Camino Minerals Corporation · TSXV:COR
Camino Minerals — Investor Presentation (October 2024)
22 slides from Camino Minerals's investor presentation, October 2024
Slide 1: Camino Corp October 2024
CAMINOCORP.COM TSX.V : COR | OTCQB : CAMZF | WKN: A116E1 OCTOBER 2024
Slide 2: Cautionary Notes and Forward-Looking Statements
Cautionary Notes and Forward-Looking Statements Forward Looking Statements: Forward-looking information in this presentation includes statements with respect to the proposed acquisition of the Project; the closing of the Transaction and satisfaction of the related conditions to close; the anticipate
Slide 3: Experienced Board and Management
3 EXPERIENCED BOARD AND MANAGEMENT JAY CHMELAUSKAS, BASc Geol. Eng., MBA CHRIS ADAMS CEO, President, Director Lead Independent Director • Former CEO of start-up to production companies Jinshan Goldmines Corp. (China), • Former Senior Managing Director and head of Macquarie’s mining finance now China
Slide 4: Camino Strategy – Cashflow and Production Re-rating
44 CAMINO STRATEGY – CASHFLOW AND PRODUCTION RE-RATING 1. CONSTRUCT – The Puquios Copper Mine in Chile (with Nittetsu); Cashflow in the Current Copper Cycle. • Construct (with permits in place) the copper mine to generate cashflow as early as 2027. • Finance and operate the mine with Camino and Nitt
Slide 5: Construction & Production Chile
55 CONSTRUCTION & PRODUCTION CHILE
Slide 6: Puquios Copper Mine Purchase with Nittetsu
6 PUQUIOS COPPER MINE PURCHASE WITH NITTETSU Joint Venture with Nittetsu Mining Nittetsu is a Japanese corporation listed on the Tokyo • 50:50 Joint Venture Stock Exchange with 84-year history as a mining and • Each partner has rights to 50% of Cathode Offtake trading company. • CAMINO will manage P
Slide 7: DFS Engineering and Peer Review
7 DFS ENGINEERING AND PEER REVIEW Definitive Feasibility Study (Ausenco) Conventional Project for Execution • Geology - Wood • Open Pit with SX-EW copper cathode production • Mining - Moose Mountain • Leach and stack deposits from pre-strip material • Plant & infrastructure – Ausenco • Experienced w
Slide 8: Upside Potential: Additional Sulphide Tonnage Below Open Pit
8 UPSIDE POTENTIAL: ADDITIONAL SULPHIDE TONNAGE BELOW OPEN PIT LOCAL OXIDE, SULPHIDE RESOURCES, AND LEACHING TECHNOLOGY Local Oxide Miners in the Area: • Identifying local miners with potential to provide ore > 0.6 % CuT • Typically provides over 20% of feed for producing mines in region • Managemen
Slide 9: Development Peru
9 9 DEVELOPMENT PERU
Slide 10: Los Chapitos Copper
10 LOS CHAPITOS COPPER Potentially the Next Low-Capital Copper Oxide Mine to Build • Los Chapitos has over 26,000 meters of drilling completed intercepting mantos and breccia structures of oxide and sulphide copper mineralization. • 23,000 HA of contiguous exploration ground with three mineralized s
Slide 11: Los Chapitos Drilling Highlights
11 Multiple Mineralized Trends – DIVA, ATAJO, LA ESTANCIA 23,000 ha LOS CHAPITOS Pad 1 to Pad 4 extend over 350m strike length of Diva Trend DRILLING HIGHLIGHTS Significant copper intercept highlights (not true thickness) for Pad 1, Pad 2A, and Pad 4 include: DCH-001 (Pad 1) 55.3m @ 0.73% Cu from 7.
Slide 12: Established Mining District - Los Chapitos Copper, Peru
12 ESTABLISHED MINING DISTRICT - LOS CHAPITOS COPPER, PERU • Rio Tinto increasing claims contiguous to Camino in 2023 and 2024. Rio Tinto targeting large scale copper sulphide deposit along the La Estancia fault that continues on Camino claims for 12km then extends onto RT’s adjacent claims. • Mina
Slide 13: Infrastructure to Build a Mine
13 INFRASTRUCTURE TO BUILD A MINE (SIMILAR TO MARCONA AND MINA-JUSTA) 1. Power: 510KV lines over the property. Sub- station in nearby Chala. 2. Water: Seawater processing 15km to project. 3. Access: 40 minutes from Pan American Highway (mining and transport Town of Chala). Source: Esri, Garmin, GEBC
Slide 14: Exploration Peru & Chile
14 14 EXPLORATION PERU & CHILE
Slide 15: Exploration Upside at Puquios
15 15 EXPLORATION UPSIDE AT PUQUIOS (10,700 HA EXPLORATION & 2,894 HA EXPLOITATION)
Slide 16: Maria Cecilia
16 MARIA CECILIA MAJOR PORPHYRY SYSTEM PROLIFIC COPPER BELT • Newly Permitted Maria Cecilia central porphyry drilled in June 2024 • One drill hole has been completed to a depth of 700 meters with results expected in late August 2024 • Targeting oxide and sulphide copper mineralization outcropping at
Slide 17: Maria Cecilia NI43-101 Resource Statement (2020)
17 MARIA CECILIA NI43-101 RESOURCE STATEMENT (2020) Mineral Resource Statement for Toropunto and Emmanuel projects (8.9 US$/t NSR cut-off), Ancash Department, Peru, SRK Consulting (Peru) S.A., December 2020 Project Category Tonnes (Mt) CuEq (%) Cu (%) Au (g/t) Ag (g/t) Mo (ppm) (%) Toropunto Inferre
Slide 18: Capital Structure
18 CAPITAL STRUCTURE Management Denham Capital CURRENT CAPITAL STRUCTURE 8% 14% Delbrook SHARES OUTSTANDING 209,251,638 8% Capital WARRANTS (@ $0.10 EXERCISE PRICE) 33,333,334 10% Management OPTIONS (@ $0.15 AVERAGE EXERCISE PRICE) 16,225,000 Retail 61% Other Institutions
Slide 19: Our Commitment to ESG
19 OUR COMMITMENT TO ESG Camino Corp. is dedicated to developing our projects to bring sustainable and long-lasting social and economic benefits for the host communities and all stakeholders. We engage in meaningful consultation and honest dialogue with representatives of the communities surrounding
Slide 20: Camino Platform Value
20 CAMINO PLATFORM VALUE: • ”Shovel-Ready” copper asset that has been with private equity. • Scarce asset profile consisting of production, development and exploration copper projects in Chile & Peru. • Extreme undervaluation compared to historical investments and peer value comparison. • Management
Slide 21: Camino – Undervalued by Comparison
21 CAMINO – UNDERVALUED BY COMPARISON
Slide 22: Jay Chmelauskas, CEO, President & Director
22 JAY CHMELAUSKAS BASC, MBA INVESTOR RELATIONS CEO, PRESIDENT & DIRECTOR INFO@CAMINOCORP.COM JAYC@CAMINOCORP.COM WWW.CAMINOCORP.COM 1.604.493.2058