Tg Metals — Investor Presentation (April 2026)
16 slides from Tg Metals's investor presentation, Apr 20, 2026
Slide 1: Gold and Lithium Projects – Investor Presentation
GOLD AND LITHIUM PROJECTS For personal use only Western Australia Advanced Deposits On Pathways To Production April 2026 INVESTOR PRESENTATION ASX:TG6
Slide 2: Disclaimer
DISCLAIMER This presentation has been prepared by TG Metals Limited. The information contained in this presentation is not investment or FORWARD LOOKING STATEMENT financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has been This pr
Slide 3: Van Uden Gold Project – Lake Johnston Lithium Project
VAN UDEN GOLD PROJECT – LAKE JOHNSTON LITHIUM PROJECT Historical gold production with pathway to recommence mining Advanced lithium deposit primed for development For personal use only Resource Growth Van Uden gold MRE updated to 270,800oz*. Burmeister lithium deposit resource drill ready Exploratio
Slide 4: Corporate Overview
CORPORATE OVERVIEW Capital Structure Shareholder Composition Shares on Issue Market Cap 120.5M $18.1M at $0.145 share price For personal use only Directors & Management 12 Month Share Price Performance Richard Bevan Non Exec Chairman Brett Smith Non Exec Director Gloria Zhang Non Exec Director David
Slide 5: Gold Project Overview
VAN UDEN GOLD PROJECT OVERVIEW Forrestania Greenstone Belt significant gold endowment and production Historic Production with two shallow open pits, For personal use only stockpiles, gold mineralisation from surface Growing Resource with 270,800oz* open along strike (+7km) and down dip. Situ
Slide 6: Significant Gold Resource with Upside
VAN UDEN PROJECT – SIGNIFICANT GOLD RESOURCE WITH UPSIDE Current Mineral Resource 7.94Mt @ 1.1 g/t Au for 270,800 oz1 (JORC 2012) Pit constrained Conceptual Pit Outline Open along strike and down dip, new drill hits For personal use only 550m south of MRE and below MRE High grade zones well
Slide 7: Enormous Expanded Strike Upside
VAN UDEN PROJECT – ENORMOUS EXPANDED STRIKE UPSIDE Extensive soil sampling assays define gold in soil anomaly 6.5km long1 plus added northern tenure another 500m of strike First drilling 550m south2 of the MRE delivered new For personal use only discovery 3m @ 3.46 g/t Au and 11m @ 1.19 g/t Au C
Slide 8: Gold Project – Resource Expansion
VAN UDEN GOLD PROJECT – RESOURCE EXPANSION Shallow north end drilling <150m depth, remains open For personal use only Infill drilling and strike expansion drilling delivers outstanding results Updated MRE increases Indicated category substantially – mine designs next 8
Slide 9: Pathways to Production
VAN UDEN PROJECT – PATHWAYS TO PRODUCTION First Metallurgical testwork focusing on Toll Treatment offsite and Heap Leach on site Laterite resource* 1,053,000 tonnes @ 0.52g/t Au for 17,700oz – earmarked for on site treatment For personal use only Why laterite? Low cost model pathway for capi
Slide 10: Gold City Prospect – Exploration Opportunity
GOLD CITY PROSPECT – EXPLORATION OPPORTUNITY – EVOLVING SATELLITE 20kms south of Van Uden Numerous historical gold workings at “Downtown” Multiple gold lodes defined by only 11 For personal use only historic RC drill holes and 7 new RC drillholes including: 14m @ 2.26g/t Au1 from 20m; 25m
Slide 11: Gold City Prospect – Enormous Upside
GOLD CITY PROSPECT – ENORMOUS UPSIDE Untested gold in soil anomalies Expanded soil anomaly N-E of historical For personal use only workings New drilling defines apparent plunge to the N-E Multiple lodes Mineralisation controls to be intersected in most drill defined holes Potential repet
Slide 12: Lake Johnston Project – Significant Hard Rock Lithium Deposit
LAKE JOHNSTON PROJECT – SIGNIFICANT HARD ROCK LITHIUM DEPOSIT Burmeister Exploration Target Statement* Tonnes Range Tonnes Range Li2O Range Li2O Range Low High Low (%) High (%) 15.6 million 20.1 million 0.97 1.19 For personal use only At 0.4% Li2O cutoff The Exploration Target quantity and grade i
Slide 13: Lake Johnston Project – Upside
LAKE JOHNSTON PROJECT – UPSIDE Jaegermeister – Emerging second deposit of similar size to Burmeister Open in all directions Best drill intercepts*: For personal use only 10m @ 1.19% Li2O, from 73.0m 6m @ 1.38% Li2O, from 76.0m 4m @ 1.51% Li2O, from 85.0m Protecting IP for Hybrid Flowsh
Slide 14: Next Steps – Resource Growth and Pathway to Production
NEXT STEPS – RESOURCE GROWTH AND PATHWAY TO PRODUCTION NEAR-TERM OPPORTUNITIES Updated Van Uden MRE forming the basis for mine designs for the Laterite Heap Leach Project and the Ultimate pit development Metallurgical gold testwork – to underpin process design leading into feasibility For person
Slide 15: Value Proposition
VALUE PROPOSITION - ENORMOUS UPSIDE POTENTIAL FOR BOTH GOLD AND LITHIUM GROWTH Dual Commodity Exposure For personal use only Pathways to Production FOR MORE INFORMATION David Selfe – CEO Email: dselfe@tgmetals.com.au Resource growth Richard Bevan - Chairperson Email: rbevan@tgmetals.com.au Right Loc
Slide 16: Appendices – Van Uden Mineral Resource Estimate
APPENDICES – VAN UDEN MINERAL RESOURCE ESTIMATE For personal use only OPEN DOWN DIP, AND Notes to Resource Table: The MRE is estimated with all available drilling data as at 1 April 2026 and reported at a 0.1g/t Au cutoff for ALONG Laterite and 0.30g/t Au cutoff for all other material typres. MRE re