Odyssey Gold Limited · ASX:ODY

Odyssey Gold — Investor Presentation (December 2021)

20 slides from Odyssey Gold's investor presentation, Dec 8, 2021

  1. Slide 1: Amended Company Presentation ASX Announcement

    ASX ANNOUNCEMENT 8 December 2021 For personal use only AMENDED COMPANY PRESENTATION Odyssey Gold Limited (ASX:ODY) (“Odyssey” or “Company”) advises that it has amended its recent company presentation to include the source of the information used for the comparison graph on slide six titled ‘Untested

  2. Slide 2: Unearthing the Potential of the Tuckanarra Goldfields

    UNEARTHING THE POTENTIAL OF THE For personal use only TUCKANARRA GOLDFIELDS DECEMBER 2021 1

  3. Slide 3: Odyssey Controls the Historic Tuckanarra Goldfields

    Odyssey Controls the Historic Tuckanarra Goldfields  Part of the prolific Murchison Goldfields, host to a +35Moz gold endowment. For personal use only  Historical high-grade production centre.  Very little modern, systematic exploration.  Proximal to multiple gold processing plants, straddling t

  4. Slide 4: Very Fertile Gold Belt – Historical Exploration has only Scratched the Surface

    Very Fertile Gold Belt – Historical Exploration has only Scratched the Surface For personal use only 85km of BIF & metasedimentary sequences:  24% has known gold mineralisation; 8km of unexplored greenstones – never  76% is untested. drilled. 5 open pits mined in the 1990’s - targeting shallow, ox

  5. Slide 5: Exploration History

    Exploration History Ruins of Tuckanarra State Battery.  Initial discovery by Boyle and Moore, in 1887. For personal use only  Tuckanarra State Battery was built in 1898 and operated for over 10 years.  Mining focused on high-grade quartz veins, generally limited to the depth of the water table. 

  6. Slide 6: Exploration History

    Exploration History  Extensive historical database of 5,146 drill holes for 145,884m. For personal use only  Historical drilling averages 28m depth and is mostly near vertical - not an ideal orientation for testing subvertical lithologies.  Less than 5% of historical drilling is >100m deep. Kohin

  7. Slide 7: Untested Depth Potential

    Untested Depth Potential Tip of the Iceberg?  Tuckanarra has barely been drilled at depth. For personal use only  The Murchison Goldfields are well known for high-grade ore shoots extending to +1,000m depth. 0 1* 2* 3* 4* 5* 5* 6* 7* 2000 1800 -500 1600 1400 Number of drillholes - Tuckanarra Miner

  8. Slide 8: Odyssey Era

    Odyssey Era  Odyssey consolidated the field in early 2020/2021 – 80% up For personal use only to 100% ownership of the current 176km2 land position.  Immediately commenced drilling down dip and along strike at Cable-Bollard and Bottle Dump.  Excellent results to date.  Initial geological drillin

  9. Slide 9: Tuckanarra Metasedimentary sequences

    Tuckanarra Metasedimentary sequences  Tuckanarra contains at least 8 For personal use only sub-parallel linear magnetic highs, totaling ~70km, representing BIF and Anchor Target metasedimentary sequences. East Lynn Cable-Bollard  Historical workings and drilling have encountered gold 1.5km Central

  10. Slide 10: Cable-Bollard & Cable North

    Cable-Bollard & Cable North  Cable-Bollard trend includes multiple parallel mineralised Current identified structures comprising BIF’s and metasedimentary For personal use only mineralisation sequences, occasionally interrupted by cross cutting dykes. Open  Historical production (Metana Minerals)

  11. Slide 11: Bottle Dump, Donald & Gombao

    Bottle Dump, Donald & Gombao Bottle Dump Bottle Bottle Dump Dump pit pit  Open pit that was mined in the 1990’s, producing 13koz @ 3.7g/t. For personal use only  ESE trending BIF sequences that are subparallel to the interpreted ESE trending major shears.  Excellent drill results to date, with th

  12. Slide 12: Maybelle, Lucknow & Douglas

    Maybelle, Lucknow & Douglas Maybelle & Maybelle Trend For personal use only  Shallow open pit mined in the 1990’s, producing 6koz @ 3.6g/t.  Excavated part of a sheared metasedimentary sequence which can be traced over a line of 1.5km (Maybelle Trend), along a line of historical workings.  Majori

  13. Slide 13: Highway Greenstones & Dolerite Dyke

    Highway Greenstones & Dolerite Dyke Highway Greenstones For personal use only  8km of Singleton Formation greenstone between the Stakewell and Tuckanarra projects.  The Highway Greenstones are largely unexplored due to surface cover and no outcrop.  Similar stratigraphic sequences to those at the

  14. Slide 14: What is yet to be explored?

    What is yet to be explored? Central Zone & East Lynn For personal use only  7.3km of BIF and metasedimentary sequence. East  Intensely folded BIF and metasedimentary sequences – up to 50m thick. Lynn  Only historical workings on the structure are where the BIF’s outcrop with quartz veins. The res

  15. Slide 15: Stakewell & Kohinoor

    Stakewell & Kohinoor  The Kohinoor mine at Stakewell was mined in three stages: 1. 1905-1911: 8koz @ 13.9g/t; 2. 1987-1989: 3.5koz @ 2.4g/t & 1.9koz @ 1.0g/t; and For personal use only 3. 1994-1995: 15.7koz @ 11.9g/t.  Stakewell comprises subparallel sequences of NNE trending BIF’s, mafic volcanic

  16. Slide 16: Stakewell – Kohinoor

    Stakewell – Kohinoor  Numerous targets yet to be fully tested.  Potential for further depth extensions of Kohinoor shoot. For personal use only  Potential cutback of open pit.  Potential for additional stacked lodes, which have only been drilled near surface. 15

  17. Slide 17: Summary

    Summary  Odyssey controls the entire Tuckanarra Goldfields - an area with a substantial high-grade mining history. Infill & For personal use only Cable- Advanced Bollard  ~85km of BIFs, metasedimentary sequences and greenstones – only ~20% of which have been drilled or Cable Bollard North highway

  18. Slide 18: Board & Management with a proven track record

    Board & Management with a proven track record Board of Directors CAPITAL STRUCTURE For personal use only Ian Middlemas -Chairman ODY Shares on Issue 612.43M Highly regarded Chairman and resources executive. Mr Middlemas is currently the Chairman of a number of publicly listed companies. Price (close

  19. Slide 19: Competent Persons Statement

    For personal use only COMPETENT PERSONS STATEMENT The information in this presentation that relates to historical exploration results are extracted from the Company’s ASX Disclosures announcements dated 4 September 2020, 22 October 2020, 14 January 2021, 3 February 2021, 9 February 2021, 22 February

  20. Slide 20: Contact details

    ASX: ODY Level 9, 28 The Esplanade, Perth WA 6000 T: +61 8 9322 6322 E: info@odysseygold.com For personal use only www.odysseygold.com.au For further information, please contact: Matt Syme Steve Le Brun Executive Director Geology Manager Tel: +61 8 9322 6322 Tel: +61 8 9322 6322 19

Odyssey Gold — Investor Presentation (December 2021) on 6ix