Phosco Ltd · ASX:PHO

Phosco — The Australian Potash & Phosphate Conference 2022

20 slides from Phosco's conference presentation, Nov 22, 2022

  1. Slide 1: Advancing the World-Class Chaketma Phosphate Project

    For personal use only Advancing the World-Class Chaketma Phosphate Project The Australian Potash & Phosphate Conference, Perth – November 2022

  2. Slide 2: Disclaimer - Important Information

    Disclaimer - Important Information For personal use only The purpose of this presentation is to provide general information about PhosCo Ltd (PhosCo or the Company). It is not recommended that any person makes any investment decision in relation to the Company based solely on this presentation. This

  3. Slide 3: Phosphate - a Critical Raw Material

    Phosphate - a Critical Raw Material Essential to improving crop yields to meet food For personal use only demands for the world’s growing population and address global food security concerns  Finite and non-renewable material US$317.50/t  Needs replenishing in cultivated land where soils become de

  4. Slide 4: Growing Demand Beyond Agriculture

    Growing Demand Beyond Agriculture Electric cars boost demand For personal use only  Lithium Iron Phosphate (LFP) batteries account for ~25% of global cathode production  Nickel and cobalt-free, better for the environment  Thermal stability and good long-term performance  The demand for LFP batte

  5. Slide 5: PhosCo's Strategy

    PhosCo’s Strategy For personal use only 1 2 3 Complete Chaketma Build World Class Advance to Fully Bankable Feasibility Study Phosphate Mine Integrated Fertilizer Facility  High-grade, large scale  Target low-cost strip mining  Capture higher margins on resource  International funding end-produc

  6. Slide 6: Chaketma Project

    Chaketma Project Potential Tier-1, long life mine with For personal use only downstream fertiliser production optionality  Located in Tunisia o 210km SW of Tunis, with access by bitumen road o 35km from railhead o Access to ports o Gas and grid power nearby  Global JORC 2012 Resource: 146.4Mt @ 20

  7. Slide 7: Proximal to Key Export Markets

    Proximal to Key Export Markets For personal use only  Tunisia is the northernmost country in Africa and right on Europe’s doorstep  Major phosphate producer and exporter with existing infrastructure, extensive road, rail and energy networks  Diverse economy – agriculture, mining, manufacturing, p

  8. Slide 8: Corporate Overview

    Corporate Overview For personal use only 273M $38.2M Major Shareholders (%) Lion Selection Group SHARES ON ISSUE MARKET CAP 15% ASX: PHO At $0.14/sh 46% Board & Management Retzos Holdings 15% $3.9M Nil Polo Resources 13% Other CASH DEBT 11% 30 Sep 2022 As at 30 Sep 2022 5.75M 3.5M $0.20 3.0 Volume $

  9. Slide 9: Board & Management

    Board & Management A team with deep industry experience & success in Africa For personal use only Simon has vast experience in Robin has over 40 years of Craig has over 25 years of the resources sector in both mining industry and equity accounting experience in Australia and Africa. He was the marke

  10. Slide 10: Resource Upgrade Boosts Size & Confidence

    Resource Upgrade Boosts Size & Confidence For personal use only Global JORC Resource: 146.4Mt @ 20.6% P2O51 Defined from drilling at only 2 of 6 prospects, KEL and GK 9 holes drilled, averaging 15.3m @ 20.5% P2O53  Tonnage increased  Increased confidence  Targeting New Resources Large, high confi

  11. Slide 11: Excellent metallurgical results

    Excellent metallurgical results For personal use only  Chaketma phosphate ore can be upgraded to 30% P2O5 with recovery greater than or equal to 80%1  Potential to produce commercial grade concentrate capable of conversion to high quality products, Mono Ammonium Phosphate (MAP) and/or Diammonium P

  12. Slide 12: Conceptual Staged Development

    Conceptual Staged Development For personal use only Stage 1: Rock Phosphate Project  Open pit mine with low strip ratios  Simple wash/ screen or flotation  Favourable metallurgy  Multi-decade mine life with incremental expansion optionality Stage 2: Integrated Fertiliser Project  Commence BFS o

  13. Slide 13: Optimisation opportunities

    Optimisation opportunities A Scoping Study for the development of a For personal use only potential large-scale, world-class mining operation at Chaketma due imminently Various optimisation opportunities will also be studied:  Potential to direct ship material in higher grade layer B early in proje

  14. Slide 14: Green Shift

    Green Shift For personal use only  The world will invest $150 trillion in sustainability efforts by 2050  Wind, solar and treatment routes being considered by various research organisations and will be assessed prior to BFS  PhosCo is also assessing several proposals which aim to facilitate a gre

  15. Slide 15: Project Timeline & Deliverables

    Project Timeline & Deliverables For personal use only  CPSA previously submitted a range of feasibility work to the Tunisian Government in support of the Mining Concession application. The bulk of this work has been accepted by the Government, who’ve requested an updated finance plan for the Projec

  16. Slide 16: New Tenement Applications (100% PhosCo)

    New Tenement Applications (100% PhosCo) Leveraging strong in-country team For personal use only Sekarna Phosphate Project (128km2) Northern Tunisia Base and Precious Metals  A large scale, outcropping phosphate target Project (668km2):  Located 10km northeast of Chaketma  Multiple base and precio

  17. Slide 17: World Class Phosphate Project

    World Class Phosphate Project For personal use only Critical raw material to play important role in food security Potential multi-decade mine High-grade & shallow resource Significant exploration upside Close to key infrastructure & export markets Positive early engagement with the Tunisian Governme

  18. Slide 18: Contact

    For personal use only Contact Taz Aldaoud Follow PhosCo on LinkedIn E: taz.aldaoud@phosco.com.au Follow @PhoscoLtd on Twitter T: +61 (0) 473 230 558 www.phosco.com.au

  19. Slide 19: APPENDIX 1: Joint Venture Overview

    APPENDIX 1: Joint Venture Overview For personal use only History TMS owes US$5.0M TMS damages & costs  2015 – Illegal transfer 2015  2017 – International arbitration orders return of 50.99% 48.99% 50.99% interest and awards US$4M in damages & costs (with interest, now US$5m)  2019 2017– Tunisian

  20. Slide 20: APPENDIX 2: JORC Resource Table

    APPENDIX 2: JORC Resource Table For personal use only Chaketma Phosphate Project Global Mineral Resources CHAKETMA JORC 2012 Mt % P2O5 Measured 49.1 21.3 KEL (March 2022) Indicated 6.4 20.3 2015 Total 55.5 21.2 Indicated 83.7 20.2 GK (November 2022) Inferred 7.2 20.1 Total 90.9 20.2 Measured 49.1 21

PhosCo — The Australian Potash & Phosphate Conference 2022 on 6ix