill East Target

    Rover East- BIF Hill East Target Rover 4 Rover 1 BIF Hill East Castille Resources Rover Deposits BIF Hill EL31617 (red) over regional magnetics (TMI-1VD) with interpreted structural corridor hosting IOGC in the Rover Gold fields to the west. Figure 5: Regional geology map of the Rover East area with

  10. Slide 10: Rover East - BIF Hill East Target

    Rover East- BIF Hill East Target North North North 300m 500m Figure 6: Magnetic (TMI-AS) bullseye anomaly (left), co-incident gravity anomaly (centre), 3D view of airborne magnetic and gravity inversion (looking North). Refer to KRR ASX announcement 31 May 2023. • Magnetic body constrained to flexur

  11. Slide 11: Kurundi – Drill Target

    Kurundi – Drill Target • High grade gold mineralisation intersected in top 40m within shear hosted shallow dipping quartz veins within basalt. • Mineralisation extends intermittently for 2km along shear zone, to a vertical depth of less than 100m. North Main Workings Workings Multiple High-Grade res

  12. Slide 12: Kurundi – Drill Target

    Kurundi – Drill Target Shear zone hosted gold near surface (looking north) • Further drilling is necessary to establish the plunge orientation of the interpreted high-grade shoot. • The mineralised system is confirmed to be open both vertically (at depth) and laterally along strike. 3D conceptual im

  13. Slide 13: Barkly – Targets under cover

    Barkly – Targets under cover • Geophysical Delineation: Detailed gravity and magnetic surveys have been finalised, effectively highlighting Epenarra East prelim geophysical survey. prospective basement units. • Seismic Confirmation: These geophysical interpretations are validated by supplementary pa

  14. Slide 14: Annual General Meeting Q&A

    ANNUAL GENERAL MEETING Q&A November 2025

  15. Slide 15: Thank You

    THANK YOU Contact us Graham Gadsby Managing Director Phone: +61 (8) 9221 8055 Email: info@kingriverresources.com.au KRR website: www.kingriverresources.com.au

King River Resources — Shareholder Meeting (November 2025) on 6ix