For personal use only PROGRESSING TO PRODUCTION VAN UDEN GOLD PROJECT Western Australia Gold Coast Investment Showcase - June 2025 ASX:TG6
Slide 2: Disclaimer
DISCLAIMER This presentation has been prepared by TG Metals Limited. The information contained in this presentation is not investment or FORWARD LOOKING STATEMENT financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has been This pr
Slide 3: Reviving Forrestania's Gold Legacy
REVIVING FORRESTANIA’S GOLD LEGACY Van Uden Gold Project – 80% interest in granted mining leases & exploration licences. Remaining 20% held by regional gold producer Updated MRE to JORC 2012 Compliance – 227Koz Au with upside For personal use only Previous Operating Mines – Tenure includes previous
Slide 4: Corporate Overview
CORPORATE OVERVIEW Capital Structure Shareholder Composition Top 50 Shareholders 64.93% Shares on Issue Cash & Receivables1 Market Cap2 Directors & Management 8.99% 80.6M $2.0M $10.0M For personal use only 1 2 Montague Resources Australia 7.09% at 1 May 2025 at $0.12.5 share price Founders 20.45% Un
Slide 5: Gold Project - Size and Room to Grow
VAN UDEN GOLD PROJECT – SIZE AND ROOM TO GROW New MRE – 6.35Mt @ 1.1 g/t Au for 227Koz Au – ASX Release 5 June 2025 Mineral Resource Estimate for the Van Uden Gold Deposit - May 2025 Material Indicated Inferred Total Grade Grade Grade Tonnes (Au g/t) Gold (Oz) Tonnes (Au g/t) Gold (Oz) Tonnes (Au
Slide 6: Gold Project - A High-Grade Asset with Strong Upside
VAN UDEN GOLD PROJECT – A HIGH-GRADE ASSET WITH STRONG UPSIDE High-Grade Open Pit Gold Asset – New MRE constrained by A$5000/oz pit shell. High grade zones well defined. Historic open pit production at >2.5g/t Au For personal use only Exploration Upside – Historic drilling only to 150m, providin
Slide 7: Project Overview
VAN UDEN PROJECT OVERVIEW Strategic Location – Situated in Forrestania Greenstone Belt, in proximity to TG6's Lake Johnston Project (Li) Proximity to Processing Facilities – Trucking distance on sealed roads to Marvel Loch, Edna May and Coolgardie For personal use only gold processing Plants E
Slide 8: Project - Tasman Open Pit
VAN UDEN PROJECT – TASMAN OPEN PIT HIGH GRADE AT SHALLOW DEPTHS Previous small-scale mining to less than 30m depth produced 136,023t @ 2.54g/t Au for 11,142oz Au* Mineralisation within pit floors (pit depth approx. 30m) and extending down dip and open IMMEDIATE FOCUS For personal use only New
Slide 9: Project - Dieman Open Pit
VAN UDEN PROJECT – DIEMAN OPEN PIT HIGH GRADE AT SHALLOW DEPTHS Previous small-scale mining, for a dump leach trial 1990 Mineralisation within pit floors (pit depth less than 30m) and extending down dip and open For personal use only NEAR-TERM POTENTIAL Evaluate extensive near-surface laterite
Slide 10: Pits and Stockpiles
PITS AND STOCKPILES Dieman Pit – 2 leach pads oxide and laterite Tasman Pit – 2 For personal use only stockpiles, separated into rock types, sedimentary and mafic Easy access in for transport out. SMALL SCALE MINING PROPOSAL IN PROGRESS 10
Slide 11: Gold City Prospect
GOLD CITY PROSPECT Previous small scale mining – no historic production records Multiple gold lodes defined by drilling Opportunity for additional drilling to define initial resource – open at depth and along strike Potential for value adding incremental discoveries For personal use only OPE
Slide 12: Value Proposition - Strategic Addition and Synergies
VALUE PROPOSITION - STRATEGIC ADDITION AND SYNERGIES Dual Commodity Strength – Diversifies risk through gold & lithium exposure, maximising market opportunities Strategic Expansion – Van Uden Gold adds a second high-value asset alongside Lake For personal use only Johnston Lithium Fast-Track Potenti
Slide 13: Next Steps
NEXT STEPS 2012 JORC Compliant Exploration Near-Term For personal use only Resource Plans Production • Resource Estimation – Completed • Sample & Assess Historic Surface • Stockpile Evaluation – Assess scale • Bulk Density Test Work – Completed Stockpiles – Drilling Completed, (surveying completed),