Kingston Resources Ltd. · ASX:KSN

Kingston Resources — Noosa Mining Conference 2025

26 slides from Kingston Resources's conference presentation, Jul 25, 2025

  1. Slide 1: Kingston Resources Limited

    Kingston Resources Limited Noosa Mining Conference July 2025 MID-TIER GOLD AND COPPER PRODUCER COBAR BASIN, NSW 23- 25 July 2025 www.kingstonresources.com.au I ASX: KSN

  2. Slide 2: Important notices and disclaimer

    Important notices and disclaimer Forward Looking Statements Mineral Hill Gold Bar Certain statements contained in this presentation, including information as to the future financial or operating performance of KSN and its projects, are forward looking statements. Such forward looking statements: inc

  3. Slide 3: Important notices and disclaimer

    Important notices and disclaimer Exploration by Other Explorers This presentation contains information sourced from the reports of other Explorers. References to the original reports are provided as footnotes where the information is cited in this presentation. KSN does not vouch for the accuracy of

  4. Slide 4: Investment highlights

    Kingston Resources Investment highlights Gold and Silver Production: Resource of 760koz AuEq1, open pit and underground Ore Reserves; copper production CY26. Strong balance sheet: $50M cash received from Misima divestment ($95M total consideration); debt-free. Significant expansion potential: Infill

  5. Slide 5: Corporate snapshot

    Corporate snapshot 1-Year Share Price Performance Shares on issue 833m Warrants & options2,3 168.4m Share price (22/7/2025) $0.14 Market cap $116m Cash @ 31 March 20251 $12.48m Restricted cash for environmental bond $7.4m Debt4 $15m Shareholder Structure 1. Estimated Cash balance, as at 31 Mar 2025,

  6. Slide 6: Misima sale complete

    Misima sale complete Sale of the PNG gold project allows for an acceleration of Australian gold-copper growth Kingston sold it’s 100% share in the Misima Gold Project to Ok Tedi Mining Limited in the June quarter of 2025. Ok Tedi currently produces copper, gold, silver OK TEDI concentrate from the O

  7. Slide 7: Acceleration of Australian gold-copper growth

    Acceleration of Australian gold-copper growth Reduced costs, strong balance sheet and growing cash flow from operations Financial position and cash flow Balance Sheet Targeting Resource Growth Process Inputs Outputs strengthened: Tenure Drilling Production Growth Expertise Resources Free Cash Flow •

  8. Slide 8: Mineral Hill overview

    Mineral Hill overview 100%-owned producing asset – Cobar Basin, NSW • Open pit mining to 2026; six-year mine life with drilling to extend underground resources. • Underground refurbishment well advanced with mine development due to commence in Feb 2026 (SOZ). • Current cash flow from gold doré and c

  9. Slide 9: Production and revenue snapshot

    Production and revenue snapshot Transformative return on investment and growth Life of mine out to 2031 – 6 years Mineral Hill acquired Jan 2022 for Dec-26 Dec-24 Dec-25 Dec-27 Jun-26 Jun-25 Jun-27 $23M $151M revenue, $41M operating Open Pit Mining cash flow to date1 Open Pit Processing Ramp-up supp

  10. Slide 10: Open pit mining

    Open pit mining Current cash flow from gold doré and concentrate sales FY25 gold production 12,061 oz @ AISC 3,100/oz. FY26 payable gold to increase by 55% Pearse North Open Pit as of July 2025 Pearse South Open Pit as of July 2025 www.kingstonresources.com.au I ASX: KSN Corporate Presentation | Jul

  11. Slide 11: Gold concentrate restart milestone

    Gold concentrate restart milestone Successful low-cost refurbishment and commissioning • Gold concentrate production restarted in May 2025. • First concentrate production in nearly a decade. CEO & MD, Andrew Corbett I front of flotation stockpiles • Recommissioned flotation circuit enables gold, cop

  12. Slide 12: Leveraging existing underground mines

    Leveraging existing underground mines Setting up the long-term future of Mineral Hill • Underground mine life of +5 years. Oblique view of the Southern Ore Zone planned stopes • Underground development set to commence early 2026. • Underground drilling program underway targeting extension of mine li

  13. Slide 13: Underground drilling (SOZ)

    Underground drilling (SOZ) Exceptional high-grade gold and copper Plan view of the Southern Ore Zone Infill and extension drilling ongoing, exceptional intercepts including: • 8.8m @ 42.5g/t Au, 1.77% Cu (KSNDDH032). • 4.0m @ 12.89g/t Au, 5.05g/t Ag and 0.73% Cu from 86m (KSNDDH034). • Incl. 1.0m @

  14. Slide 14: Growth potential at Mineral Hill

    Growth potential at Mineral Hill Strategy on expanding Mineral Resources and making new discoveries Brownfields Expansion Targets Currently 7.2Mt of underground resources. High grade gold GD140 Parkers Hill Plan: EOZ • Expand underground drilling. • Update Resource estimates. • Add other brownfields

  15. Slide 15: Further potential at depth and regionally to be tested

    Further potential at depth and regionally to be tested Mineral Hill remains open at depth and along the regional trends • Depth of drilling <500m depth. • Major mineral deposits in Cobar extend to ~1.8km. • Numerous regional (long section looking SW) exploration targets that will be considered in fu

  16. Slide 16: Drilling priorities

    Drilling priorities Near mine open pit and underground targets identified 4 on EL8334 EL1999 5 Key drilling priorities: • Additional underground ore source. • Surface exploration to target additional open pit and underground discoveries. • Commence Greenfields exploration targeting a significant dis

  17. Slide 17: Further resource growth opportunities regionally

    Further resource growth opportunities regionally Highly prospective Greenfields drill targets and geochemical signatures provide significant upside Focus on value-driven exploration: EL 8334: High-potential targets Strong soil and geophysical results www.kingstonresources.com.au I ASX: KSN Corporate

  18. Slide 18: Strongly positioned to consider complementary opportunities

    Strongly positioned to consider complementary opportunities Mineral Hill is the only operating processing facility in the southern Cobar Basin Grow resources and expand daily throughput Target 2,000 tpd Today Target a 1,000 tpd doubling of production 360,000 tpa 700,000 tpa c.70kozpa AuEq Resource g

  19. Slide 19: Summary: Focus on ramping up Mineral Hill

    Summary: Focus on ramping up Mineral Hill Leveraging the existing gold-copper asset base while advancing future growth opportunities Experienced Management Team: Focused on maximising returns from Mineral Hill with strong balance sheet flexibility. Strategically Located: Mineral Hill positioned cent

  20. Slide 20: Appendix

    Appendix www.kingstonresources.com.au I ASX: KSN Corporate Presentation | July 2025 20

  21. Slide 21: Highly experienced and well-regarded Executive Team

    Highly experienced and well-regarded Executive Team Significant experience across the development life cycle through to production Mick Wilkes Andrew Corbett Tony Wehby Stuart Rechner Non-Executive Chairman Managing Director Non-Executive Director Non-Executive Director Mick is a seasoned mining And

  22. Slide 22: Building a safe and sustainable culture

    Building a safe and sustainable culture Investing in our people and our community A large employer in Condobolin. ESG framework: safe, responsible and sustainable. Investing in our local and residential workforce. www.kingstonresources.com.au I ASX: KSN Corporate Presentation | July 2025 22

  23. Slide 23: Mineral Hill – Social License

    Mineral Hill – Social License Environmental and Social Licence to operate Permits in place for mining and processing Cash backed environmental bonds Tailings capacity in place and expansion plans scheduled Biodiversity offset established www.kingstonresources.com.au I ASX: KSN Corporate Presentation

  24. Slide 24: Competent Person Statement

    Competent Person Statement • Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Mineral Hill • The information in this report that relates to the reporting of the Mineral Hill Mine Mineral Resource Estimate is based on and fairly represents, information and

  25. Slide 25: Metal equivalents

    Metal equivalents This presentation quotes metal equivalent grades for the life of mine plan, Mineral Resources and Ore Reserves. Price assumptions used are based primarily on consensus forecasts with adjustments based on company expectations. Gold equivalent (AuEq) and copper equivalent (CuEq) conv

  26. Slide 26: Mineral Hill – Resources & Reserves

    Mineral Hill – Resources & Reserves Attractive commodity base with significant growth potential Total Probable Ore Reserves Measured Resource Inventory Au Ag Cu Pb Zn Au Ag Cu Pb Zn Au Ag Cu Pb Zn Au Ag Cu Pb Zn Deposit Kt (g/t) (g/t) % % % (Koz) (Koz) (Kt) (Kt) (Kt) Deposit Kt (g/t) (g/t) % % % (Ko

Kingston Resources — Noosa Mining Conference 2025 on 6ix