Tasman Resources Ltd · ASX:TAS

Tasman Resources — Shareholder Meeting (October 2011)

28 slides from Tasman Resources's shareholder meeting presentation, Oct 31, 2011

  1. Slide 1: Annual General Meeting

    For personal use only Annual General Meeting 31st October 2011 Greg Solomon Executive Chairman

  2. Slide 2: Tasman Group Corporate Overview

    Tasman Group Corporate Overview For personal use only Tasman Resources Ltd Minerals (TAS) Cu, Au, U, Ag, Pb, Zn. 17.2% 19.0% Eden Energy Ltd Fission Energy Ltd (EDE) (FIS) 100% 50% Pyrolysis 100% Mt Thirsty Co-Ni Hydrogen--Hythane Hydrogen 100% 100% Dual fuel Uranium – SA, WA 50% Gas (UK)

  3. Slide 3: Lake Torrens Project Summary

    Lake Torrens Project Summary For personal use only • > 2,000 km2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic Dam - includes two known IOCGU systems (Vulcan and Titan) and 4 interpreted systems • Vulcan - new IOCGU system discovered Nov 2009 - Similar target are

  4. Slide 4: Lake Torrens Project: Location Plan

    Lake Torrens Project: Location Plan For personal use only EL 4322

  5. Slide 5: VULCAN

    VULCAN For personal use only • Vulcan - new IOCGU system discovered Nov 2009 - IOCGU min./alt. (all 8 holes) - Cu, Au, Ag, U, Mo (+ REE) - 57 m of strong chalcopyrite/pyrite mineralisation in VUD 3 - +150m “classic” min. hematite hematite--rich breccias in VUD 7 - Classic zonation (bornite/chalcopyr

  6. Slide 6: Lake Torrens Project: Showing Tectonic Lineaments (WMC, 1975)

    Lake Torrens Project: Showing Tectonic Lineaments (WMC, 1975) For personal use only EL 4322

  7. Slide 7: Lake Torrens Project: Gravity

    Lake Torrens Project: Gravity For personal use only EL 4322

  8. Slide 8: Lake Torrens Project: Bouguer gravity (+residual inset)

    Lake Torrens Project: Bouguer gravity (+residual inset) For personal use only EL 4322

  9. Slide 9: IOCGU Project: Residual Gravity Image showing Tasman Drilling

    Vulcan IOCGU Project For personal use only Residual Gravity Image showing Tasman Drilling

  10. Slide 10: Olympic Dam - Vulcan: Residual Gravity Comparison

    Olympic Dam - Vulcan: Residual Gravity Comparison (calculated residual gravity response if Vulcan at same depth as OD) For personal use only Olympic Dam Vulcan 2km 2km

  11. Slide 11: VUD core photos: sulphide-rich breccia

    Vulcan VUD 001 For personal use only Heterolithic, sulphide- rich breccia Mineralised, hematite matrix- rich breccia (py, cpy) Heterolithic, carbonate breccia (py, cpy, hem)

  12. Slide 12: VUD: Massive Sulphides 930.2 - 930.9m

    Vulcan: VUD 3 Massive Sulphides - 930.2 - 930.9m For personal use only py cpy

  13. Slide 13: VUD 003: Cu - Au - U3O8 Mineralisation

    Vulcan VUD 003: Cu - Au - U3O8 Mineralisation For personal use only Core from interval: 0.34m at 5.9% Cu, 2.23g/t Au Core from interval: 0.75m at 4.4% Cu, 1.34g/t Au, 0.58kg/t U3O8

  14. Slide 14: VUD 008: Silica-Hematite Breccia

    Vulcan VUD 008: Silica- Silica-Hematite Breccia (+ bornite - chalcopyrite) For personal use only

  15. Slide 15: VUD 002: Molybdenite Mineralisation Dating

    Vulcan VUD 002: Molybdenite Mineralisation: PACE 2020 Re187 – Os187 Dating For personal use only

  16. Slide 16: VUD intercepts: 245m Alteration and Mineralisation

    Vulcan VUD 3 For personal use only • 245m Alteration and Mineralisation, includes: From To m Cu (%) Au (g/t) U3O8 (kg/t) 874.20 930.85 56.65 0.59 0.17 0.05 includes: 895.08 895.42 0.34 5.85 2.23 0.03 and 912.00 919.80 7.80 1.21 0.35 0.14 includes: 919.05 919.80 0.75 4.44 1.34 0.58 and 930.20 930.85

  17. Slide 17: VUD: Down-hole correlation of IOCGU metals

    Vulcan VUD 003 Down--hole correlation of IOCGU metals Down For personal use only Cover Sediments Cover Sediments Basement Basement Au Cu U3O8 Cu

  18. Slide 18: IOCGU Project: Residual Gravity Image showing Tasman Drilling

    Vulcan IOCGU Project For personal use only Residual Gravity Image showing Tasman Drilling

  19. Slide 19: VUD 7: +150m of Hematite Breccia

    Vulcan VUD 7: +150m of Hematite Breccia For personal use only

  20. Slide 20: VUD 7: 150m+ Alteration and Mineralisation

    Vulcan VUD 7 For personal use only • 150m+ Alteration and Mineralisation, includes: From To m Cu (%) Au (g/t) U3O8 (kg/t) Mo (%) 1065 1228 163 0.23 0.08 0.04 0.01 Includes: 1118 1208 90 0.25 0.09 0.05 0.02

  21. Slide 21: Olympic Dam – Vulcan Zonation Comparison

    Olympic Dam – Vulcan Zonation Comparison For personal use only

  22. Slide 22: IOCGU Project: Residual Gravity Image showing Tasman Drilling

    Vulcan IOCGU Project For personal use only Residual Gravity Image showing Tasman Drilling

  23. Slide 23: Prospect: Comparisons

    Vulcan Prospect: Comparisons For personal use only

  24. Slide 24: IOCGU Project: Current Program

    Vulcan IOCGU Project: Current Program For personal use only • Geol. & geophys. review, remodelling Completed • Dating of selected samples Results available • Select new drill targets Completed • Conclude 9B agreement with KU Completed • Heritage survey over new targets Awaiting report • Drill highes

  25. Slide 25: Lake Torrens Project: Location Plan

    Lake Torrens Project: Location Plan For personal use only EL 4322

  26. Slide 26: Lucas Hill: Bouguer Gravity

    Lucas Hill: Bouguer Gravity For personal use only

  27. Slide 27: Lucas Hill: Residual Gravity

    Lucas Hill: Residual Gravity For personal use only

  28. Slide 28: Competent Person's Statement

    Competent Person’s Statement For personal use only The information in this presentation that relates to Exploration Results and Activities is based on information compiled by Robert Smith and Michael Glasson who are Members of the Australian Institute of Geoscientists. Robert Smith and Michael Glass

Tasman Resources — Shareholder Meeting (October 2011) on 6ix