    RESPONSIBLY MEETING GLOBAL DEMAND FOR QUALITY-OF-LIFE MINERALS Investor Presentation January 2022

  2. Slide 2: Disclaimer

    Disclaimer This Presentation (the “Presentation”) has been This Presentation does not constitute or form part statements in this Presentation relating to future prepared and issued by Kenmare Resources plc of, and should not be construed as, an offer, financials, results, plans and expectations (the

  3. Slide 3: Overview: Kenmare Resources

    Overview: Kenmare Resources The world’s largest ilmenite producer Moma Mine in Mozambique Wet Concentrator Plant B mining at Pilivili  15 years of production with >30 years in Mozambique  >100 years life of mine  Low environmental impact – 90% of power from renewable source (hydropower)  Meaning

  4. Slide 4: Delivering increased production and profitability

    Delivering increased production and profitability Ramping up to 1.2 Mtpa ilmenite production GROWTH 46% 2021 was a record year for safety, production and production shipments Guidance of 1.125 to 1.225 Mt of ilmenite (plus associated increase co-products) in 2022 MARGIN 49%1 H1 2021 EBITDA margin up

  5. Slide 5: Committed to safety and sustainability

    Sustainability Committed to safety and sustainability Over six million hours worked in 2021 without a Lost Time Injury Safety Sustainability COVID-19  Lowest ever Lost Time Injury  Inaugural Sustainability Report  96% of employees at the Moma Frequency Rate (LTIFR) in 2021 published for year-end

  6. Slide 6: FY 2021 production review

    FY 2021 production review Record year for production and shipments 30% increase in HMC production vs FY 2020 HMC production Ilmenite  Benefitted from 19% increase in ore grades (4.63% THM) following WCP B’s relocation to Pilivili in Q3 2020 1,555,900t 1,119,400t +30% +48%  14% increase in excavate

  7. Slide 7: Financial strength and flexibility

    Financial strength and flexibility Year -end highlights Capital projects H1 2021 Highlights Net Debt (US$m) RUPS1 Revenue (CIF) (US$m) EBITDA (US$m) US$82.8m Underway US$178.2m US$82.3m 31.12.2020: US$64.0m Expected completion H1 2020: US$116.8m H1 2020: US$37.2m Q1 2022 Cash (US$m) Nataka PFS Profi

  8. Slide 8: Development projects

    Development projects 1.2Mtpa ilmenite projects delivering HMC pumped from Pilivili arriving at MSP WCP B Move  Substantially complete  Work is underway to increase utilisation rate of the pumping system to transport HMC from Pilivili to the MSP  Road haulage will continue to be reduced as these i

  9. Slide 9: Nataka PFS on track for delivery in 2022

    Nataka PFS on track for delivery in 2022 Nataka mining expected to commence in 2025 Hydromining trial at WCP A Developing orebody knowledge for resource confidence and mining resilience  To be completed in 2021:  Geotechnical testing including wide coverage CPTu drilling and trial pit  Hydrogeolo

  10. Slide 10: ~US$100m shareholder returns in 2021

    ~US$100m shareholder returns in 2021 Increased dividend payment in H1 2021 and share buy-back completed Dividends (USc/share) Share buy-back 10 # of shares repurchased % of ISC repurchased 7.7 5 5.5 14.8m 13.5% 7.3 2.7 Total cash returned ISC following completion 2.3 0 2019 2020 2021 US$81.6m 94.9m

  11. Slide 11: Market Update

    Market Update Titanium feedstocks

  12. Slide 12: Record sales at higher prices for all products

    Record sales at higher prices for all products Market absorbing increased Kenmare production at higher prices Sales price (FOB) (US$/t) $300/t $200/t $100/t $0/t H1 H2 H1 H2 H1 H2 H1 H2 H1 2017 2018 2019 2020 2021 Ilmenite price ($/t) Average price ($/t) Recovery in downstream markets resulted in st

  13. Slide 13: Strong global demand for Kenmare ilmenite

    Strong global demand for Kenmare ilmenite Average received ilmenite price up 13% in Q4 vs Q3 2021 Ilmenite sales volumes by region Ilmenite upgrading in China remains a key growth market1 40 15 Asia ex-China Americas 30 10 '000 tonnes '000 tonnes 20 5 10 Europe 0 0 Jul-19 Jul-20 Jul-21 Oct-19 Jan-19

  14. Slide 14: Positive momentum continuing into 2022

    Positive momentum continuing into 2022 Q4 2021 review and 2022 outlook Ilmenite Ilmenite  Robust ilmenite market continued through Q4 2021, with demand for Kenmare’s ilmenite exceeding ability to supply  Global ilmenite inventories remain at low levels and supply constraints are adding to the dema

  15. Slide 15: Outlook

    Outlook R71,125 Jetty at sunrise

  16. Slide 16: 2022 production guidance

    2022 production guidance Kenmare is well advanced in achieving targeted production of 1.2 Mtpa ilmenite on a sustainable basis Production FY 2022 Guidance FY 2021 Actual FY 2020 Actual Ilmenite tonnes 1,125,000 - 1,225,000 1,119,400 756,000 Primary zircon tonnes 54,400 - 63,200 56,300 43,300 Rutile

  17. Slide 17: Becoming a first quartile margin producer

    Becoming a first quartile margin producer Kenmare is well-positioned to deliver strong free cash flow Industry revenue to cash cost curves 4 Revenue to Cash Cost Ratio 3 2 KMR KMR 1 2023 KMR 2018 Q1 2013 Q2 Q4 0 0% 25% 50% 75% 100% 2013 2018 2023  Kenmare is on track to become a first quartile marg

  18. Slide 18: Building on our strategy

    Building on our strategy Strategy FY 2021 Performance FY 2022 Targets Growth: Production rising to 1.2 Mtpa ilmenite  Record year for production and  Focused on delivering 1.2 Mtpa  Low capital intensity growth to shipments ilmenite production sustainably fully utilise existing installed faciliti

  19. Slide 19: Appendices

    Appendices Mining at WCP A

  20. Slide 20: Mineral sands: essential to modern life

    Mineral sands: essential to modern life Two core product streams, titanium feedstocks & zircon World GDP vs TiO2 pigment consumption1 Titanium feedstocks (ilmenite and rutile)  TiO2 pigment imparts whiteness and opacity in the 6 450 Global GDP Index Million tonnes manufacture of paints, plastics an

  21. Slide 21: Overview: Moma Titanium Minerals Mine

    Overview: Moma Titanium Minerals Mine Globally significant Mineral Reserves Tier 1 resource base Operational process outline  >100 year life of mine at targeted production rate of 1.2 Mtpa Wet Heavy mineral Dredge + dry mining concentrator concentrate  Moma is comprised of multiple ore zones – 6.4

  22. Slide 22: EBITDA margin increased to 49% (H1 2020: 33%)

    EBITDA margin increased to 49% (H1 2020: 33%) H1 2021 income statement Revenue (FOB) by product (%) H1 2021 H1 2020 H1 2021 H1 2020 US$ million US$ million Concentrates Rutile Rutile Revenue (CIF) 178.2 116.8 Zircon 3% Concentrates 3% 0% 11% 7% Freight costs (10.4) (5.6) Zircon Revenue (FOB) 167.8 1

  23. Slide 23: H1 2021: Unit costs reduced on increased production

    H1 2021: Unit costs reduced on increased production H1 2021 cash operating costs reconciliation1 Unit H1 2021 H1 2020  16% (US$12.1m) increase in adjusted cash operating costs, due primarily to: Cost of sales US$m 100.3 82.7  Increased COVID-19 costs US$2m Other operating costs excluding freight U

  24. Slide 24: H1 2021: Unit costs down 23% on prior half periods

    H1 2021: Unit costs down 23% on prior half periods Unit cost reduction driven by higher product volumes 800kt $200/t 700kt $175/t 42.8 600kt $150/t 500kt $125/t Cost per tonne ($/t) Production (kt) 400kt $100/t 300kt $75/t 200kt $50/t 100kt $25/t 0kt $0/t H1 H2 H1 H2 H1 H2 H1 H2 H1 2017 2018 2019 20

  25. Slide 25: Financially well-resourced

    Financially well-resourced H1 2021 balance sheet review 30-Jun-2021 31-Dec-2020  PPE movement includes additions US$23.6m (H1 US$ million US$ million 2020: US$59.2m), less mine closure adjustment Property, plant & equipment 956.6 961.7 (US$5.2m) & depreciation (US$23.5m) Inventories 69.6 63.7 Trade

  26. Slide 26: Financially robust

    Financially robust Flexible debt and trade facilities in place 30-Jun-2021 31-Dec-2020 US$ million US$ million Interest rate Term Term Loan 110.0 110.0 LIBOR +5.4% March 2025 Revolving Credit Facility 20.0 40.0 LIBOR +5.0% December 2022 Total debt 130.0 150.0 Cash 56.5 87.2 Facilities Summary  Debt

  27. Slide 27: Total cash operating costs

    Total cash operating costs Adjusted cash operating costs breakdown Power Fuel Power Fuel 11% 7% 12% 8% Production Production Repairs & Overheads Overheads Maintenance 17% Repairs & 15% 24% H1 2021 Maintenance H1 2020 Logistics & 22% Travel US$87.3m Logistics & US$75.2m 6% Travel 6% Distribution Othe

  28. Slide 28: Follow Kenmare on social media

    Follow Kenmare on social media Facebook, Twitter and LinkedIn  Kenmare has profiles on Facebook, Twitter and LinkedIn, which feature regular updates on our corporate social responsibility initiatives, operational and development milestones, news flow and more  Click the name of the social network

  29. Slide 29: Contact Us

    Contact Us Jeremy Dibb / Katharine Sutton +353 1 671 0411 ir@kenmareresources.com Jetty at sunset Follow Us