King River Resources Limited · ASX:KRR

King River Resources — Shareholder Meeting (November 2021)

13 slides from King River Resources's shareholder meeting presentation, Nov 15, 2021

  1. Slide 1: Annual General Meeting Presentation

    ANNUAL GENERAL MEETING 10.00 AM Monday 15 NOVEMBER 2021 Presentation

  2. Slide 2: Gold, Speewah and HPA Projects

    Gold Project Speewah Project HPA Project Commodity Gold Titanium & Vanadium HPA, Al precursors & P-CAMs Battery Materials Battery Materials Market Precious Metals Master Alloys Specialty Optics Mt Remarkable – WA Locations East Kimberley – WA Unrestricted – WA Tennant Creek – NT Status Exploration M

  3. Slide 3: 4N HPA & 5N Precursor Project

    a . Foye High Purity Metals 2M ~ High Purity Metals 4N HPA & 5N Precursor Project

  4. Slide 4: 4N HPA & 5N Precursor Project

    4N HPA & 5N Precursor Project Origin • High Purity Metals is a wholly owned subsidiary under King River Resources, focussed on developing the HPA Project. Mission • King River Resources is committed to commercialising the 4N HPA and 5N Precursor opportunities in a way that maximises the return on in

  5. Slide 5: 4N HPA & 5N Precursor Industries

    4N HPA & 5N Precursor Industries Product / 4N HPA 5N Precursors Industry (99.99% purity Al2O3) (99.999% purity Al “salts”) These can be in the form of hydroxides, sulphates or nitrates Battery Separator Coating LiB electrode coatings Battery Anode Coating LiB cathode materials Lighting LED Substrate

  6. Slide 6: Recent Milestones

    Recent Milestones December 2020 to July 2021: • The ARC HPA process is successful in treating locally available chemical feedstocks removing the need for the Kimberly based mining operation • Successful production of >4N (99.99%) purity High Purity Alumina (HPA). (25 Mar 2021) • Prefeasibility Study

  7. Slide 7: 4N HPA & 5N Precursor Process

    4N HPA & 5N Precursor Process High Purity Metals Flowsheet Previous PFS component Reagent Reagent 5N (99.999%) Purity Precursors 4N (99.99%) HPA Aluminium Type 1 Precursor High Purity Alumina Feedstock Primary Purification Aluminium Salt Decompose Chemical (LED synthetic sapphires, Solution Crystali

  8. Slide 8: 4N HPA & 5N Products

    4N HPA & 5N Products 4N HPA Total unconstrained HPA demand by purity, 2015-2028 (tonnes) LED’s ~55% Phosphor ~12% Source: CRU Consulting. Oct 2020 Sapphire ~4% 5N Precursors Semiconductors ~18% Demand for 5N precursors is an ever-evolving market and with the Li-Ion Batteries ~8% current EV and ESG r

  9. Slide 9: Market Dynamic & Application

    Market Dynamic & Application 4N HPA – Market Dynamic Source: CRU Consulting. Sept 2020 Market Pricing Estimates SGA: 99.5% 3N HPA 99.9% 4N HPA 99.99% 5N HPA 99.999% $400USD/t $6-9,000USD/t $20-40,000USD/t >$50,000USD/t

  10. Slide 10: Pilot Plant

    Pilot Plant Receipt and assembly of the laboratory scale Pilot Plant at Source Certain International is complete and commissioning is underway to refine the process and produce Type 1 Precursor product market samples for distribution.

  11. Slide 11: Type 1 Precursor & HPA

    Type 1 Precursor & HPA Type 1 Precursor & HPA Successful production of the 5N (99.999% purity) Type 1 Precursor which is calcined to create 4N (99.99% purity) HPA. Type 1 Precursor – Aluminium Salt 4N High Purity Alumina powder

  12. Slide 12: Type 2 Precursor & NCA P-CAM

    Type 2 Precursor & NCA P-CAM Type 2 Precursor & NCA P-CAM Successful production of the Type 2 Precursor which is an Aluminium Compound that can be combined with Nickel and Cobalt to produce a NCA based P-CAM. Type 2 Precursor – Aluminium Compound Nickel-Cobalt-Aluminium (NCA) based P-CAM

  13. Slide 13: Next Steps

    Next Steps Definitive Feasibility Study: 2000tpa HPA Type 1 Precursor Production Facility • The DFS remains on track to be completed by early May 2022 (As per ASX release 5 Oct 2021) Plant Location • The reduced footprint and non-toxic nature of the process provides flexibility in the location • Mul

King River Resources — Shareholder Meeting (November 2021) on 6ix