Phosco Ltd · ASX:PHO
Phosco — Shareholder Meeting (November 2023)
17 slides from Phosco's shareholder meeting presentation, Nov 28, 2023
Slide 1: Chairman's Address and 2023 AGM Presentation
ASX Announcement 28 November 2023 CHAIRMAN’S ADDRESS AND 2023 AGM PRESENTATION PhosCo Ltd (ASX: PHO) (‘PhosCo’ or ‘the Company’) is pleased to release the Chairman’s Address and AGM presentation to be made at the Annual General Meeting (AGM) to be held at 3.00pm (AEDT) today, 28 November 2023. Chair
Slide 2: Annual General Meeting Investor Update – November 2023
For personal use only Annual General Meeting Investor Update – November 2023
Slide 3: Disclaimer - Important Information
Disclaimer - Important Information Cautionary Statement The Scoping Study referred to in this announcement is based on further technical work following a scoping study released in 2012. This study remains at the level of a Scoping Study based on preliminary For personal use only technical and econom
Slide 4: 2022 World Production – Rock Phosphate
2022 World Production – Rock Phosphate Mt (30% P2O5) For personal use only China 85 Morocco 40 Current World Bank Price USA 21 Russia 13 US$348/t Jordan 10 Saudi Arabia 9 Egypt 5 Brazil 5 Chaketma Scoping Study Price: Peru 4 US$150/t Tunisia 4 Israel 3 World Total 199 Source: Investing News Network
Slide 5: Multiple Phosphate Project Applications
Multiple Phosphate Project Applications Base & Precious For personal use only Metal Projects 1. Chaketma – (51% PHO) Northern 2. Sekarna – (100% PHO) Phosphate Basin 3. Amoud – (100% PHO) Northern Basin Tunisia World scale potential
Slide 6: Ideal Location
Ideal Location Access – For personal use only Road & rail links to ports Power – Gas & grid power People – Well educated, under- employed local population Tunisian phosphate know-how Will need ground water. Known aquifers in region.
Slide 7: Chaketma – Application
Chaketma – Application For personal use only Global JORC 2012 Resource1: 146.4Mt @ 20.6% P2O5 Scoping Study Dec 2022: 2 1.5Mtpa x 30% P2O5 48-year initial life + exploration potential, 4 additional targets
Slide 8: Chaketma Phosphate Project
Chaketma Phosphate Project Initial 46 Year Mine Life at 1.5Mt Product For personal use only Annual Cashflow Post Tax NPV10 Years 1-10 Payback – After Tax US$657M US$150/t Phosphate Concentrate 1.5 years with IRR of 54% US$93.4M Phosphate Concentrate Operating Cost Production (First 10 Years) Develop
Slide 9: Sekarna – Application
Sekarna – Application For personal use only Large outcropping target (128km2) Simple geology, analogy of Chaketma Mesa topography, exposed on sides Work program: Low cost – high impact Channel sample edges Then drill PhosCo | Sustainable Phosphate | 8
Slide 10: Amoud – Application
Amoud – Application For personal use only Adjacent to world-class Sra Ouertane Project, potential analogy Sra Ouertane contains 2-3 billion tonnes of rock phosphate at an average grade of 16% Project area well served by road, farm tracks, power Exploration target in preparation
Slide 11: For personal use only
2) UY vu) O — QO. (2UOSIJ9d |
Slide 12: Permitting Process
Permitting Process For personal use only Permit Application Lodged CCM Approval Grant Date Simitu April 2022 October 2022 October 2023 Sekarna July 2022 Chaketma March 2023 Amoud June 2023 PhosCo | Sustainable Phosphate | 11
Slide 13: Northern Phosphate Hub – what's needed
Northern Phosphate Hub – what’s needed For personal use only Sekarna Permit Awaits Mines Committee Meeting 2015 Chaketma - Currently 51% PHO 2017 - Seizure of other 49% for unpaid damages – underway - New permit – lodged Amoud Permit To follow Sekarna PhosCo | Sustainable Phosphate | 12
Slide 14: Simitu – Copper-Gold permit
Simitu – Copper-Gold permit Highly prospective 30km corridor, 100% PHO For personal use only Numerous targets and old workings Data rich and outcropping exposure Historic exploration defined 7.5km soil anomaly with gold & coincident copper & arsenic Rock chip results included 1.7g/t gold &
Slide 15: Simitu – field work underway
Simitu – field work underway For personal use only
Slide 16: Contact
For personal use only Contact Taz Aldaoud Follow PhosCo on LinkedIn E: taz.aldaoud@phosco.com.au Follow @PhoscoLtd on Twitter T: +61 (0) 473 230 558 www.phosco.com.au
Slide 17: Appendix 1: JORC Resource Table
APPENDIX 1: JORC Resource Table For personal use only Chaketma Phosphate Project Global Mineral Resources CHAKETMA JORC 2012 Mt % P2O5 Measured 49.1 21.3 KEL (March 2022) Indicated 6.4 20.3 Total 55.5 21.2 2015 Indicated 83.7 20.2 GK (November 2022) Inferred 7.2 20.1 Total 90.9 20.2 Measured 49.1 21