Kingston Resources Ltd. · ASX:KSN
Kingston Resources — RIU Resources Round-Up Sydney Conference 2026
24 slides from Kingston Resources's conference presentation, May 6, 2026
Slide 1: Multi Commodity, High-Growth Gold-Silver-Copper Producer
Kingston Resources Limited For personal use only Multi Commodity, High-Growth Gold - Silver - Copper Producer RIU Resources Round-Up − Sydney Conference May 2026
Slide 2: Important notices and disclaimer
Important notices and disclaimer Forward Looking Statements For personal use only Certain statements contained in this presentation, including information as to the future financial or operating performance of KSN and its projects, are forward looking statements. Such forward looking statements: inc
Slide 3: Important notices and disclaimer: Exploration by Other Explorers
Important notices and disclaimer Exploration by Other Explorers For personal use only This presentation contains information sourced from the reports of other Explorers. References to the original reports are provided as footnotes where the information is cited in this presentation. KSN does not vou
Slide 4: Investment highlights
KSNDDH017 Investment highlights 12.5m @ 3.41% CuEq 2 Established producer with clear growth path For personal use only Multi commodity producer (gold, silver & copper) Enhanced diversification, margin resilience and exposure to strong copper fundamentals Drilling to grow the resources and reserves O
Slide 5: Corporate snapshot
Corporate snapshot 1-Year Share Price Performance Market Volume('000) RHS Close Price (A$) (LHS) Shares on issue 841m 0.18 70,000 0.16 Warrants1 130.4m 60,000 For personal use only 0.14 50,000 Share price (1/05/2026) $0.090 0.12 0.1 40,000 Market cap $76m 0.08 30,000 Cash balance2 @ 31 March 2026 $2
Slide 6: Mineral Hill: Cobar Basin, NSW
Mineral Hill: Cobar Basin, NSW Producing gold, silver and copper For personal use only Existing open pit gold & silver production with underground copper production ahead of schedule Fully permitted, operating processing (flotation & CIL) → multi-metal capability Located in a proven NSW mining distr
Slide 7: Cobar Basin: Strategic processing hub & M&A optionality
Cobar Basin: Strategic processing hub & M&A optionality Strategic Growth via Regional M&A For personal use only Regional Consolidation Recent $214m Cobar transaction highlights scarcity value of copper assets Infrastructure Advantage One of only two polymetallic plants in the region Fully permitted,
Slide 8: Mineral Hill: Scaling production & cash flow
Mineral Hill: Scaling production & cash flow Clear pathway to growth, diversification and long-term value creation For personal use only Proven Value Creation • $23m acquisition → $203m revenue / $58m operating cashflow since acquisition • Growing gold & silver production • Underground ramp up under
Slide 9: Diversified Production & Scalable Growth Platform
Diversified Production & Scalable Growth Platform Open Pit: Strong Cash Foundation (Gold & Silver) Underground: Copper Growth Engine For personal use only Open pit continues through Aug/Sep First copper production in >10 years → key milestone Material grade uplift: ~2.35g/t Au, ~87.6g/t Ag Undergrou
Slide 10: Accelerated copper production
Accelerated copper production • First copper concentrate produced For personal use only early → revenue accelerated by one quarter • 6,000t underground ore trial successfully processed • High-quality concentrate: 18-20% Cu • Strong Recoveries: 88% Cu, 74% Au • Flotation circuit successfully transiti
Slide 11: Mineral Hill Process Plant
Mineral Hill Process Plant – leveraging our infrastructure to create value Phase 1 of Process plant optimisation underway For personal use only Phase 1 • Plant upgrades well advanced • Targeting an increase in gold and silver recoveries • Provide operational flexibility and efficiencies • Increase c
Slide 12: Underground is the future at Mineral Hill
Underground is the future at Mineral Hill Priority # 1 Southern Ore Zone (SOZ) Ramp up For personal use only Our first underground mine • Accessed via the Eastern decline • Primary ventilation raise bore (240m) completed with new primary fan being installed next quarter • Power, pumping and secondar
Slide 13: Developing Additional Underground Ore Sources at Mineral Hill
Developing Additional Underground Ore Sources at Mineral Hill Priority #2 – Jacks Hut Underground For personal use only • Jack’s Hut - potential second underground production area • Approved with a separate decline and infrastructure to SOZ • Historically mined in the 1990’s for copper and gold. • M
Slide 14: Exceptional high-grade gold and copper
Exceptional high-grade gold and copper Underground drilling results - Southern Ore Zone (SOZ) For personal use only Recent infill and extensional drilling targets: • High-grade gold and copper G + H Lodes • Large tonnage, polymetallic A, B and C Lodes • Northern extensions of A and B Lode Significan
Slide 15: Pending 2026 Mineral Resource update
Pending 2026 Mineral Resource update Material resource growth with rising confidence For personal use only • Mineral Resource as of Nov 2025: • 10Mt of total Resources1 (up 29% on the 2024 release) • 60% in Measured & Indicated • SOZ Mineral Resource 2026 Update underway: • To include 25 new holes f
Slide 16: Regional exploration - advancement of key targets
Regional exploration - advancement of key targets Aiming for discoveries on highly prospective greenfield targets For personal use only Phase 1 RC drilling completed at Bogong, Long Panel, Walkers Hill. Downhole EM completed at Bogong. Mineralised system confirmed at Bogong. Additional analysis bein
Slide 17: Organic growth strategy: Focus on expanding Mineral Hill
Organic growth strategy: Focus on expanding Mineral Hill Leveraging the existing gold-copper asset base while advancing future growth opportunities For personal use only Growing production base, transitioning to underground mining and targeting a 10-year mine life Drilling on under-explored, highly
Slide 18: Appendix
For personal use only Appendix KINGSTONRESOURCES.COM.AU | ASX:KSN 18
Slide 19: Copper Tailwinds for Kingston on macro outlook
Copper Tailwinds for Kingston on macro outlook Structural tailwinds. Diversify production. Compelling value For personal use only Favourable Macro Backdrop Short-term Dislocation = Supply Constraints • Copper demand driven by AI, data centres, Opportunity Remain electrification & defence (~30% of de
Slide 20: Competent Person Statement
Competent Person Statement Competent Person’s Statement − Mineral Resource Reported in Accordance with 2012 JORC The Competent Person signing off on the overall Pearse Opencut Ore Reserves Estimate is Mr Code − Mineral Hill John Wyche BE (Min Hon) BComm CP, of Australian Mine Design and Development
Slide 21: Mineral Hill – resources & reserves
Mineral Hill – resources & reserves Measured Resource Inventory Au Cu Pb Zn Ag Au Cu Pb Zn Ag Deposit Kt (g/t) % % % (g/t) (Koz) (Kt) (Kt) (Kt) (Koz) Diversified commodity base with significant growth Southern Ore Zone 327 1.90 1.2% 0.5% 0.3% 10 20 4 2 1 109.3 potential TOTAL 327 1.90 1.2% 0.5% 0.3%
Slide 22: Metal equivalents
Metal equivalents This presentation quotes metal equivalent grades defined by Kingston Metallurgical recoveries are based on historical production (2010-2016) as Resources. Price assumptions used are based on market consensus well as recent metallurgical test work and are applied to the Resource For
Slide 23: Metal resources & reserves
Metal resources & reserves Attractive commodity base with significant growth potential For personal use only Total Mineral Resources Metal Recoveries Gold Equiv. Copper Equiv. Cu Pb Zn Au Cu Zn Ag AuEq AuEq CuEq Deposit Kt Au (g/t) % % % Ag (g/t) (Koz) (Kt) Pb (Kt) (Kt) (Koz) Au Cu Pb Zn Ag g/t koz
Slide 24: For personal use only
For personal use only KINGSTONRESOURCES.COM.AU | ASX:KSN
Kingston Resources — RIU Resources Round-Up Sydney Conference 2026 on 6ix