Slide 1: Nicaragua's Next High-Grade Gold Mine
June 2021 NICARAGUA'S NEXT HIGH- GRADE GOLD MINE Investor TSX-V: MKO Presentation OTCQX: MAKOF TSX-V: MKO | OTCQX: MAKOF

Slide 2: Forward-Looking Statements
Forward-Looking Statements This presentation of Mako Mining Corp. (“Mako” or the “Company”) contains certain "forward-looking statements". Forward-looking statements express, as at the date of this presentation, the Company's plans, estimates, forecasts, projections, expectations, or beliefs as to f

Slide 3: Mako's Main Objectives
Mako’s Main Objectives Building the high-grade San Albino gold project is only one of three main objectives 1 Building a 500tpd mine; expected to be one of the highest-grade open pit mines globally 2 Near mine exploration with the goal of doubling production by 2022 3 Regional exploration to prove t

Slide 4: Investment Highlights
Investment Highlights Proven mine builders partnered with a supportive controlling Mako’s San Albino gold project is one of the highest-grade open pit shareholder development projects globally • Experienced operating team that have been involved in building three gold • Located in Nueva Segovia, Nic

Slide 5: Company Summary
Company Summary Management Akiba Leisman CEO (1) Ownership (Fully Diluted) (3) Jesse Muñoz COO Millie Paredes CFO and Corporate Secretary Cesar Gonzalez VP Corporate Development Other 35.9% Capital Structure (as of May 31, 2021) CAD:USD = 1.20 Share price C$0.40 Wexford Capital LP 52-week high-low C

Slide 6: Management
Management Akiba Leisman Jesse Muñoz Millie Paredes Cesar Gonzalez CEO (Director) COO CFO and Corporate Secretary VP Corporate Development Akiba Leisman serves as the CEO and a Jesse Muñoz serves as Chief Operating Maria Milagros “Millie” Paredes serves as Cesar Gonzalez serves as the VP Corporate D

Slide 7: 2019-21 Exploration Press Releases
2019-21 Exploration Press Releases Exploration and infill drilling has resulted in positive results in 2019, 2020 and 2021 (1) • Mar 29, 2021 – Infill Drilling at the Arras Zone at San Albino Intersects 24.02 g/t Gold Over 4.4 Meters (Estimated True Width) 15 Meters from Surface and Outside the Reso

Slide 8: San Albino
TSX-V: MKO OTCQX: MAKOF San Albino TSX-V: MKO | OTCQX: MAKOF

Slide 9: Why Nicaragua?
Why Nicaragua? A burgeoning mining district • Pro-mining government underpinned by • Modern infrastructure (paved roads, water modern mining law and power) • 25-year exploration and exploitation • Repatriation of capital and profits allowed concessions • Limited modern gold exploration • Reasonable

Slide 10: San Albino Gold Project
San Albino Gold Project Compelling Economics High-grade, low-capex, highly scalable project Expected to be one of the highest-grade open pit mines globally • The San Albino gold project is expected to be a high-margin gold mine with a Measured and Indicated mineral resource (open pit) grade of Clear

Slide 11: Mining Statistics
Mining Statistics Mining at San Albino is yielding high-grade results • The first four benches at San Albino have held up well compared to the updated mineral resource estimate model (1) (2) • A total of 13,787 tonnes of diluted vein material has been mined to date from benches 610 to 592 at a dilut

Slide 12: High-Grade Open Pit Mines
High-Grade Open Pit Mines High-grade open pit mining operations are among the lowest cost gold producers Processed Grade – CY2020 Cash Costs – CY2020 Mine (1) Country Owner(s) (g/t Au) (US$) Kyzyl Kazakhstan Polymetal 7.9 $401/oz Ada-Tepe Bulgaria Dundee Precious Metals 4.9 $341/oz Svetloye Russia P

Slide 13: High-Grade Open Pit Comparables
High-Grade Open Pit Comparables Open pit Measured and Indicated resource grade (Au g/t) (1) (2) (3) Construction Production 10.1 9.5 5.7 5.2 4.5 4.1 4.1 3.8 3.7 3.6 3.3 3.2 2.9 2.7 2.4 Kekura San Albino Kyzyl Pavon Segilola Ada-Tepe Boungou Veduga Meliadine Meadowbank Porgera Loulo-Gounkoto Svetloye

Slide 14: Exploration
TSX-V: MKO OTCQX: MAKOF Exploration TSX-V: MKO | OTCQX: MAKOF

Slide 15: Proposed Drilling and Cumulative Meters Drilled
Proposed Drilling 2021E-22E (1) (2) Cumulative Meters of Drilling by Year (1) Proposed drilling San Albino: 34,600 m 120,000 across all targets Las Conchitas: 73,200 m San Albino Other: 23,600 m resource update Drilling 2019-20 (1) (3) 100,000 San Albino: 25,936 m New Las Conchitas: 21,784 m managem

Slide 16: Corona de Oro Gold Belt
Corona de Oro Gold Belt Now… Then (mid-2009)… San Albino Gold Deposit TSX-V: MKO | OTCQX: MAKOF 16

Slide 17: Corona de Oro Gold Belt
Corona de Oro Gold Belt An emerging high-grade gold district TSX-V: MKO | OTCQX: MAKOF 17

Slide 18: Corona de Oro Gold Belt
Corona de Oro Gold Belt An emerging high-grade gold district San Albino gold project Las Conchitas area • PEA study completed in 2015 (2018-19 drilling program) • Initial drilling has confirmed down-dip • Permitting process completed in 2017 continuity of highly mineralized zones • ~15,300 meters in

Slide 19: Las Conchitas
Las Conchitas 3.5 km A highly mineralized area about 3x the size of San Albino • At least eight mineralized zones identified to date • Potential for mineralized zones to connect • Trenching and drilling ongoing of near-surface gold and silver mineralization • Drill program underway to delineate a ma

Slide 20: Historic Mine with Untested Exploration Potential: El Golfo
Historic Mine with Untested Exploration Potential • Roughly 4 km south of the San • Extension of highly mineralized Albino Gold Deposit with a very structures at Las Conchitas to the El Golfo similar style of mineralization immediate north • Area of ~2 sq. km • Initial sampling came back with • Hist

Slide 21: Appendix
TSX-V: MKO OTCQX: MAKOF Production Appendix TSX-V: MKO | OTCQX: MAKOF

Slide 22: Resources
Open Pit (1) (2) 43-101 Classification Cutoff grade Au (g/t) Tonnes Au (g/t) Au (oz) Ag (g/t) Ag (oz) Resources (1) Measured Indicated Fully Diluted* Fully Diluted* 114,700 196,200 11.78 8.25 43,400 52,000 17.5 15.6 64,700 98,500 Measured and Indicated Fully Diluted* 310,900 9.54 95,400 16.3 163,200

Slide 23: Thank You
Thank You Contact 595 Burrard Street Suite 2833 Vancouver, British Columbia Canada V7X 1K8 IR: (647) 203-8793 General: (604) 646-1580 IR: dhonig@makominingcorp.com General: info@makominingcorp.com www.makominingcorp.com TSX-V: MKO | OTCQX: MAKOF 23
Source: Internet Archive copy of makominingcorp.com
More decks from Mako Mining Corp.
Investor Presentation (November 2026)49 slides · November 2026
Investor Presentation (September 2026)48 slides · September 2026
Investor Presentation (February 2026)51 slides · February 2026
Merger or Acquisition (October 2025)13 slides · October 2025
Investor Presentation (March 2025)48 slides · March 2025
Investor Presentation (September 2024)45 slides · September 2024