Cora Gold Ltd. · LSE:CORA

Cora Gold — Investor Presentation (September 2026)

27 slides from Cora Gold's investor presentation, Sep 25, 2026

  1. Slide 1: West African Gold Developer

    C O R P O R AT E P R E S E N TAT I O N West African Gold Developer Q3 2026 CORPORATE PRESENTATION | Q3 2026

  2. Slide 2: Disclaimer

    Disclaimer The information being released by the Cora Gold Limited (the "Company") today and attached to the RNS (the “Materials”) are being released to provide additional information with respect to the business of the Company. The Materials are not intended to form, and shall not be treated as, th

  3. Slide 3: Snapshot

    Snapshot Portfolio of prospective gold assets within two known gold belts in Mali and Senegal and located amongst PROJECT PORTFOLIO multiple operational mines. AT A GLANCE MADINA FOULBÉ, EAST SENEGAL AIM listed company advancing proven gold deposits including developing the fully funded Sanankoro Go

  4. Slide 4: Sanankoro Gold Project

    Sanankoro Gold Project Fully funded and advancing to mine construction • Located in Yanfolila Belt, Southern Mali • 1.5Mtpa conventional CIL and gravity processing plant from an open pit operation with low strip ratio oxide ore • Delivers post tax and royalties (US$3,500 gold price, Sept 20251): • 9

  5. Slide 5: Fully Funded to Production

    Fully Funded to Production Binding $120m gold stream signed in April 2026 Binding US$120 million gold stream agreed with Eagle Eye Asset Holdings (‘EEA’), the Company’s 29.9% shareholder Combined with existing equity funding following £15.7m fundraise completed in March 2026, the Stream fully funds

  6. Slide 6: Sanankoro Strategy and Timeline

    Sanankoro Strategy and Timeline 1 2 3 Complete permitting as quickly Start delivering strong free Drive organic growth from infill as possible to commence cash flow (FCF) from low strip drilling existing Inferred construction at Sanankoro for a ratio oxide ounces at resources and targeting conventio

  7. Slide 7: Construction Readiness

    Construction Readiness FEED and early works progressing in parallel to accelerate path to production FEED Early works FEED completion on target for Q4 2026 TSF: 174ha land compensation completed 3D plant modelling completed Geotechnical process plant and power station work completed Detailed enginee

  8. Slide 8: Detailed Capex Flow Sheet

    Detailed Capex Flow Sheet Conventional gravity and CIL Capital items US$m circuit optimised for oxide ore Civil works 6.9 Earth works 3.8 Machinery and equipment 47.6 Infrastructure 1.4 Transport 7.5 First fills 0.9 Mine camp 2.8 Project management 10.3 Insurance and guarantees 0.8 Tailings storage

  9. Slide 9: Opex Production Profile

    Opex Production Profile koz • Design includes a hybrid power option incorporating 80 100% solar power, delivering savings in both operating costs 70 90% and carbon emissions by reducing consumption of 40 80% ` million litres diesel over LOM 60 70% • Contractor mining planned from the start of operat

  10. Slide 10: Updated Ore Reserves

    Updated Ore Reserves Announced September 2025 • Updated Probable Reserve of 531 koz Au @ 1.13 g/t Au • Based on US$2,200/oz Au • 26% increase on 2022 Maiden Reserve • Low Strip Ratio of 4.9:1 ` • Significant upside remains: • Pit optimised Inferred Resources indicate an additional 173 koz gold could

  11. Slide 11: Mineral Resource Estimate

    Mineral Resource Estimate 2024 MINERAL RESOURCE ESTIMATE (announced January 2025) Updated JORC compliant MRE completed by Environmental Oxidation Tonnage Grade Contained metal Classification Resources Management Limited (ERM, formerly CSA Global) Zone (Mt) (g/t Au) (koz Au) Oxide 15 1.12 520 • 26% i

  12. Slide 12: 2026 Drilling Campaign

    Best intercepts from Zone B included: 2026 Drilling Campaign • 22m @ 2.24 g/t gold ('Au') from 12m in hole SC0712 • 34m @ 6.78 g/t Au from 117m in hole SC0716 Major drilling programme designed to significantly expand • Includes 9m @ 23.91 g/t Au from 128m MRE and long-term production potential. • 54

  13. Slide 13: Exploration Strategy

    Exploration Strategy HOW WILL WE DELIVER? Rank and Prioritise: Drill target advanced and high Aiming to grow the mineral resource to +2Moz 1 value exploration targets 2 Pipeline: Develop pipeline of targets Geophysics: Collect, process and interpret Magnetics 3 and induced Polarisation geophysical d

  14. Slide 14: Extensive Operational Experience

    Extensive Operational With a strong gold price, now is an opportune time to be bringing a high Experience value, low cost, oxide only gold project such as Sanankoro into production. An established team with extensive experience - BERT MONRO, CEO and proven success operating in West Africa EXPERIENCE

  15. Slide 15: Mine Permitting

    Mine Permitting • Cora has been awarded its Environmental Permit, but only following the partial lifting of the government's permitting moratorium (November 2022 - March 2025) has the Company been able to re-engage with the authorities regarding the mining permit for Sanankoro • Mali’s mining admini

  16. Slide 16: Madina Foulbé

    Madina Foulbé Potential for a large scale, in-situ gold mineralisation • Located within the Mako Gold Belt in East Senegal close to several Tier 1 gold deposits • Permit is cut by 2 regional N-S trending shear zones • Region serviced by good infrastructure within a mining friendly jurisdiction • Wit

  17. Slide 17: ESG

    Communities have welcomed us as a ESG development partner since 2017 PERMITTING • Environmental and Social Impact Assessment (ESIA) submitted July 2022 to the Government of Mali • Environmental Permit awarded October 2022, recognising Cora’s high environmental standards SOLAR AND HYBRID POWER • Sana

  18. Slide 18: Management

    Management BERT MONRO CEO and Director +16 years’ experience within the natural resources industry Previously worked for HUM advancing its +6Moz of gold resources in West Africa and operational gold mine in Mali CRAIG BANFIELD LOURENS STEENEKAMP MURRAY PATERSON SIAKA KOUMARE CFO and Company Secretar

  19. Slide 19: Investment Case

    Investment Case New Producer Share appreciation leading to production New producer outperformance: share appreciation leading to production Recognised Team Broad range of relevant experience Upside Significant further resources Strong Support Diverse investor base including high profile resource inv

  20. Slide 20: Corporate

    Corporate 24 September 2026 SIGNIFICANT SHAREHOLDERS Market Cap £81m Share Price 10.75p Eagle Eye Asset Holdings Brookstone Business Inc (Quirk Family) 52 Week Range 4.50-13.0p Lord Farmer Research Price Target1 27p / 25.8p The Marlborough Trust Maggianda Foundation (Jeremy Block) SHARE PRICE PERFOR

  21. Slide 21: Appendix

    Appendix 21 CORPORATE PRESENTATION | Q3 2026

  22. Slide 22: Non-Executive Directors

    Non-Executive Directors Track record of discovery and development in Africa ADAM DAVIDSON PAUL QUIRK ED BOWIE ANDREW CHUBB ARYANN GUPTA Non Exec Chair NED NED NED NED Extensive experience in the +15 years’ operational +24 years’ experience within Since 2014, Andrew has Head of Mergers & Acquisitions

  23. Slide 23: Operations in Mali

    Operations in Mali WEST AFRICA IS THE FASTEST GROWING AND LARGEST GOLD PRODUCING REGION, RANKING 1ST FOR DISCOVERIES OVER THE PAST DECADE Third largest gold producing country in Africa +80% • Highly developed and active mining culture production increase in West Africa over the last decade • Major i

  24. Slide 24: Reserves

    Reserves September 2025 Mineral Reserve Tonnage Grade Contained Area Oxidation Zone Classification (Mt) (g/t Au) Metal(koz Au) Oxide 3.69 1.17 139 Zone A Probable Transitional 0.03 1.64 2 Oxide 1.49 0.83 40 Zone B North Probable Transitional 0.07 1.35 3 Oxide 0.91 0.80 23 Zone B Central Probable Tra

  25. Slide 25: Saprolite Soft Rock

    Saprolite Soft Rock SIGUIRI - ANGLOGOLD ASHANTI (GUINEA) SANANKORO – CORA (MALI) PEER GROUP CHARACTERISTICS LOWER UNIT COSTS BENEFITS • No soft rock peers in London • Heavily weathered rock • Mining cost lower – no drill and • Reduced mining dilution • Nampala – soft rock and • Deep weathering profi

  26. Slide 26: Oxide Ore

    Oxide Ore Material at Sanankoro does not become hard rock until depths of +120m 0m 7m 15m 24m 42m 50m 59m 67m 70m 75m 80m 90m 26 CORPORATE PRESENTATION | Q3 2026

  27. Slide 27: coragold.com info@coragold.com

    coragold.com info@coragold.com www.linkedin.com/company/cora-gold/ @cora_gold 27 CORPORATE PRESENTATION | Q3 2026

Cora Gold — Investor Presentation (September 2026) on 6ix