Royal Bafokeng Platinum Ltd

Royal Bafokeng Platinum — Non-Deal Roadshow (April 2013)

31 slides from Royal Bafokeng Platinum's roadshow presentation, April 2013

  1. Slide 1: A compelling platinum investment

    Slide 1: A compelling platinum investment

    A compelling platinum investment Investor presentation Asia roadshow April 2013 www.bafokengplatinum.co.za

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer The information presented in this presentation is of a general nature and the forward looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

  3. Slide 3: About RBPlat

    Slide 3: About RBPlat

    About RBPlat www.bafokengplatinum.co.za 2

  4. Slide 4: About Royal Bafokeng Platinum (RBPlat)

    Slide 4: About Royal Bafokeng Platinum (RBPlat)

    About Royal Bafokeng Platinum (RBPlat) • Black-owned and controlled, mid-tier PGMs producer • Compliant with and exceeds the 2014 BEE ownership target per Mining Charter • Community owned at 56.6% by Royal Bafokeng Nation (RBN) • Supportive and well-capitalised shareholders • SLP projects aligned wi

  5. Slide 5: Our business

    Slide 5: Our business

    Our business www.bafokengplatinum.co.za 4

  6. Slide 6: Quality resource with attractive prill splits

    Slide 6: Quality resource with attractive prill splits

    Quality resource with attractive prill splits Description 100% Inclusive Resource RBPlat 67% Merensky Mt 4E g/t 4E Moz Mt 4E g/t 4E Moz BRPM 4.23% 4.32% Merensky Measured 14.96 7.58 3.64 10.02 7.58 2.44 Pt% Indicated 7.66 6.97 1.72 5.13 6.97 1.15 Pd% Inferred 7.81 8.03 2.02 5.23 8.03 1.35 Rh% Merens

  7. Slide 7: Quality high-grade resource: resources versus production

    Slide 7: Quality high-grade resource: resources versus production

    Quality high-grade resource Resources versus production Bubble size = 4E PGM production 300 250 Zimplats Lonmin 200 Resource size, (Moz 4E) Amandelbult 150 ILA 100 Bokoni Modikwa BRPM JV: RPM 72.4Moz 6.11 g/t (4E) 50 Zondereinde Marula 0 2 3 4 5 6 7 BRPM JV – Pre Styldrift -50 Source: SFA (Oxford),

  8. Slide 8: Long-term Merensky bias

    Slide 8: Long-term Merensky bias

    Long-term Merensky bias • Industry : 2000 vs 2012 • Merensky contribution declined from 70% to 30% • Average head grade reduced by 40% • Platinum production per employee reduced by 40% • Styldrift • High grade Merensky • Pt:Pd ratio of 2.3 : 1 • High base metal revenue contribution • Low cost mechan

  9. Slide 9: Long-term shallow depth mining

    Slide 9: Long-term shallow depth mining

    Long-term shallow depth mining 0 Metres below surface (mbs) 500 1,000 1,500 Source : SFA Oxford 2,000 2,500 South Africa: 2010 South Africa: 2020 • Styldrift is a high quality Merensky asset at 13% shallow depth 35% 31% 33% 18% • Styldrift and BRPM cash margins first quartile Styldrift Styldrift 19%

  10. Slide 10: Competitive position on the industry cost curve

    Slide 10: Competitive position on the industry cost curve

    Competitive position on the industry cost curve Source : Chamber of Mines – 21 January RSA PGM Mining Sector Briefing Note (JP Morgan - Cazenove) www.bafokengplatinum.co.za 9

  11. Slide 11: Broad business strategy

    Slide 11: Broad business strategy

    Broad business strategy • Maximise existing assets • In a safe manner • Move down the cost curve • Generate cash to fund growth • Grow organically • Styldrift I – Mechanised mining – less frequent injuries and lower costs • Styldrift II – Unlocking value by bringing Styldrift II forward as an expans

  12. Slide 12: Our operations

    Slide 12: Our operations

    www.bafokengplatinum.co.za Our operations

  13. Slide 13: Well-established shallow Merensky producer on Western Limb

    Slide 13: Well-established shallow Merensky producer on Western Limb

    Well-established shallow Merensky producer on Western Limb, well-developed infrastructure • 14 years of operation • Well-understood, defined geology • Well established mining platform • Experienced management team • Full mining and concentrating infrastructure on BRPM site (200,000tpm) • Shallow dep

  14. Slide 14: BRPM: Layout and access

    Slide 14: BRPM: Layout and access

    BRPM: Layout and access Layout Shaft layout Vent shaft (surface to level 9) Chairlift decline Belt decline Material decline Level 9 Vertical dams Level 10 Source: Company Orebody access North Shaft South Shaft Sample prep Ore conveyed to plant Belt riding www.bafokengplatinum.co.za 13

  15. Slide 15: Well-developed infrastructure

    Slide 15: Well-developed infrastructure

    Well-developed infrastructure North Shaft South Shaft Concentrator Plant ISA Mill ISA mill position CCO www.bafokengplatinum.co.za 14

  16. Slide 16: Well-understood orebody

    Slide 16: Well-understood orebody

    Well-understood orebody • Cumulative drilling up to end of 2012 • Primary drillholes : 6,051 • No. reef intersections : 9,230 • Total metres : 1,411km • 2012 Exploration RBPlat: • Primary drillholes : 28 • No. reef intersections : 80 • Total metres : 14,248m • 2013 Planned exploration: • Total drill

  17. Slide 17: BRPM 2012 performance

    Slide 17: BRPM 2012 performance

    BRPM 2012 performance Description Units 2012 2011 Var Var % Phase II Fatal injuries No 1 0 -1 100% • North shaft completed : Sept 2011 7.8 koz Safety- LTIFR /200 000 0.68 0.91 0.23 26% • South shaft completed : Sept 2012 Safety – SIFR /200 000 0.42 0.47 0.05 10% • R110 million saving Tonnes milled k

  18. Slide 18: BRPM Q1-2013 performance

    Slide 18: BRPM Q1-2013 performance

    BRPM Q1-2013 performance Description Units 2013 2012 Var Var % Safety Fatal injuries No 0 1 -1 100% • LTIFR and SIFR improved by 17% and 20% respectively 7.8 koz Safety- LTIFR /200 000 0.36 0.45 0.23 20% • 2.0 million fatality-free shifts achieved 2nd April Safety – SIFR /200 000 0.56 0.67 0.05 17%

  19. Slide 19: Styldrift project progress

    Slide 19: Styldrift project progress

    Styldrift project progress Description Unit Plan Actual Var Optimisation study Progress • Bord widths reduced from 13m to 8m Overall progress % 32 34 1.9 • Ramp-up extended from 27 to 36 months M ain shaft m 616 614 -2 • Footwall trucking replaced by on reef conveyors Service shaft m 635 636 1 • Sha

  20. Slide 20: 600 level reef intersection

    Slide 20: 600 level reef intersection

    600 level reef intersection Merensky Reef grade profile Grade (g/t) 4E 0 2 4 6 8 10 12 14 16 18 20 22 0.1 0.2 Mining Width 0.3 1.8 to 2.0m Merensky Pyroxenite 0.4 0.5 0.6 0.7 BRC chrome Pegmatoidal Pyroxenite 0.8 0.9 Width (m) 1.0 1.1 Bottom Reef Contact 1.2 1.3 1.4 Mottled Anorthosite 1.5 1.6 1.7 1

  21. Slide 21: Styldrift schedule & cash flow

    Slide 21: Styldrift schedule & cash flow

    Styldrift schedule & cash flow Project Phase 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Engineering & Design 2008 - 2015 Pre-Sink Infrastructure 2009 - 2011 • Rock winder Surface Infrastructure 2010 - 2016 • Main offices • Change house Main Shaft Sinking 2011 - 2014 • Surface silos

  22. Slide 22: UG2 contribution

    Slide 22: UG2 contribution

    UG2 contribution 6000 North Shaft 1,400 1,200 UG2 5000 1,000 800 ktpa Styldrift I Merensky 600 Merensky 400 4000 200 - 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 ktpa 3000 BRPM UG2 South Shaft 2000 1,400 1,200 1,000 Increasing UG2 BRPM Merensky 800 ktpa 1000 600 UG2 Merensky 400 200 - 0 2013

  23. Slide 23: Styldrift II

    Slide 23: Styldrift II

    Styldrift II Study program • Concept study completed in May 2012 • Pre-feasibility initiated in November 2012 • Completion planned for H2 2014 Key facts • Resource area ± 24 million m2 • 40% of BRPM JV resource base • Average depth 1,150m @ ave. 90 dip • Underlain by the Swartklip Facies – Stable fo

  24. Slide 24: Ideally positioned for regional consolidation

    Slide 24: Ideally positioned for regional consolidation

    Ideally positioned for regional consolidation • Impala 6# and 8# royalty • UG2 mining only • Extraction over ca 7 years • 0.78 Moz (4E) • Impala 20# royalty • Merensky and UG2 • Extraction over ca 30 years • 2.20 Moz (4E) – 1.40 Moz (4E) – Merensky – 0.80 Moz (4E) – UG2 BRPM JV Shafts Impala 6# & 8#

  25. Slide 25: Funding requirements

    Slide 25: Funding requirements

    Funding requirements www.bafokengplatinum.co.za 24

  26. Slide 26: Spending to grow

    Slide 26: Spending to grow

    Spending to grow BRPM JV capital cashflow 3,500 200 225 3,000 192 214 2,500 175 2,000 228 R'm 1,500 201 2,843 2,915 238 146 1,000 98 229 379 308 1,655 378 500 872 490 638 646 0 Expansion Replacement SIB Expansion capital > Styldrift I expenditure for 2013 planned at R872m > R300 million BRPM plant u

  27. Slide 27: Strong cash flow generation

    Slide 27: Strong cash flow generation

    Strong cash flow generation 2,500.0 732.6 238.0 2,000.0 310.0 625.9 1,500.0 1364.0 R’m 1,000.0 RBPlat 4.2 910.5 980.8 8.0 RBPlat 599.4 500.0 BRPM JV BRPM JV 383.2 311.1 0.0 Cash Cash and cash and cash Cash generated by SIB Capex Replacement Capex Expansion Capex Increase in Reduction in the Cash Cas

  28. Slide 28: Funding of Styldrift I

    Slide 28: Funding of Styldrift I

    Funding of Styldrift I • Total capital cost to the BRPM JV of R11.8 billion (US$1.3 billion) • RBPlat share (67%) funded largely by cash flow from operations (BRPM) • Quantum to be raised determined by: • Capex savings • Revenue basket price • Optimisation of BRPM cash flows • Acceptable debt level

  29. Slide 29: Investment case

    Slide 29: Investment case

    Investment case www.bafokengplatinum.co.za 28

  30. Slide 30: A compelling investment

    Slide 30: A compelling investment

    A compelling investment • Long-term Merensky bias production • In excess of 60 years life-of-mine • Shallow mines, average mining depth • 400 metres at BRPM • 661 metres at Styldrift • Attractive margin operations with scope for cost reduction • Competitive position on industry cost curve • Focused

  31. Slide 31: Contact details

    Slide 31: Contact details

    Contact details Lindiwe Montshiwagae Investor Relations Manager Royal Bafokeng Platinum The Pivot, No 1 Monte Casino Boulevard, Block C, Floor 4, Fourways, 2021 Tel: +27 (0) 10 590 4517 Fax: +27 (0) 86 219 5131 Mobile: +27 (0) 82 920 7803 Email: lindiwe@bafokengplatinum.co.za www.bafokengplatinum.co