Cora Gold Ltd. · LSE:CORA

Cora Gold — Investor Presentation (October 2026)

28 slides from Cora Gold's investor presentation, Oct 15, 2026

  1. Slide 1: West African gold developer

    CORPORATE PRESENTATION West African gold developer Q4 2026 CORPORATE PRESENTATION | Q4 2026

  2. Slide 2: Disclaimer

    DISCLAIMER The information being released by the Cora Gold Limited (the "Company") today and attached to the RNS (the “Materials”) are being released to provide additional information with respect to the business of the Company . The Materials are not intended to form, and shall not be treated as, t

  3. Slide 3: Snapshot

    SNAPSHOT Portfolio of prospective gold assets within two known gold belts in Mali and Senegal and located amongst multiple operational mines. AT A GLANCE PROJECT PORTFOLIO AIM listed company advancing proven gold deposits including developing the fully funded MADINA FOULBÉ, EAST SENEGAL SANANKORO, S

  4. Slide 4: Sanankoro Gold Project

    SANANKORO GOLD PROJECT Fully funded and advancing to mine construction • Located in Yanfolila Belt, Southern Mali • 1.5Mtpa conventional CIL and gravity processing plant from an open pit operation with low strip ratio oxide ore • Delivers post tax and royalties (US$3,500 gold price, Sept 2025 1): 98

  5. Slide 5: Fully funded to production

    FULLY FUNDED TO PRODUCTION Binding $120m gold stream signed in April 2026 Binding US$120 million gold stream agreed with Eagle Eye Asset Holdings (‘EEA’), the Company’s 29.9% shareholder Combined with existing equity funding following £15.7m fundraise completed in March 2026, the Stream fully funds

  6. Slide 6: Sanankoro strategy and timeline

    SANANKORO STRATEGY AND TIMELINE 1 2 3 Complete permitting as Start delivering strong Drive organic growth from quickly as possible to free cash flow (FCF) from infill drilling existing commence construction low strip ratio oxide Inferred resources and at Sanankoro for a ounces at Sanankoro targeting

  7. Slide 7: Construction readiness

    CONSTRUCTION READINESS FEED and early works progressing in parallel to accelerate path to production FEED Early works FEED completion on target for Q4 2026 TSF: 174ha land compensation completed 3D plant modelling completed Geotechnical process plant and power station work completed Detailed enginee

  8. Slide 8: Detailed capex

    DETAILED CAPEX Capital items US$m Flow Sheet Civil works 6.9 Conventional gravity and CIL circuit optimised for oxide ore Earth works 3.8 Machinery and equipment 47.6 Infrastructure 1.4 Transport 7.5 First fills 0.9 Mine camp 2.8 Project management 10.3 Insurance and guarantees 0.8 Tailings storage

  9. Slide 9: Opex production profile

    OPEX PRODUCTION PROFILE koz • Design includes a hybrid power option incorporating solar 80 100% 90% power, delivering savings in both operating costs and 70 80% carbon emissions by reducing consumption of 40 million 60 70% litres diesel over LOM 50 60% • Contractor mining planned from the start of o

  10. Slide 10: Updated ore reserves

    UPDATED ORE RESERVES Announced September 2025 UPDATED PROBABLE RESERVE OF 531 koz Au @ 1.13 g/t Au Based on 26% increase Low Strip Ratio US$2,200/oz Au on 2022 Maiden Reserve of 4.9:1 • Significant upside remains: • Pit optimised Inferred Resources indicate an additional 173 koz gold could be added

  11. Slide 11: Mineral resource estimate

    MINERAL RESOURCE ESTIMATE 31.4Mt @ 1.04 g/t Au for 1,044koz Au 2024 Mineral resource estimate (announced January 2025) Updated JORC compliant MRE completed by Environmental Resources Management Limited (ERM, formerly CSA Global) in 2024 Oxidation Tonnage Grade Contained metal Classification Zone (Mt

  12. Slide 12: 2026 drilling campaign

    2026 DRILLING CAMPAIGN Major drilling programme designed to significantly expand MRE and long - term production potential. • 12,000m+ drilling programme commenced Q2 2026 • Focused on resource growth around existing deposits (95% of metres) and testing high - priority greenfield targets (5%). • Expl

  13. Slide 13: 2026 drilling assay results

    2026 DRILLING ASSAY RESULTS Results to date demonstrate broad intervals of mineralisation outside of the 2024 MRE model, including higher - grade zones. High-grade intercepts at Zone B: Consistent mineralisation at Selin: • 22m @ 2.24 g/t gold ('Au') from 12m in hole SC0712 • 17m @ 1.65 g/t gold (‘A

  14. Slide 14: Exploration strategy

    EXPLORATION STRATEGY Aiming to grow the mineral resource to +2Moz HOW WILL WE DELVIER? 1 Rank and Prioritise: Drill target advanced and high value exploration targets 2 Pipeline: Develop pipeline of targets 3 Geophysics: Collect, process and interpret Magnetics and induced Polarisation geophysical d

  15. Slide 15: Extensive operational experience

    EXTENSIVE OPERATIONAL EXPERIENCE “ With a strong gold price, now is an opportune time to be bringing a high value, low cost, oxide only gold project An established team with extensive experience and such as Sanankoro into production. ” proven success operating in West Africa - BERT MONRO, CEO HOW WI

  16. Slide 16: Mine permitting

    MINE PERMITTING • Cora has been awarded its Environmental Permit, but only following the partial lifting of the government's permitting moratorium (November 2022 - March 2025) has the Company been able to re - engage with the authorities regarding the mining permit for Sanankoro Mali’s mining admini

  17. Slide 17: Madina Foulbé

    MADINA FOULBÉ Potential for a large scale, in - situ gold mineralisation • Located within the Mako Gold Belt in East Senegal close to several Tier 1 gold deposits • Permit is cut by 2 regional N - S trending shear zones • Region serviced by good infrastructure within a mining friendly jurisdiction •

  18. Slide 18: ESG

    ESG “ Communities have welcomed us as a development partner since 2017. ” PERMITTING SOLAR AND HYBRID POWER COMMUNITY ENGAGEMENT • Environmental and Social Impact • Sanankoro is due to have a solar focussed hybrid • Committed to operating in ways that engage positively with Assessment (ESIA) submitt

  19. Slide 19: Management

    MANAGEMENT BERT MONRO CEO and Director +16 years’ experience within the natural resources industry Previously worked for HUM advancing its +6Moz of gold resources in West Africa and operational gold mine in Mali CRAIG BANFIELD LOURENS STEENEKAMP MURRAY PATERSON SIAKA KOUMARE CFO and Company Secretar

  20. Slide 20: Investment case

    INVESTMENT CASE New producer outperformance: share appreciation leading to production New Producer Share appreciation leading to production Recognised Team Broad range of relevant experience Upside Significant further resources Strong Support Diverse investor base including high profile resource inv

  21. Slide 21: Corporate

    CORPORATE 15 OCTOBER 2026 SIGNIFICANT SHAREHOLDERS Market Cap Share Price 52 Week Range Research Price Target 1 £88m 11.5p 4.5-13.0p 27p / 25.8p Eagle Eye Asset Holdings Brookstone Business Inc (Quirk Family) Lord Farmer The Marlborough Trust Maggianda Foundation (Jeremy Block) SHARE PRICE PERFORMAN

  22. Slide 22: Appendix

    Appendix 22 CORPORATE PRESENTATION | Q4 2026

  23. Slide 23: Non-executive directors

    NON-EXECUTIVE DIRECTORS Track record of discovery and development in Africa ADAM DAVIDSON ED BOWIE RUSSELL WHITE PAUL QUIRK ARYANN GUPTA Non-Exec Chair NED NED NED NED Extensive experience in the +24 years’ experience A metallurgist by training & highly 15 years’ operational Head of Mergers & natura

  24. Slide 24: Operations in Mali

    OPERATIONS IN MALI Third largest gold producing country in Africa WEST AFRICA IS THE FASTEST GROWING AND LARGEST GOLD PRODUCING REGION, RANKING 1ST FOR • Highly developed and active mining culture DISCOVERIES OVER THE PAST DECADE • Major international companies operate in the country including B2Gol

  25. Slide 25: Reserves

    RESERVES September 2025 Mineral Reserve Tonnage Grade Contained Area Oxidation Zone Classification (Mt) (g/t Au) Metal(koz Au) Oxide 3.69 1.17 139 Zone A Probable Transitional 0.03 1.64 2 Oxide 1.49 0.83 40 Zone B North Probable Transitional 0.07 1.35 3 Oxide 0.91 0.80 23 Zone B Central Probable Tra

  26. Slide 26: Saprolite soft rock

    SAPROLITE SOFT ROCK SIGUIRI - ANGLOGOLD SANANKORO – ASHANTI (GUINEA) CORA (MALI) PEER GROUP CHARACTERISTICS LOWER UNIT COSTS BENEFITS • No soft rock peers in London • Heavily weathered rock • Mining cost lower – no drill • Reduced mining dilution • Nampala – soft rock and • Deep weathering profile a

  27. Slide 27: Oxide ore

    OXIDE ORE Material at Sanankoro does not become hard rock until depths of +120m 0m 7m 15m 24m 42m 50m 59m 67m 70m 75m 80m 90m 27 CORPORATE PRESENTATION | Q4 2026

  28. Slide 28: coragold.com

    coragold.com info@coragold.com www.linkedin.com/company/cora - gold/ @cora_gold CORPORATE PRESENTATION | Q4 2026

Cora Gold — Investor Presentation (October 2026) on 6ix