  1. Slide 1: Unlocking the Potential of Mineral Hill through the Drill Bit

    Kingston Resources Limited Unlocking the Potential of Mineral Hill through the Drill Bit Investor Presentation − June 2026

  2. Slide 2: Important notices and disclaimer

    Important notices and disclaimer Forward Looking Statements Certain statements contained in this presentation, including information as to the future financial or operating performance of Kingston and its projects, are forward looking statements. Such forward looking statements: include, among other

  3. Slide 3: Investment highlights

    Investment highlights Unlocking the potential of Mineral Hill through aggressive exploration Strategically positioned with a fully permitted, 350ktpa polymetallic plant in the South Cobar Basin Existing CIL and flotation processing facility with the ability to treat polymetallic ores Plant expansion

  4. Slide 4: Corporate snapshot

    Corporate snapshot 1-Year Share Price Performance Shares on issue ~842m Market Volume('000) RHS Close Price (A$) (LHS) 0.18 70,000 Warrants1 130.4m 0.16 60,000 Share price - 11 June 2026 $0.040 0.14 50,000 Market cap $34m 0.12 0.1 40,000 Cash balance2 - 11 June 2026 $9.4m 0.08 30,000 Restricted cash

  5. Slide 5: Highly experienced Executive Team

    Highly experienced Executive Team Significant experience across the development life cycle through to production Mick Wilkes Andrew Corbett Tony Wehby Stuart Rechner Non-Executive Chairman Managing Director Non-Executive Director Non-Executive Director Mick is a seasoned mining Andrew is a highly ex

  6. Slide 6: Mineral Hill Overview

    Mineral Hill Overview Brownfields mine strategically positioned with a 350ktpa plant in the South Cobar, NSW Fully permitted and strategically located 350ktpa (flotation & CIL) processing facility located in the South Cobar Basin Existing brownfields mines with established underground infrastructure

  7. Slide 7: Mineral Hill – Significant Existing and Permitted Infrastructure

    Mineral Hill – Significant Existing and Permitted Infrastructure Fully permitted, 350ktpa processing facility with supporting infrastructure ✓ Existing 350ktpa processing facility, with CIL and flotation capabilities to enable processing of polymetallic ores from Mineral Hill and the region to produ

  8. Slide 8: 25,000m Drilling Program to Unlock the Potential of Mineral Hill

    25,000m Drilling Program to Unlock the Potential of Mineral Hill Forward work program focused on high-impact drilling to deliver an initial 5-year LOM • 25,000m of infill, extensional and exploration drilling • First large-scale drill program since the 1980s • Diamond drilling underground at SOZ and

  9. Slide 9: Southern Ore Zone (SOZ) – A Growing Future Ore Source

    Southern Ore Zone (SOZ) – A Growing Future Ore Source Proving up the key ore source to underpin an initial 5-year LOM • SOZ drilling focused on building out the mineral inventory to support delivery of an initial 5-year LOM • Most recent drilling completed in Dec 2025 • Recent high-grade intercepts

  10. Slide 10: Developing Additional Underground Ore Sources

    Developing Additional Underground Ore Sources Jack’s Hut – High grade copper and gold • Jack’s Hut – a potential second underground production area • Current Resource of 1.6Mt with a separate decline and infrastructure to SOZ • Historically mined in the 1990’s for copper and gold - 705kt of ore mine

  11. Slide 11: Strong balance sheet to execute drilling strategy with additional value to be received

    Strong balance sheet to execute drilling strategy with additional value to be received $45.0m in deferred consideration to be received from Misima sale Kingston sold it’s 100% share in the Misima Gold Project to Ok Tedi Mining Limited in the June quarter of 2025. OK TEDI Ok Tedi currently produces c

  12. Slide 12: Building a Bigger and Better Mineral Hill

    Building a Bigger and Better Mineral Hill Drilling to accelerate resource growth and launch Mineral Hill with a stronger, more robust mine plan Drill High Impact Near Mine Extensions • 25,000m underground and surface drill program • Multiple targets to extend known mineralization and make new discov

  13. Slide 13: Appendix

    Appendix KINGSTONRESOURCES.COM.AU | ASX:KSN 13

  14. Slide 14: Competent Person Statement

    Competent Person Statement Competent Person’s Statement − Mineral Resource Reported in Accordance with 2012 JORC The Competent Person signing off on the overall Pearse Opencut Ore Reserves Estimate is Mr Code − Mineral Hill John Wyche BE (Min Hon) BComm CP, of Australian Mine Design and Development

  15. Slide 15: Mineral Hill – Resources & Reserves

    Mineral Hill – Resources & Reserves Measured Resource Inventory Au Cu Pb Zn Ag Au Cu Pb Zn Ag Deposit Kt (g/t) % % % (g/t) (Koz) (Kt) (Kt) (Kt) (Koz) Diversified commodity base with significant growth Southern Ore Zone 327 1.90 1.2% 0.5% 0.3% 10 20 4 2 1 109.3 potential TOTAL 327 1.90 1.2% 0.5% 0.3%

  16. Slide 16: Metal Equivalents

    Metal Equivalents This presentation quotes metal equivalent grades defined by Kingston Metallurgical recoveries are based on historical production (2010-2016) as Resources. Price assumptions used are based on market consensus well as recent metallurgical test work and are applied to the Resource for

  17. Slide 17: Metal Resources & Reserves

    Metal Resources & Reserves Attractive commodity base with significant growth potential Total Mineral Resources Metal Recoveries Gold Equiv. Copper Equiv. Cu Pb Zn Au Cu Zn Ag AuEq AuEq CuEq CuEq Deposit Kt Au (g/t) % % % Ag (g/t) (Koz) (Kt) Pb (Kt) (Kt) (Koz) Au Cu Pb Zn Ag g/t koz % kt Pearse South

  18. Slide 18: KINGSTONRESOURCES.COM.AU | ASX:KSN