Slide 1: ESGold Corp.
ESGOLD CORP. Q1 20 25 CSE: ESAU | OTCQB: E S AUF | FS E : Z7D w w w . e s g o l d . c o m
Slide 2: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS T his pres entation c ontains c ertain s tatements that may be deemed “forward- looking s tatements ”. All s tatements , other than s tatements of his toric al fac t, that addres s events or developments that E S Gold C orp. expec ts to oc c ur, are forward- looking s tate
Slide 3: ESGold Overview
ESGOLD OVERVIEW
Slide 4: 2025 Outlook Value Drivers
2025 OUTLOOK VALUE DRIVERS MONTAUBAN – ROAD TO PRODUCTION Projec ted is fully permitted to operate 10 0 0 m/t per day M errill- C rowe c los ed c irc uit proc es s s ys tem for proc es s ing tailings at M ontauban Infras truc ture in plac e inc ludes s teel s truc ture building (16 ,0 0 0 ft2), Queb
Slide 5: Business Overview
BUSINESS OVERVIEW E S Gold is a C anadian gold exploration c ompany bas ed in Vanc ouver, B C , foc us ed on finding undervalued C anadian as s ets that are near- term revenue- produc ing and qualified as E S G Formed in 20 0 4 and traded T he c ompany is developing the T he M ontauban M ine Propert
Slide 6: Management Team
MANAGEMENT TEAM Paul Mastantuono Brad Kitchen André Gauthier CEO & Director President & Director Director » S tarted a trans portation c ompany in early 20 0 0 » 3 5- year rec ord c ons is ting of inves tment banking and » Over 4 7 years of experienc e in the M ining E xploration and later foc us ed
Slide 7: Management Team
MANAGEMENT TEAM Tony J. Giuliano Edmond St - Jean Claude Duplessis Chief Financial Officer Mining Engineer, Consultant Senior Engineer, Consultant » E xperienc ed financ ial exec utive having worked as » Over 3 0 years of experienc e as a mining engineer, » S enior E ngineer with over 26 years of ex
Slide 8: Share Structure
SHARE STRUCTURE Share Distribution Number of Description shares As of January 2025 5% 10% Total outs tanding s hares 52,3 14,3 0 0 Institutional Management Public Float Issued and Outstanding: 52,314,300 25% 60% Friends and Affiliates Options outs tanding 2,0 3 0 ,0 0 0 ($ 0 .71 avg pric e) Fully Di
Slide 9: Private Placement March 2025
Private Placement Offering Up to 14,000,000 Common Shares Price: USD$0.15 per Unit Gross Proceeds: Up to USD$2,100,000 PRIVATE PLACEMENT Unit Offering: Each Unit being comprised of one common share of the Company at a price of USD$0.15 and one common share purchase warrant at March 2025 the price of
Slide 10: Montauban Project
MONTAUBAN PROJECT
Slide 11: The Montauban Project Site
THE MONTAUBAN PROJECT SITE T he property is loc ated approximately 8 0 km wes t of Quebec C ity and 6 0 km north of Trois - R iv ières , in the M ontauban Towns hip in the Portneuf C ounty, Quebec w w w . e s g o l d . c o m 11
Slide 12: The Montauban Site Opportunity
THE MONTAUBAN SITE OPPORTUNITY E S Gold has the opportunity to c reate s ignific ant as s et value for its s hareholders by proc es s ing the exis ting gold, s ilver and mic a found in the toxic mine tailings while s atis fying the c orporate E S G objec tives of removing the toxins and res toring t
Slide 13: Montauban Highlights
MONTAUBAN HIGHLIGHTS Highlights based on Tailings from Preliminary Economic Assessment (NI 43 - 101) Resource Prices in Current Market 2023 PEA Resource Prices PROJECT HIGHLIGHTS G old P ric e (US D/OZ) $ 1,750 $ 29 0 0 S ilver P ric e (U S D/OZ) $ 21 $32 » Fully permitted proc es s ing operations f
Slide 14: Tailings Mineral Resources at Montauban – PEA 2023
TAILINGS MINERAL RESOURCES AT MONTAUBAN – PEA 2023 T he mineral res ourc es es timate for the M ontauban and Notre- Dame- de- M ontauban Tailings Au (g/t) Ag (g/t) T onnes Au Oz Ag Oz MONTAUBAN TAILINGS Indic ated 0 .4 31 6 0 3 ,70 0 7,8 0 0 6 10 ,3 5 0 Inferred 0 .3 4 28 29 2,0 0 0 3 ,15 0 258,9 0
Slide 15: Drilling at Montauban
DRILLING AT MONTAUBAN T he drill hole databas e c ontained 3 52 valid drill hole c ollars , with a total meterage of 1,6 54.0 4 m and 1,170 as s ay intervals totaling 1,4 9 8.0 5m. For the Notre- Dame- de- M ontauban tailings a total of 3 5 tes t pits and trenc hes totaling 77.4 4 m were exc avated.
Slide 16: Near Surface Hard Rock Results - Map
NEAR SURFACE HARD ROCK RESULTS - MAP Surface results - section 1310 N Grab Samples 1 11.9 0 g/t Au 3 1.4 g/t Ag 2 3 3.20 g/t Au 74.0 0 g/t Ag 3 1.20 g/t Au 25.0 0 g/t Ag † S ourc e : J ac ques M arc hand R es ourc e E valuation R eport ‡ S ourc e : Iz z a M ineraux – M irabel R es ourc es w w w . e
Slide 17: Surface Pilar Resource Evaluation – Historical Report
SURFACE PILAR RESOURCE EVALUATION – HISTORICAL REPORT M ontauban depos it and area have not been explored with modern exploration tec hnique Pas t produc er has never foc us ed on gold and s ilver V M S are c lus tered and s ugges ts there is a s trong potential to find other ones Zone MT Au (g/t) A
Slide 18: Montauban Mine Past Production
MONTAUBAN MINE PAST PRODUCTION 1913- 1944* 1948 - 1955* 1983 - 1990 † tons zinc 77,0 0 0 3 9 ,6 0 0 - tons lead 24,0 0 0 15,6 0 0 - oz. gold 4 0 ,0 0 0 16,8 76 9 2,553 oz. silver 4,0 0 0 ,0 0 0 2,6 4 7,517 3 23,3 76 * S ourc e : J ean Depatie for B oiville R es s ourc es Ltd † S ourc e : G enivar In
Slide 19: ESGold's Montauban Business Model
ESGold’s MONTAUBAN BUSINESS MODEL E S Gold C orp. has a v iable s olution, whic h enc ompas s es the res toration of c ontaminated tailings s ites and the extrac tion of prec ious metals inc luding gold and s ilver as well as indus trial minerals s uc h as mic a. ACQUISITION MILL FACILITY OPERATION
Slide 20: ESGold Local Support
ESGold LOCAL SUPPORT S T R ONG S UP P OR T F R OM S T R ONG S UP P OR T F R OM HIGH INT E R E S T F OR T HE M UNIC IPALIT Y, T HE LOC AL P OP UL AT ION NE W GOOD P E R M ANE NT M AYOR , ADM INIS T R AT ION QUALIT Y J OB C R E AT ION w w w . e s g o l d . c o m 20
Slide 21: Work Completed to Date by ESGold
WORK COMPLETED TO DATE BY ESGOLD Over $ 15M has been inves ted in developing the M ontauban P rojec t E S Gold has obtained all the required permits to res tore this c ontaminated s ite & has s igned the required protoc ols with the munic ipality of Notre- Dame- de- M ontauban T he c ompany has c om
Slide 22: Montauban Plant Engineering Design
MONTAUBAN PLANT ENGINEERING DESIGN w w w . e s g o l d . c o m 22
Slide 23: Montauban Plant Site Plan
MONTAUBAN PLANT SITE PLAN w w w . e s g o l d . c o m 23
Slide 24: Montauban Plant Site Plan
MONTAUBAN PLANT SITE PLAN Process mining residues, recover the precious metals (gold, s ilver and indus trial metal mus c ov ite (mic a) and res tore the s ite (dec ontaminate) through treatment and neutraliz ation S ec ure private and public s ec tor Upgrade the proc es s ing mill to financ ing to
Slide 25: Corporate Directory
CORPORATE DIRECTORY Paul Mastantuono Brad Kitchen CEO President 1 514 712- 1532 +1 604 506 - 7555 paul@esgold.com brad @esgold.com ESGold Corp. CSE: ESAU | OTCQB: info@esgold.com ESAUF | FSE: Z7D 1500 – 1050 W Georgia St. www.esgold.com Vancouver, BC, V6E 4N7