Evolution Mining Limited · ASX:EVN

Evolution Mining — Investor Presentation (May 2014)

30 slides from Evolution Mining's investor presentation, May 27, 2014

  1. Slide 1: Pajingo

    For personal use only Pajingo May 2014 Simon Jessop – General Manager Underground Operations

  2. Slide 2: Disclaimer

    Disclaimer For personal use only  This presentation has been prepared by Evolution Mining Limited (“Evolution Mining”) and consists of slides for a presentation concerning the company. By reviewing/attending this presentation, you acknowledge and agree the following.  This presentation includes fo

  3. Slide 3: Location

    Location For personal use only  Located 200km south of Townsville  Drive-in-drive-out from Charters Towers  Power: 5.5MW - grid power  Water: town pipeline and recycled mine water  Average annual rainfall – 672mm 3

  4. Slide 4: History

    History For personal use only  1987 Open pit mining commenced at Scott Lode  1991 Normandy JV  1995 Vera discovered  1996 Underground production commenced  2001 Newmont acquisition of Normandy  2008 Acquisition by NQM and Heemskirk  Nov 2010 Acquisition by Conquest  Nov 2011 Evolution Merger

  5. Slide 5: Pajingo

    Pajingo  Field has produced 2.7Moz since 1996 – excellent For personal use only Mine Type Open pit and underground exploration upside remains  Focus on higher grade, more profitable ounces Minerals Gold  Workforce: approx. 220 including contractors Mineralisation type Low-sulphidation epithermal

  6. Slide 6: Historical production

    Historical production For personal use only Gold Produced (ounces) 350,000 300,000 250,000 Ounces Au (oz) 200,000 Edna May Crushing Circuit 150,000 100,000 50,000 0 Note: * Dec 2007 qtr data not included as not available Year ** Grade and recovery not availabe for Sep 2011 quarter *** FY2014 to Mar

  7. Slide 7: Safety, Environment & Community

    For personal use only Safety, Environment & Community

  8. Slide 8: Safety, environment & community

    Safety, environment & community For personal use only • Culture showing strong improvement • Safety leadership and GOLD programmes Safety • LTIFR 2.1 and TRIFR 12.8 (30 Apr 2014) • Mine project for SWI and JSA updates underway • Compliance monitoring as per EA • Improving water management at site En

  9. Slide 9: Processing

    For personal use only Processing

  10. Slide 10: Process flowsheet

    For personal use only Process flowsheet 10

  11. Slide 11: Historical plant performance

    Historical plant performance For personal use only Head Grade v Recovery 100 14 99 12 98 10 % Recovery Grade (g/t) 97 8 96 6 95 4 94 2 93 0 92 Recovery Head grade Note: * Dec 2007 qtr data not included as not available ** Grade and recovery not availabe for Sep 2011 quarter *** FY2014 to Mar 2014 qu

  12. Slide 12: Processing performance FY14

    Processing performance FY14 For personal use only July 13 to March 14 Pajingo Plant throughput (campaign) 400 – 425 kt Plant availability 98% Throughput rate ~81tph Grade 4.63g/t Gold recovery 95.7% Gold produced 44,271oz Silver produced 35,294oz Pajingo plant 12

  13. Slide 13: Processing improvements

    Processing improvements For personal use only  Campaign milling has reduced total Mill balls rejected by Mt Carlton SAG mill milling costs by approximately 30%  Reduction in contractors due to new operating philosophy  Replacement of transformers has improved the reliability of power to the proce

  14. Slide 14: Mining

    For personal use only Mining

  15. Slide 15: Mine performance FY14 YTD

    Mine performance FY14 YTD For personal use only July 2013 to March 2014 Units Pajingo UG lateral development - capital m 1,862 UG development - operating m 1,861 Total UG lateral development m 3,723 UG ore mined kt 223 UG grade mined g/t 6.01 Total ore mined kt 223 Total tonnes processed kt 311 Grad

  16. Slide 16: Mining

    Mining  Restructure of mining team For personal use only late 2013 to align with mine schedule  Mine planning processes significantly improved for UG operations – forecasts, design checkpoints and planning meetings  Sharing mine equipment between Pajingo and Cracow  Knowledge and experience Vera

  17. Slide 17: Mining equipment

    Mining equipment  Development Drills For personal use only  2 x Sandvik DD421  Production Drills  2 x Solo LC10  1 x S/Boom being converted  Boggers  1 x Sandvik LH621  1 x Sandvik LH410  1 x Caterpillar 1700G Jumbo  UG Mine Trucks  3 x Atlas MT6020  1 x AD45 Water Truck Edna May open pi

  18. Slide 18: Production and cash cost

    Production and cash cost For personal use only 60,000 1,200 A$998 A$1,004 A$830 A$814 Production (oz) 40,000 800 Cost A$/oz Edna May Crushing Circuit 23,367oz 20,000 16,858oz 400 15,068oz 12,346oz 0 0 Jun Qtr Sep Qtr Dec Qtr Mar Qtr 2013 2013 2013 2014 Production gold oz C1 Cash Cost 18

  19. Slide 19: Cost saving initiatives

    Cost saving initiatives For personal use only  New ground support profiles  Improved drill and blast patterns for less dilution and improved fragmentation  Challenging all suppliers on costs for improved results  Removing low value add but high costs services (eg. mine control)  Improved accoun

  20. Slide 20: Exploration

    For personal use only Exploration

  21. Slide 21: Exploration – Strategy and Plan

    Exploration – Strategy and Plan For personal use only  Transformational discovery – maximise opportunity  Capability of the orebody drives the business  4D and Seismic – data mining and step change  Think like scientists to increase prospectivity  Project pipeline – depth and quality  Rank, pr

  22. Slide 22: Exploration in FY14

    Exploration in FY14 For personal use only  4D Project Data mining in 3D –  time 4th dimension Footprint of Seismic Survey  2D and 3D Seismic  Map deep fault systems  Basin analysis – mineralisation and inversion  Potential for transformation 22

  23. Slide 23: 3D seismic location

    3D seismic location For personal use only 0 2,000m Proof of concept diamond holes 1.2km x 1.6km area of 3D Location of Vera Nancy fault 23

  24. Slide 24: 2D seismic section interpretation

    2D seismic section interpretation For personal use only  Direct targeting from seismic Location of Vera Nancy fault 3km depth 0 2,000m Syn-mineral normal faults Less competent, more permeable rock units on top Post-mineral inversion Identification of mechanically favourable host rock to mineralisat

  25. Slide 25: Work ahead

    Work ahead For personal use only  3D Seismic survey to the SE of V-N line of lode (including parts of Moonlight area), plan to complete end of June FY14 quarter  Completion ASD/litho- geochemical profiling at both local and regional scales to produce alteration / pathfinder maps Seismic trucks  I

  26. Slide 26: Appendix

    For personal use only Appendix

  27. Slide 27: Resources

    Resources Pajingo Mineral Resources - December 2012 For personal use only Measured Indicated Inferred Total Resource Mineral Resource Tonnes Grade Cont. Cont. Cont. Cont. Tonnes Grade Tonnes Grade Tonnes Grade Metal Metal Metal Metal (Mt) Au (g/t) (Mt) Au (g/t) (Mt) Au (g/t) (Mt) Au (g/t) Au (koz) A

  28. Slide 28: Reserves

    Reserves Pajingo Ore Reserves - December 2012 For personal use only Proved Probable Total Reserve Ore Reserve Cont. Cont. Cont. Tonnes Grade Tonnes Grade Tonnes Grade Metal Metal Metal (Mt) Au (g/t) (Mt) Au (g/t) (Mt) Au (g/t) Au (koz) Au (koz) Au (koz) Open-Pit Venue 0.01 3.9 1 0.17 5.6 30 0.18 5.5

  29. Slide 29: Competent person statement

    Competent person statement The information in this presentation that relates to exploration results, Mineral Resources or Ore For personal use only Reserves listed in the table below is based on work compiled by the person whose name appears in the same row, who is employed on a full-time basis by t

  30. Slide 30: Evolution Mining

    For personal use only Evolution Mining ASX Code: EVN www.evolutionmining.com.au