Zecon Bhd. · MYX:ZECON

Zecon Bhd — Investor Presentation (May 2026)

34 slides from Zecon Bhd's investor presentation, May 2026

  1. Slide 1: Kota Petra Green Technology Park (KPGTP)

    KOTA PETRA GREEN TECHNOLOGY PARK (KPGTP) 1

  2. Slide 2: Kota Petra Green Technology Park (KPGTP)

    KOTA PETRA GREEN TECHNOLOGY PARK (KPGTP) 3,000-Acre KPGTP, Zecon Group’s flagship Green Development Masterplan is aligned with Sarawak Government’s PCDS-2030. KPGTP’s 300MWac Large-Scale Agrivoltaics Solar Farm will generate clean power in support of the State’s Green Energy Agenda. Lower land cost

  3. Slide 3: KPGTP – Ideal Investment Destination

    KPGTP – Ideal Investment Destination APPROVED GREEN TECHNOLOGY PARK Managed Industrial Scalability Park ✓ 3,000 ACRES OF LAND ✓ Infrastructure Ready ✓ Support Services ✓ Conducive Environment For Business Growth Economic Zone Clean Energy Status ✓ 100% FOREIGN ✓ Powered by 300MWac OWNERSHIP Large-Sc

  4. Slide 4: KPGTP – Locality Map

    KPGTP – Locality Map KPGTP PROPOSED NEW KUCHING INT AIRPORT SITE 4

  5. Slide 5: KPGTP – Connectivity

    KPGTP – Connectivity Demak Laut Industrial Park (Existing) 5

  6. Slide 6: Demak Laut Industrial Park and Senari Port

    SENARI PORT Demak Laut Industrial Park (Existing) 6

  7. Slide 7: St Pac

    St Pac . . 5 ® . Low-Carbon / 2) Chemical Island SANTUBONG £ “ a REEN TECHNOLOGY PARK atin SAMARI We me, = xa Kampung sAsajaya\Ulu Goodale Mans

  8. Slide 8: Integrated Green Industrial & Commercial Precinct

    INTEGRATED GREEN INDUSTRIAL & COMMERCIAL PRECINCT Aerospace Hub & Logistics Park Green Tech Hub Urban City Centre Solar Farm Agrivoltaics Mixed Development Enterprise Data Centre Hub Education Hub Hub IMMEDIATE FOCUS GROUP Solar Farm Data Centre Agrivoltaics Hub Hi-Tech Industrial Hub Masterplan Com

  9. Slide 9: Development Timeline & Phasing Strategy

    Development Timeline & Phasing Strategy Timeline ‘25 ‘26 ‘27 ‘28 ‘29 ‘30 ‘31 ‘32 ‘33 ‘34 ‘35 ‘36 ‘37 ‘38 ‘39 ‘40 ‘41 ‘42 ‘43 ‘44 ‘45 Phase 1 lays the foundation for Solar Farm Agrivoltaics energy and digital infrastructure. Completion Data Centre Phase 1 of connecting bridge Current Status: Mixed De

  10. Slide 10: Key Economic Impact Assessment - KPGTP

    KEY ECONOMIC IMPACT ASSESSMENT - KPGTP In Full Operational Capacity in 2045 • GDP contribution of RM6.4% (2% of Sarawak GDP by 2045) Total GDP contribution of RM11 billion with indirect effect, supply chain and economic spending from additional job creation • Approximately 20,000 Direct Jobs and 50,

  11. Slide 11: KPGTP Masterplan Zoning & Blocking

    KPGTP MASTERPLAN ZONING & BLOCKING 11

  12. Slide 12: KPGTP Title Blocking

    KPGTP Title Blocking Lot Acres Years leasehold 505 210.0 60 (Expires in June 2076) 462 500.4 99 (Expires in June 2098) 464 42.2 99 (Expires in June 2098) 470 1,178.5 99 (Expires in June 2098) 471 374.8 60 (Expires in June 2076) 14 694.4 60 (Expires in June 2076) 3,000 acres • Fully Owned by Zecon Gr

  13. Slide 13: KPGTP Masterplan Overall Roading Plan & Solar Transmission Line

    KPGTP MASTERPLAN OVERALL ROADING PLAN & SOLAR TRANSMISSION LINE (SPA APPROVAL) 13

  14. Slide 14: KPGTP Proposed Masterplan – Zoning

    KPGTP Proposed Masterplan Zoning Approved By SPA (Jan 2026) 14

  15. Slide 15: KPGTP Proposed Masterplan – Roading & Transmission Line

    KPGTP Proposed Masterplan Roading & Transmission Line to 132KV SEB Substation Approved By SPA (Jan 2026) 15

  16. Slide 16: KPGTP Masterplan Sarawak Digital Connectivity (SDEC)

    KPGTP MASTERPLAN SARAWAK DIGITAL CONNECTIVITY (SDEC, Strategic Partner) 16

  17. Slide 17: Trunk Design and Cable Capacity

    Trunk Design Total Cable Cable Capacity Length 8 Fibre 20Tbps per >5,000 km i Fibre Pair Thailand es ey Z Frere oon © “SDEC Digitalising Sarawak S11 SSE Hainan Lingsiar o. Ss Supplier ae HMN | Bosse Philippines OLa Union Tech S64 = ao Connectivity through S5 @ Singapore Kuching o—> @ Hong Kong Singa

  18. Slide 18: KPGTP Masterplan Current Progress

    KPGTP MASTERPLAN CURRENT PROGRESS 18

  19. Slide 19: Solar Farm (Lot 471) Site Clearance

    Solar Farm (Lot 471) Site Clearance 19

  20. Slide 20: Land Clearing & Earth Bund Works In Progress

    Land Clearing & Earth Bund Works In Progress for Phase 1 Large-Scale Solar & Data Centres Sites 20

  21. Slide 21: Land Clearing & Earth Bund Works In Progress

    Land Clearing & Earth Bund Works In Progress for Phase 1 Large-Scale Solar & Data Centres Sites 21

  22. Slide 22: Land Clearing & Earth Bund Works In Progress

    Land Clearing & Earth Bund Works In Progress for Phase 1 Large-Scale Solar & Data Centres Sites sumitoma ~

  23. Slide 23: Bridge Works To Solar Site (Serai) 130 Meters

    Bridge Works To Solar Site (Serai) 130 Meters 23

  24. Slide 24: Temporary Bridge Works To Solar Farm Site In Progress

    Temporary Bridge Works To Solar Farm Site In Progress The Temporary Steel Bridge Is Expected To Be Fully Completed By End of June 2026 24

  25. Slide 25: 130m Temporary Bridge Designed for 120 Tonnes

    130m, designed to carry up to 120 tonnes. Expected To Be Fully Completed By End of June 2026 25

  26. Slide 26: Temporary Bridge Main Access Until Serai Bridge in 2028

    The Temporary Bridge will be the main access to the Solar Site until the completion of the Serai Bridge in 2028 26

  27. Slide 27: Phase 1 – 100MWac Agrivoltaics Solar Farm Site

    New Sejingkat Bridge Serai Bridge Site KOTA PETRA GREEN TECHNOLOGY PARK Phase 1 – 100MWac Agrivoltaics Solar Farm Site 27

  28. Slide 28: Bridge Works To KPGTP (Santubong) 260m

    Bridge Works To KPGTP (Santubong) 260m Meters 28

  29. Slide 29: Bridge Works To KPGTP (Santubong)

    Bridge Works To KPGTP (Santubong) Bridge Embankment 29

  30. Slide 30: 30

    30

  31. Slide 31: 31

    31

  32. Slide 32: KPGTP Masterplan Strategic Collaboration

    KPGTP MASTERPLAN STRATEGIC COLLABORATION 32

  33. Slide 33: ZECON Signing of Agreements

    ZECON Signing of Agreements SIGNING OF MOU 16 OCTOBER 2024 Zecon, SDEC and CENTEXS entered into the MOU to achieve mutual benefit for all parties in the development of a 3,000-acre Kota Petra Green Technology Park (KPGTP) • ZECON - landowner & master developer • SDEC - digital technology & telecommu

  34. Slide 34: ZECON Signing of Agreements – 30-Year Power Purchase Agreement

    ZECON Signing of Agreements SIGNING A 30-YEAR POWER PURCHASE AGREEMENT WITH SYARIKAT SESCO BERHAD 100MWac Solar Power Scheduled COD 31 Dec 2027 ON 22 OCTOBER 2025 At IDECS 2025 BCCK, KUCHING 34

Zecon — Investor Presentation (May 2026) on 6ix