Slide 1: Kota Petra Green Technology Park (KPGTP)
KOTA PETRA GREEN TECHNOLOGY PARK (KPGTP) 1
Slide 2: Kota Petra Green Technology Park (KPGTP)
KOTA PETRA GREEN TECHNOLOGY PARK (KPGTP) 3,000-Acre KPGTP, Zecon Group’s flagship Green Development Masterplan is aligned with Sarawak Government’s PCDS-2030. KPGTP’s 300MWac Large-Scale Agrivoltaics Solar Farm will generate clean power in support of the State’s Green Energy Agenda. Lower land cost
Slide 3: KPGTP – Locality Map
KPGTP – Locality Map KPGTP PROPOSED NEW KUCHING INT AIRPORT SITE 3
Slide 4: KPGTP – Connectivity
KPGTP — Connectivity A To SenariPort and Sa, / \Future Deep Sea Port) 4
Slide 5: KPGTP – Ideal Investment Destination
KPGTP – Ideal Investment Destination APPROVED GREEN TECHNOLOGY PARK Managed Industrial Scalability Park ✓ 3,000 Acres of Land ✓ Infrastructure Ready ✓ Support Services ✓ Conducive Environment For Business Growth Economic Zone Clean Energy Status ✓ 100% Foreign Ownership ✓ Powered by 300MWac Large-Sc
Slide 6: Core components
KPGTP is designed with 9 key sections which will house economic activities across multiple sectors such as Aerospace, Hi-Tech Manufacturing, etc. Aerospace Hub & Logistics Park Green Tech Hub Urban City Centre Solar Farm Enterprise Agrivoltaics Data Centre Hub Mixed Development Hub Education Hub Hi-
Slide 7: KPGTP Masterplan Zoning & Blocking
KPGTP MASTERPLAN ZONING & BLOCKING 7
Slide 8: 3,000 acres
KPGTP Title Blocking Lot Acres Years leasehold 505 210.0 60 (Expires in June 2076) 462 500.4 99 (Expires in June 2098) 464 42.2 99 (Expires in June 2098) 470 1,178.5 99 (Expires in June 2098) 471 374.8 60 (Expires in June 2076) 14 694.4 60 (Expires in June 2076) 3,000 acres • Fully Owned by Zecon Gr
Slide 9: Proposed Masterplan Zoning
KPGTP Proposed Masterplan Zoning 9
Slide 10: KPGTP Masterplan Overall Roading Plan
KPGTP MASTERPLAN OVERALL ROADING PLAN 10
Slide 11: KPGTP Masterplan Overall Connectivity Proposed Roading Plan
KPGTP MASTERPLAN OVERALL CONNECTIVITY PROPOSED ROADING PLAN 11
Slide 12: Phase 1 Large-Scale Solar Agrivoltaics Development
KPGTP MASTERPLAN PHASE 1 LARGE-SCALE SOLAR AGRIVOLTAICS DEVELOPMENT PROPOSED LAYOUT AND TRANSMISSION 12
Slide 13: Phase One 100MWac LSS Agrivoltaics Development
KPGTP Phase One 100MWac LSS Agrivoltaics Development At Lot 471 Proposed Layout 13
Slide 14: Transmission Route 100MWac LSS
Transmission Proposed SEB 275kv Demak Laut Route Substation 100MWac LSS Site To SEB 132kv Substation at Sejingkat (Via SEB Proposed 275kv Demak Laut The Right-of-Way (ROW) has been Approved by the Substation) Sarawak Planning Authority) 14
Slide 15: KPGTP Masterplan Current Progress
KPGTP MASTERPLAN CURRENT PROGRESS 15
Slide 16: Approvals
Approvals Economic Zone Electricity License 26 September 2024 (MUTS letter On 5 February 2025 (MUTS letter R/KUT/MMKN/G/41.JLD.1(6), 20 Nov 2024) S/KUT/700-7/1-1/255 JLD.1 (4) 6 Feb 2025) ✓ Sarawak Government approved as ✓ Sarawak Government approved Zecon’s Green Technology Park application for lic
Slide 17: Solar Farm (Lot 471) Site Clearance
Solar Farm (Lot 471) Site Clearance 17
Slide 18: Land Clearing Works In Progress for Phase 1
Land Clearing Works In Progress for Phase 1 Large- Scale Solar & Data Centres Site 18
Slide 19: Bridge Works To Solar Site (Serai) 130 Meters
Bridge Works To Solar Site (Serai) 130 Meters 19
Slide 20: Bridge Works To Solar Farm Site In Progress
Bridge Works To Solar Farm Site In Progress The Temporary Steel Bridge Is Expected To Be Fully Completed By End of April 2026 20
Slide 21: Bridge Works To KPGTP (Santubong) 260m
Bridge Works To KPGTP (Santubong) 260m Meters 21
Slide 22: Bridge Works To KPGTP (Santubong)
Bridge Works To KPGTP (Santubong) Bridge Embankment 22
Slide 23: Bridge Works To KPGTP (Santubong)
Bridge Works To KPGTP (Santubong) Bridge Embankment 23
Slide 24: Strategic Partnerships and Collaborations
KPGTP Strategic Partnerships and Collaborations Other collaborations Sarawak Incorporated Sdn Bhd • To develop and establish a Sarawak Digital Economic Centre for Technology sustainable and technologically Corporation Berhad Excellence Sarawak advanced Agrivoltaics farming system • Integrates pineap
Slide 25: ZECON Signing of Agreements
ZECON Signing of Agreements SIGNING OF MOU 16 OCTOBER 2024 SIGNING OF SCA ON 19 NOVEMBER 2024 25
Slide 26: ZECON Signing of Agreements
ZECON Signing of Agreements SIGNING A 30-YEAR POWER PURCHASE AGREEMENT WITH SYARIKAT SESCO BERHAD 100MWac Solar Power Scheduled COD 31 Dec 2027 ON 22 OCTOBER 2025 At IDECS 2025 BCCK, KUCHING 26
Slide 27: ZECON Signing of Agreements
ZECON Signing of Agreements SIGNING OF MoU ZECON EDRA POWER HOLDINGS SDN BHD NEUTRINOS ENGINEERING PTE LTD PROPOSED INTEGREATED ENERGY COMPLEX AT KPGTP ON 16 OCTOBER 2025 AT SARAWAK MEGA FAIR 2025 SUNTEC CITY, SINGAPORE 27
Slide 28: Zecon's Request for Incentive Support
ZECON’S REQUEST FOR INCENTIVE SUPPORT Applications To • Ministry of Finance • Malaysia Investment Development Authority 28
Slide 29: Proposed Solar Farm Business Model and Incentive Wishlist
Incentive support required for Phase 0 Proposed Solar Farm Business Model ZONE A: SOLAR FARM AGRIVOLTAICS | INCENTIVE WISHLIST Sale and re-purchase of solar energy Sale of solar energy Tax incentives for Zecon Solar Sdn Bhd (Landowner) SESCO’s Grid Line Data centres & Industries • Zero percent corpo
Slide 30: Incentive support required for Phase 0 (cont'd)
Incentive support required for Phase 0 (cont’d) DATA CENTRE | INCENTIVE WISHLIST MIXED DEVELOPMENT | INCENTIVE WISHLIST (PRELIMINARY) Tax incentives for Zecon Solar Sdn Bhd (Landowner) Approved Incentive Framework for Kota Petra Green Technology Park 1 • Zero percent corporate tax rate for 15 years
Slide 31: Incentive support required for Phase 1 (2030 onwards)
Incentive support required for Phase 1 (2030 onwards) ENTERPRISE HUB | INCENTIVE WISHLIST HI-TECH INDUSTRIAL HUB | INCENTIVE WISHLIST Kota Petra Green Technology Park Approved Incentive Framework for (KPGTP) Approved Incentive Framework for qualifying investors qualifying investors Tiered tax incent
Slide 32: Incentive support required for Phase 2 & 3 (2032 onwards)
Incentive support required for Phase 2 & 3 (2032 onwards) URBAN CITY CENTRE | INCENTIVE WISHLIST Approved Incentive Framework for qualifying investors Kota Petra Green Technology Park Zero percent corporate tax rate for 10 years on (KPGTP) AEROSPACE & LOGISTICS | INCENTIVE WISHLIST the chargeable in