Tasman Resources Ltd · ASX:TAS
Tasman Resources — Investor Presentation (April 2010)
28 slides from Tasman Resources's investor presentation, Apr 6, 2010
Slide 1: Vulcan: The Next Olympic Dam?
For personal use only Vulcan The Next Olympic Dam?
Slide 2: Tasman Group Corporate Overview
Tasman Group Corporate Overview For personal use only Tasman Resources Ltd Minerals Cu, Au, U, Ag, (TAS) Pb, Zn, Ni , Oil Shale 17.8%* 28.1%* Eden Energy Ltd Fission Energy Ltd (EDE) (FIS) 100% Hydrogen & Hythane 50% 50% Pyrolysis Mt Thirsty Co-Ni 50% Coal Bed Methane 100% 100% SA Natural Gas Uraniu
Slide 3: Tasman Resources: Project Locations
Tasman Resources: Project Locations For personal use only Mirrica: Au, Cu/Zn/Pb Lake Torrens: IOCGU Parkinson Dam: Au/Ag/Zn/Pb Central Gawler: Au, Ni Streaky Bay: U
Slide 4: Lake Torrens Project
Lake Torrens Project For personal use only • Over 2,000 km2 of tenements adjacent to Olympic Dam • Several IOCGU systems confirmed and interpreted: Vulcan, Titan – confirmed; Zeus - interpreted Billy Barnes, Atlas, Marathon Sth. – IOCGU prospects • Vulcan - new IOCGU system discovered Nov.2009 from
Slide 5: Olympic Dam
Olympic Dam For personal use only • World’s largest IOCGU deposit (350 to 1000m depth) worlds largest known uranium deposit ~ 2.54mt contained U3O8 (~40% of world U3O8 ) worlds fourth largest copper deposit: ~79mt contained Cu world’s fifth largest gold deposit: ~79moz Au • Australia’s largest hard
Slide 6: Lake Torrens Project
For personal use only Lake Torrens Project
Slide 7: Lake Torrens Project: Targets
Lake Torrens Project: Targets For personal use only
Slide 8: Vulcan: S-N Seismic Reflection Profile
Vulcan: S- S-N Seismic Reflection Profile For personal use only S SHD 1 VUD 001 N Cover Sediments Basement Strong Seismic Reflectors in Basement – IOCGU? Geoscience Australia – PIRSA 2003 Traverse OD 1
Slide 9: Olympic Dam: W-E Seismic Reflection Profile
Olympic Dam: W- W-E Seismic Reflection Profile For personal use only W E Cover Sediments Basement Seismic Reflectors in Basement (Olympic Dam Breccia Complex, SE limb) Geoscience Australia – PIRSA 2003 Traverse OD 2
Slide 10: Vulcan Gravity
Vulcan Gravity For personal use only VUD001 SHD1 Residual Gravity Image and 0.1mgal Bouger Gravity Contours
Slide 11: Vulcan Drill Target
For personal use only Vulcan Drill Target
Slide 12: Vulcan: Schematic Cross Section A - B
Vulcan: Schematic Cross Section A - B For personal use only
Slide 13: Olympic Dam: Initial Drilling
Olympic Dam: Initial Drilling For personal use only
Slide 14: Olympic Dam – Vulcan: Area Comparison
Olympic Dam – Vulcan: Area Comparison For personal use only OD breccia complex Olympic Dam approx. 10km2 Vulcan 2km Vulcan interpreted gravity (hematite-rich) target approx. 11km2 2km
Slide 15: Olympic Dam - Vulcan: Residual Gravity Comparison
Olympic Dam - Vulcan: Residual Gravity Comparison (calculated residual gravity response if Vulcan at same depth as OD) For personal use only Olympic Dam Vulcan 2km 2km
Slide 16: Vulcan – Carapateena: Bouguer Gravity Comparison
Vulcan – Carapateena: Bouguer Gravity Comparison For personal use only Vulcan Carapateena
Slide 17: Vulcan Drill Core: VUD
Vulcan Drill Core: VUD 001 For personal use only NQ Drill Core: depth approx. 928m
Slide 18: Vulcan VUD 001: Breccia Styles
Vulcan VUD 001: Breccia Styles For personal use only Heterolithic, sulphide- rich breccia Mineralised, hematite matrix- rich breccia (py, cpy) Heterolithic, carbonate breccia (py, cpy, hem)
Slide 19: VUD 001: Copper Mineralisation
VUD 001: Copper Mineralisation For personal use only cpy hem py
Slide 20: VUD 001: Copper Mineralisation
VUD 001: Copper Mineralisation For personal use only hem carb cpy
Slide 21: Vulcan VUD 001: Down-hole correlation of IOCGU metals
Vulcan VUD 001: Down-hole correlation of IOCGU metals For personal use only Cover Sediments Cover Sediments Basement Basement U3O8 Cu Au Cu
Slide 22: Vulcan Project: Exploration Program
Vulcan Project: Exploration Program For personal use only • Gravity infill and modelling completed • VUD001 – assaying/ geological interpretation completed • IOCGU deposit model confirmed based on latest data • Follow up drilling planned April – May 2010 • Resolve aboriginal heritage issues over sou
Slide 23: Regional Targets: Zeus
Regional Targets: Zeus For personal use only
Slide 24: Parkinson Dam Gold – Silver Project
Parkinson Dam Gold – Silver Project For personal use only
Slide 25: Parkinson Dam – High Grade Mineralisation
Parkinson Dam – High Grade Mineralisation For personal use only • PD 63: 21m @ 21g/t Au, 83g/t Ag (inc 9m @ 31g/t Au, 152 g/t Ag) • Classic epithermal veining • Gold (electrum ~ 35% Ag) • PD 64: 3m @ 18.1% Pb, 1.1% Zn, 44.2g/t Ag • Epithermal mineralisation > 4.5 km2
Slide 26: Parkinson Dam: High Grade Au/Ag plus Zn/Pb
Parkinson Dam: High Grade Au/Ag plus Zn/Pb For personal use only PD 63 - high grade Au/Ag Multiple Zones of thick Zn/Pb (Ag), e.g. *50m @ 0.9% Zn, 0.3% Pb *185m+ @ 0.3% Zn, 0.1% Pb Vector pointing towards higher grades to be drilled
Slide 27: Competent Person's Statement
Competent Person’s Statement For personal use only The information in this presentation that relates to Exploration Results and Activities is based on information compiled by Robert Smith and Michael Glasson who are Members of the Australian Institute of Geoscientists. Robert Smith and Michael Glass
Slide 28: Disclaimer
Disclaimer For personal use only The interpretations and conclusions reached in this presentation are based on current geological theory and the best evidence available to the authors at the time of writing. It is the nature of all scientific conclusions that they are founded on an assessment of pro
Tasman Resources — Investor Presentation (April 2010) on 6ix