Lithium Universe Limited · ASX:LU7

Lithium Universe — Investor Presentation (February 2025)

36 slides from Lithium Universe's investor presentation, Feb 18, 2025

  1. Slide 1: Closing

    For personal use only CLOSING

  2. Slide 2: Mine, supply and demand: no current lithium converters

    For personal use only No current lithium converters Only 100 Ktpa planned MINE SUPPLY DEMAND No lithium refining experience +40 companies Quebec +20 battery manufacturers >500Mt +1% Li2O resource 1,000GW by 2028 Canada, Brazil, Africa 850,000t LCE per year

  3. Slide 3: The Lithium Gap: Current Conversion

    For personal use only THE LITHIUM GAP CURRENT CONVERSION

  4. Slide 4: The Lithium Gap

    DOWNSTREAM | REGULATION For personal use only • Cut Chinese battery material reliance • Chinese firms ordered to exit • Trade war with US • Canada on-shoring objective hasn’t changed THE LITHIUM GAP

  5. Slide 5: Problems Filling the Gap

    PROBLEMS FILLING THE GAP For personal use only • Many failures, technical difficulties • Existing Lithium producers Experienced Operators • Relative young industry • Complex chemical business Proven Technology

  6. Slide 6: Challenges with Lithium Conversion Plants Today

    For personal use only CHALLENGES WITH LITHIUM CONVERSION PLANTS TODAY

  7. Slide 7: Failed Canadian Li Projects

    FAILED CANADIAN Li PROJECTS For personal use only North American Lithium Nemaska Lithium • Shutdown 2015 • DFS completed 2018 • Spent circa CAD 250m • Spent CAD 411 m • Produced 109 t LC • Failed to start up 2019 THE COMPETITION

  8. Slide 8: Troubled LiOH Plants

    TROUBLED LiOH PLANTS For personal use only Tianqi Kwinana LiOH Albemarle Kemerton LiOH Alkaline Pressure Leach • 8 Years so far • 5 years so far • New Technology • Capital Cost Blowout • Still <20% of design rate • Unproven • > A$1 billion • Shut trains 2,3,4 • 1995 Greenbushes 5Ktpa • Care and Main

  9. Slide 9: Why Have These Projects Failed?

    WHY HAVE THESE PROJECTS FAILED? For personal use only • Nearly all the expertise is in China • Lack of operating supervision – design • Cultural transfer a problem • Chinese batch  Western continuous Our Lithium Dream Team are Operators DESIGN

  10. Slide 10: The Lithium Dream Team

    THE LITHIUM DREAM TEAM For personal use only Terry Stark Roger Pover John Loxton John Sobolewski Head of Mining Head of Processing Head of Li Refinery Chief Financial Officer Ex Galaxy GM Operations Ex Galaxy Plant Manager Ex Hatch Li Carb Plant Ex Galaxy CFO & Co Sec

  11. Slide 11: Dream Team Track Record

    DREAM TEAM TRACK RECORD Jiangsu Li Carbonate Plant For personal use only 2 Years to Commercial Production Ground Start of Project Breaking Construction Completion 21 Feb 2010 1 May 2010 6 Dec 2011 6 May 2012 (19 months) (6 months Commissioning) • Capital Cost – US$120 m • At design rate 20,000 tpa •

  12. Slide 12: Jiangsu Lithium Carbonate Plant

    For personal use only Jiangsu Lithium Carbonate Plant

  13. Slide 13: Closing the Lithium Conversion Gap

    For personal use only CLOSING THE LITHIUM CONVERSION GAP

  14. Slide 14: Closing the Lithium Gap: Bécancour Lithium Refinery

    CLOSING THE LITHIUM GAP BÉCANCOUR LITHIUM For personal use only REFINERY • Replicate the success at Jiangsu • 18,270 tpa green BG lithium carbonate plant • Bécancour, Quebec’s Battery Hub • Same flow sheet, same equipment, same suppliers

  15. Slide 15: Good Location

    GOOD LOCATION Z fs) ® © A aN «<. HIGHWAY CLOSE TO \ INFRASTRUCTURE \ - * le PORT FACILITIES

  16. Slide 16: Good Location

    GOOD LOCATION For personal use only 30,000 Spodumene Shipments Bécancour Lithium Refinery THE LITHIUM REFINERY

  17. Slide 17: Lithium Refinery Flow Sheet

    LITHIUM REFINERY FLOW SHEET Sulphuric Acid For personal use only Cooler Calciner Cooler Sulphating Hydrated Alpha Kiln Hydrated Beta Lime Spodumene Spodumene Lime Spodumene Ball Milling Water Filter Process Liquor Leaching Polishing Wash Tank Filter Mg Ca Water Alumina Precipitation Precipitation So

  18. Slide 18: Becancour Lithium Refinery

    For personal use only BECANCOUR LITHIUM REFINERY THE LITHIUM REFINERY

  19. Slide 19: Robust Process

    ROBUST PROCESS For personal use only • Refinery to process all types of spodumene • Sampled - international sources of spodumene • Imports while Canadian Li industry develops • Achieve battery grade specs 99.5% Li2CO3 1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour

  20. Slide 20: Robust DFS

    BECANCOUR LITHIUM REFINERY STRONG POSITIVE For personal use only ROBUST DFS 1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery” 1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery”

  21. Slide 21: Conservative Price Forecast

    BECANCOUR LITHIUM REFINERY CONSERVATIVE For personal use only PRICE FORECAST SC6 US$1,170/t LC $20,970/t 1. LU7 ASX Announcement 30 Sept 24 – “Strong Preliminary Feasibility for Becancour Lithium Refinery”

  22. Slide 22: Net Present Value

    BECANCOUR LITHIUM REFINERY NET PRESENT VALUE 8% For personal use only US$ 718 MILLION 1. LU7 ASX Announcement Feb 25 – “Definitive Feasibility Study”

  23. Slide 23: IRR and Payback

    BECANCOUR LITHIUM REFINERY IRR PAYBACK For personal use only 21% 3.9 YEARS 1. LU7 ASX Announcement Feb 25 – “Definitive Feasibility Study”

  24. Slide 24: EBITDA, Capex and Pre-Tax Cashflows

    BECANCOUR LITHIUM REFINERY EBITDA CAPEX For personal use only US$ 148M US$ 549M 600,000 Quebec Lithium Refinery Pre-Tax Cashflows 400,000 200,000 - US$'000 (200,000) (400,000) (600,000) 1. LU7 ASX Announcement Feb 25 – “Definitive Feasibility Study” Capex Spodumene Costs Processing Costs Revenue Net

  25. Slide 25: Funding Strategy

    FUNDING STRATEGY For personal use only Project Ownership • Sell 49% project to 1-2 strategic partners Partner 2, 25 LU7 , 51 • Target OEM with spodumene offtake • Equity from sale injected to project • Debt and Equity of 50/50 • Appointment of debt adviser • Discussions with various banks Partner 1,

  26. Slide 26: The Big Whys

    THE BIG WHY’s For personal use only • build a plant – low price environment? WHY? • build a plant - others closing theirs? • can you compete with China? • lithium carbonate not hydroxide? LU7 LITHIUM STRATEGY

  27. Slide 27: Counter Cyclical Strategy

    COUNTER CYCLICAL STRATEGY For personal use only Why build a plant in a depressed-price environment? • Been through 3-4 lithium cycles • Prices have and will always recover • Li demand from EVs and BESS growth strong • Develop a project ready for price recovery LU7 LITHIUM STRATEGY

  28. Slide 28: New Capacity Is Required

    NEW CAPACITY IS REQUIRED For personal use only Why build a plant when others are closing theirs? • Higher costs operations being closed • Operations not performing, shutting down • New efficient capacity is required for the growth • World needs non-Chinese conversion • Build “off the shelf” conversi

  29. Slide 29: Quebec Lithium Conversion

    QUEBEC LITHIUM CONVERSION For personal use only Why can you compete with China? • Access to Cheap Green Power • Nearby feedstock - Canada, Brazil and Africa • Decrease in transport costs of spodumene • End market North America LU7 LITHIUM STRATEGY

  30. Slide 30: Recovery Not If But When

    For personal use only RECOVERY NOT IF BUT WHEN

  31. Slide 31: Double Whammy

    DOUBLE WHARMMY For personal use only • Impact of supply reduction under-estimated • Dramatic reduction 17%, 21% next year • Demand is severely under-estimated • Focus on EV’s only, BESS dark horse • 1.8 TWh of batteries - 600 GWh solar plants PRICES WILL RECOVER QUICKER THAN EXPECTED LU7 LITHIUM STR

  32. Slide 32: Lithium Carbonate

    LITHIUM CARBONATE For personal use only Lithium feedstock of choice • LFP batteries technology got better • Range and performance improved • Much safer and cheaper • Li Carb feed for LFP lithium batteries • Majority of EVs have switched to LFP batteries • BESS batteries are all LFP batteries • LFP 6

  33. Slide 33: Project Advancements

    PROJECT ADVANCEMENTS For personal use only • Application 22.5 MW electricity, Hydro Quebec • Environmental survey – no showstoppers • Co-operation with W8banaki First Nation • Previous farm land • Permitting should be straight forward THE LITHIUM REFINERY

  34. Slide 34: Project MOUs

    PROJECT MOU’S For personal use only • Exclusive supply alumina silicate to Lafarge • Canada’s largest cement producer • Supply of sodium sulphate to Africa • MOU with Polytechnique for training THE LITHIUM REFINERY

  35. Slide 35: Investor Highlights

    LITHIUM DREAM TEAM For personal use only Proven Lithium Track Record PROVEN TECHNOLOGY Derisking Lithium Conversion Technology BÉCANCOUR LITHIUM REFINERY Competitive & Closing the Conversion Gap INVESTOR HIGHLIGHTS

  36. Slide 36: Cautionary Statements

    CAUTIONARY STATEMENTS Information Required by Listing Rules For personal use only The Becancour Lithium Refinery Definitive Feasibility Study (PFS) does not rely upon estimated ore reserves / and or mineral resources. The spodumene concentrate feedstock for the proposed refinery has been assumed to

Lithium Universe — Investor Presentation (February 2025) on 6ix