Pan African Resources Plc · LSE:PAF

Pan African Resources — H1 FY2020 Earnings Presentation

40 slides from Pan African Resources's earnings presentation, February 2020

  1. Slide 1: Interim Results

    INTERIM RESULTS RESULTS PRESENTATION FOR THE SIX MONTHS ENDED 31 DECEMBER 2019

  2. Slide 2: Disclaimer

    DISCLAIMER The name 'Presenter' refers to Pan African Resources PLC and its advisors, subsidiaries or affiliated companies. This presentation has not been filed, lodged, registered or approved in any jurisdiction and recipients of this document should keep themselves informed of and comply with and

  3. Slide 3: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Statements in this report that address exploration activities, mining potential and future plans and objectives of Pan African Resources are forward-looking statements and forward-looking information that involve various risks, assumptions and uncertainties and are not sta

  4. Slide 4: Overview of Presentation

    OVERVIEW OF PRESENTATION • Overview of our operations • H1 FY20 – Highlights > Operational and financial performance > Group safety > Environmental, Social and Governance (ESG) • Key focus areas • H1 FY20 cash flow generation and debt redemption • Investing in our future • Near-term organic growth p

  5. Slide 5: CEO quote on strategy

    “Our strategy for Pan African is simple but powerful: Position ourselves as a sustainable, safe, high-margin and long-life gold producer. We are proud to say the first six months of the year has us taking significant steps towards realising this strategy” COBUS LOOTS Chief executive officer 5

  6. Slide 6: Overview of our operations

    PAN AFRICAN@ RESOURCES eo) Overview of our operations

  7. Slide 7: Overview of our operations

    OVERVIEW OF OUR OPERATIONS Pan African’s business represents a unique combination of underground mining and surface remining 7

  8. Slide 8: Overview of our operations: Group Summary

    OVERVIEW OF OUR OPERATIONS Group Summary BARBERTON MINES BTRP ELIKHULU EVANDER 8 SHAFT PILLAR • The birthplace of BIOX® • Designed to treat 100,000 • The Big One’ in Zulu • Maximising the value of our and our cornerstone tonnes per month • Elikhulu was built within own asset portfolio - the 8 operat

  9. Slide 9: H1 FY20 – Highlights

    PAN AFRICAN RESOURCES Se) H1 FY20 - Highlights

  10. Slide 10: H1 FY20 – Highlights: Operational and financial performance

    H1 FY20 – HIGHLIGHTS Operational and financial performance Production • Gold produced by the Group increased by 14.7% to 92,941oz (2018: 81,014oz) • Elikhulu production increased by 91.6% to 29,301oz (2018: 15,292oz) • Evander 8 Shaft Pillar project on track to achieve steady-state production during

  11. Slide 11: Adjusted EBITDA generation

    OUR OPERATIONS Adjusted EBITDA generation 700 50 649.4 600 40 500 400 30 USD’ million 333.1 342.4 ZAR’ million 300 20 205.1 200 137.2 145.1 87.6 97.9 100 82.7 10 64.9 11.1 0 Evander surface Evander U/G BTRP Barberton U/G Elikhulu Corporate and other Group Total sources* 0 -47.4 -62.8 -62.7 -100 -200

  12. Slide 12: Group safety

    H1 FY20 – HIGHLIGHTS Group safety “Notwithstanding the fact that injury rates are well below industry average, we continuously strive to improve our safety performance and achieve our aim of zero harm to our employees” – Cobus Loots, CEO 6 -------------- Rates per million man hours -------------- 5.

  13. Slide 13: Environmental, Social and Governance compliance (ESG)

    H1 FY20 – HIGHLIGHTS Environmental, Social and Governance compliance (ESG) Pan African Resources is committed to doing business, as prescribed by the group’s values and code of ethics. We recognise that we are an integral part of the societies in which we operate, and are therefore obligated morally

  14. Slide 14: H1 FY20 – Highlights: community investment

    H1 FY20 – HIGHLIGHTS Highlights in the current reporting period include: STARTED CONSTRUCTION OF DONATED 4 MOBILE CATHYVILLE CLINIC AT LIBRARIES TO SCHOOLS EMJINDINI EXTENSION SURROUNDING 13 WITHIN THE EVANDER MINES BARBERTON MINES COMMUNITY INVESTED USD0.8 MILLION IN SKILLS AND INVESTED USD0.04 DEV

  15. Slide 15: H1 FY20 – Highlights: rehabilitation

    H1 FY20 – HIGHLIGHTS Highlights in the current reporting period include: TOTAL SPENT USD0.9 MILLION REHABILITATION ON REHABILITATION TRUST FUND OF OLD SHAFTS AND USD25.6 MILLION, INFRASTRUCTURE CLOSURE LIABILITIES FULLY FUNDED 15

  16. Slide 16: Key focus areas

    PAN AFRICA RESOU Se) Key focus areas

  17. Slide 17: Key focus areas

    KEY FOCUS AREAS • Delivering into group production guidance • Reducing all-in sustaining cost across all operations > Evander 8 Shaft Pillar project > Consort Mine > Sheba Mine • Continue to operate successfully in South Africa • Reduce debt levels and increase dividends 17

  18. Slide 18: Group production – solid performance and on track to meet guidance

    KEY FOCUS AREAS Group production – solid performance and on track to meet guidance • Gold sold increased by 13.6% to 90,602oz (2018: 79,765oz) • Group AISC of ZAR526,150/kg (2018: ZAR444,946/kg), or USD1,113/oz (2018: USD975/oz) • Low risk, high-margin tailings business has increased to 49.3% of gro

  19. Slide 19: Reducing group all-in sustaining cost

    KEY FOCUS AREAS Reducing group all-in sustaining cost Total operations Group excl. Consort Total underground Total Tailings/ surface Group Total and Evander U/G All-in sustaining cost per (ZAR/kg) 684,342 363,352 526,150 460,924 All-in sustaining cost ( USD/oz) 1,448 769 1,113 975 Low cost operation

  20. Slide 20: Evander Shaft Pillar project

    KEY FOCUS AREAS – REDUCING COSTS AT OUR OPERATIONS Evander 8 Shaft Pillar project • Pillar access development completed, secondary development and ledging operations ongoing • Build up to 9 stoping crews by Q4 FY 20 • Pillar to be mined at a rate of 11.5ktpm during steady state • Estimated ongoing A

  21. Slide 21: Consort operations – LOM of 6 years

    AREAS OF FOCUS – REDUCING COSTS AT OUR OPERATIONS Consort operations – LOM of 6 years Extraction of Prince Consort (‘PC’) Shaft pillar • PC Shaft pillar - Mineral Resource of 48,820t @ 25.54g/t for 40Koz • Development to PC Shaft pillar on track for completion during April 2020 • Forecast production

  22. Slide 22: Sheba operations – LOM of 9 years

    AREAS OF FOCUS – REDUCING COSTS AT OUR OPERATIONS Sheba operations – LOM of 9 years (19 years including Royal Sheba) Project Dibanisa • Forecasted to be completed during FY21 • Optimised usage of infrastructure expected to reduce all-in sustaining cost - targeting ~USD1,000/oz • Additional available

  23. Slide 23: Pan African Resources vs SA producers and global producers

    AREAS OF FOCUS – REDUCING COSTS AT OUR OPERATIONS Pan African Resources vs SA producers and global producers 1,500 1,400 1,300 1,200 H1 FY20 actual 1,100 2019 Forcasting sub USD1,000/oz Global 1,000 average ~ USD1,000/oz** 900 800 700 600 500 PAR full year Anglogold Sibanye Goldfields DRD Gold PAR H

  24. Slide 24: Continue to operate successfully in South Africa

    CONTINUE TO OPERATE SUCCESSFULLY IN SOUTH AFRICA

  25. Slide 25: Continue to operate successfully in South Africa

    CONTINUE TO OPERATE SUCCESSFULLY IN SOUTH AFRICA Security • Integrated multifaceted security strategy plan for the group • Increased deployment of both human and technological resources in and around high-risk areas • Enhanced information sharing and cooperation with the local, provincial and nation

  26. Slide 26: H1 FY20 – cash flow generation and debt redemption

    H1 FY20 – cash flow generation and debt redemption DEON LOUW Financial Director

  27. Slide 27: Cash flow analysis

    H1 FY20 – CASH FLOW GENERATION AND DEBT REDEMPTION Cash flow analysis USD thousand Unaudited Unaudited six months ended six months ended 31 December 2019 31 December 2018 Net cash generated by operations after taxation, royalty and finance costs 13,028.5 21,298.5 Dividends paid (3,399.1) - Reciproca

  28. Slide 28: Movement in net debt

    H1 FY20 – CASH FLOW GENERATION AND DEBT REDEMPTION Movement in net debt ZAR' million USD' million Net Debt as at 30 June 2019 1,829,254,809 129,918,665 Repayment of RCF and Elikhulu facility net of additional draw downs (294,047,580) (20,884,061) Repayment of Elikhulu term facility (100,548,664) (7,

  29. Slide 29: Illustrative de-gearing

    H1 FY20 – CASH FLOW GENERATION AND DEBT REDEMPTION Illustrative de-gearing – assuming forecast assumptions are achieved 160,000 140,000 120,000 100,000 USD’000 80,000 60,000 40,000 20,000 - Dec-19 Mar-20 Jun-20 Sep-20 Dec-20 Mar-21 Jun-21 Sep-21 Dec-21 Mar-22 Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 Sep-2

  30. Slide 30: Hedging summary – zero cost collars

    H1 FY20 – CASH FLOW GENERATION AND DEBT REDEMPTION Hedging summary – zero cost collars 950,000 900,000 850,000 800,000 750,000 700,000 650,000 600,000 50,460oz in H2 of FY20 40,000oz in H1 of FY21 550,000 500,000 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Put

  31. Slide 31: Historic dividend yield – dividends reinstated

    H1 FY20 – CASH FLOW GENERATION AND DEBT REDEMPTION Historic dividend yield – dividends reinstated 7% 6% 5% 4% 3% 2% 1% 0% June 14 June 15 June 16 June 17 June 18* June 19 PAR dividend 5.60% 6.30% 5.10% 5.00% 0.00% 1.00% yield * Dividend suspended due to cessation of large-scale deep level undergroun

  32. Slide 32: Investing in our future

    PAN AFRICAN@ RESOURCES eo) Investing in our future

  33. Slide 33: Investing in the future of our assets

    INVESTING IN THE FUTURE OF OUR ASSETS Growth portfolio - strong track record of delivery Group Resources Group Reserves 36.0Mz (335.8Mt @ 3.33g/t) 10.9Moz (216.6Mt @ 1.57g/t) Tonnes (Mt) Grade (g/t) Gold (t) Gold (Moz) Tonnes (Mt) Grade (g/t) Gold (t) Gold (Moz) Underground combined 110.4 9.35 1 032

  34. Slide 34: Sustaining capital expenditure

    INVESTING IN THE FUTURE OF OUR ASSETS Sustaining capital expenditure 16 14 12 10 USD’ million 8 6 4 2 0 2017 2018 2019* H1 FY20 2020 Forecast** Barberton Mines 8.6 8.6 9.9 5.5 15.0 Evander Mines 14.6 13.7 0.0 1.7 4.6 * Cessation of large-scale underground mining at Evander Mines ** Includes ZAR20 mi

  35. Slide 35: Near-term organic growth

    PAN AFRICAN@ RESOURCES eo) Near-term organic growth

  36. Slide 36: Evander's Egoli Project

    NEAR-TERM ORGANIC GROWTH Evander’s Egoli Project • The Egoli project is an orebody within 3km tramming distance from 7 Shaft > 7 Shaft is currently operational and used to hoist ROM material to the Kinross metallurgical plant • Historical development at 7 Shaft has made ready access to the orebody p

  37. Slide 37: Royal Sheba

    NEAR-TERM ORGANIC GROWTH Royal Sheba • Design has been completed for the early extraction of the western block in Phase 1 Phase 1 Mining • Possibility to fill the current plant capacity from this deposit • Marginal grade deposit with 900m strike and up to 30m width • Ore body is open at depth and on

  38. Slide 38: Where to next - FY20 and beyond

    Where to next - FY20 and beyond

  39. Slide 39: Where to next - FY20 and beyond

    WHERE TO NEXT - FY20 AND BEYOND “We are confident the group is now successfully repositioned and poised to increase returns to shareholders from existing portfolio as opposed to acquisitive growth”. 39

  40. Slide 40: Thank you

    THANK YOU

Pan African Resources — H1 FY2020 Earnings Presentation on 6ix