Mako Mining Corp. · TSXV:MKO
Mako Mining — Investor Presentation (March 2025)
48 slides from Mako Mining's investor presentation, March 2025

Slide 1: Profitable and Scalable Gold Production in the Americas
Profitable and Scalable Gold Production in the Americas Corporate Presentation | March 2025 Moss Mine, AZ US TSX-V: MKO | OTCQX: MAKOF Eagle Mountain Project, Guyana San Albino Mine, Nicaragua

Slide 2: Forward Looking Information
Forward Looking Information This document contains “forward-looking information” and “financial outlook” within the meaning of geologically to have the economic considerations applied to them that would enable them to be applicable Canadian securities laws. Statements containing forward-looking info

Slide 3: Focused on Profitability with Mineral Resource and Production Growth
Focused on Profitability with Mineral Resource and Production Growth Legend 2026–2027 (1) • San Albino • Eagle Mountain 2025 (1) Ramp up to 3 • Moss Mine producing mines Underground & 2024 Advance Engineering ➢ Evaluate expansion potential to 1,000tpd Eagle Mountain 2023 Acquired Assets ➢ Receive en

Slide 4: Investment Highlights
Investment Highlights(1) Experienced & Highly-Qualified Profitable Cash-generating Expected High Return Project Untapped Geological Management & Operating Team Assets with Potential to Expand Under Development (3) Potential ➢ Proven mine builders and ➢ Self-funded organic growth ➢ Eagle Mountain Pro

Slide 5: Mako's Capital Structure
Mako’s Capital Structure Stock Performance Share Price C$ 3.98 Mako Completed Acquisition of Moss Mine (March 26th, 2025) 52-week high-low C$ 2.34 – 4.19 Moss Mine Acquisition LOI (Dec 31st, 2024) Shares Outstanding (1) 78.9M Mako Completed Acquisition of Goldsource Market Cap. (2) US$ 219M (July 3r

Slide 6: Experienced and Highly-Qualified Management and Operating Team
Experienced and Highly-Qualified Management and Operating Team 6

Slide 7: Management Team
Management Team Akiba Leisman Frank Powell CEO (Director) VP of Exploration Akiba was Executive Chairman and Interim CEO of Marlin Gold Mining Ltd., Frank Powell has over 39 years of exploration experience with both major leading the company through the spinout of Sailfish Royalty Corp. and the and

Slide 8: Board of Directors
Board of Directors Eric Fier Mario Caron John Pontius Non- Executive Chairman Director Director Mr. Fier is a Certified Professional Geologist and Engineer with over 30 Mr. Mario Caron is a mining executive with over 40 years of wide- John Pontius is a Director at Capital Alignment Partners, a credi

Slide 9: Mako's Value Generation Trajectory Under New Management
Mako’s Value Generation Trajectory Under New Management Selected Drilling Results in the past 15 months (For full details see Press Releases on www.makominingcorp.com) Milestones under new Management (since August 2019) Oct 16, 2024: 22.88 g/t Au over 4.6m ✓ Mine construction in the midst of COVID p

Slide 10: San Albino Mine in Nicaragua: Cash-Generating Operation with Potential to Expand
San Albino Mine in Nicaragua: Cash-Generating Operation with Potential to Expand 10

Slide 11: Nicaragua: A Burgeoning Mining Jurisdiction
Nicaragua: A Burgeoning Mining Jurisdiction Nicaragua Highlights Top 3 foreign-owned operating gold mines(2) ➢ Pro-mining government underpinned by modern mining law 1 Calibre (CXB): El Limon Mine: 102 Koz Au @5.15 g/t Probable Mineral Reserves and 1.1M ➢ Gold is the largest export (accounts for 35%

Slide 12: San Albino Gold Mine
San Albino Gold Mine (1) Historic Mine District Production Growth Potential ➢ Mining began in the district in the late 18th century ➢ Last commercial operation was in 1926 ➢ Profitably operating at +550tpd ➢ Mine shut down due to the onset of the Nicaraguan Civil ➢ US$89.8M in Revenues in TTM War (1

Slide 13: Production Summary 2024
Production Summary 2024 Units 2024 Units 2024 Mined Milled Diluted Vein Tonnes t 208,267 Tonnes t 81,339 Gold Grade g/t 7.22 Gold Grade g/t 13.54 Silver Grade g/t 8.36 Silver Grade g/t 14.47 Contained Gold oz 48,331 Contained Gold oz 35,416 Contained Silver oz 55,956 Contained Silver oz 37,843 Mill

Slide 14: Cash Generation
Cash Generation Cash Reconciliation TTM (Q4 2023 - Q3 2024) ➢ Generated US$46.6M of Mine Operating Cash Flows (“Mine OCF”) (1) (2) with a realized gold price of US$ 2,188/oz Au ➢ Invested US$4.5M in exploration program with funds generated from operations ➢ Quickly repaying debt, resume NCIB program

Slide 15: Financial Summary
Financial Summary For TTM (Q42023 - Q32024) Highlights TTM ➢ US$ 89.8 million in Revenue ➢ US$ 43.4 million in Adjusted EBITDA (1) Cash Costs ($/oz sold) (1) $881 ➢ US$ 881 Cash Costs ($/oz sold) (2) AISC ($/oz sold) (1) $1,196 ➢ US$1,196 All-In Sustaining Costs (“AISC”) ($/oz sold) (1) Revenues (in

Slide 16: Moss Mine: Producing Mine in Attractive Jurisdiction
Moss Mine: Producing Mine in Attractive Jurisdiction 16

Slide 17: Arizona: Top Tier Jurisdiction in the US
Arizona: Top Tier Jurisdiction in the US Highlights ➢ Top 10 jurisdiction in the world for investment in the last 5 years (1) ➢ Active district with an operating mine and multiple active exploration programs ➢ Favorable policy environment and taxation ➢ Excellent infrastructure and easily accessible

Slide 18: Moss Mine
Moss Mine Asset Overview Producing asset generating cash flow (1) ➢ Commercial production in Sept 2018 with 203 k oz Au Eq. produced to date; 12.8 k oz Au Eq. produced in H1 2024 ➢ 107K oz Au @ 0.40 g/t measured mineral resources, 382K oz Au @ 0.39 g/t indicated mineral resources (inclusive of 184K

Slide 19: Moss Mine
Moss Mine Property Overview (1) Heap Leach Gold Production ➢ Contract mining/crushing ➢ 3-stage crush, capacity of 10,400 tons per day ➢ New 3A-Ph2 leach pad (US$9.5M) Existing site infrastructure ➢ 100% water secured. In 2022, two production water wells constructed, enhancing on-site water producti

Slide 20: Moss Mine
Moss Mine Operating Results last 5 years 2023 2022 2021 2020 2019 Total 5 years Production Stats Total Mineral Mined tonnes 8,057,304 8,449,785 8,434,837 7,655,031 6,142,598 38,739,555 Waste tonnes 5,310,084 5,486,747 5,624,800 5,217,216 4,218,222 25,857,069 Ore Mined tonnes 2,747,220 2,963,038 2,81

Slide 21: Eagle Mountain Gold Project: Resource Scale with Phased Development Plan
Eagle Mountain Gold Project: Resource Scale with Phased Development Plan 21

Slide 22: Guyana: The Next Great Mining Jurisdiction
Guyana: The Next Great Mining Jurisdiction Guyana Highlights ➢ Mining-friendly permitting process Eagle Mountain Project ➢ Emerging as one of the most attractive South American mining 5 3 1 jurisdictions (1) 2 ➢ Government support for mining combined with a favorable permitting regime enables tangib

Slide 23: Eagle Mountain: PEA-Stage Development Project
Eagle Mountain: PEA-Stage Development Project Phased Development Plan to Scale Into Capex and Execution (1) PEA - Robust Project Economics(1)(2) US$292M After-tax NPV5% & 57% IRR at US$ 1,850/oz gold Large Gold Mineral Resource Near-term Production ~1.2Moz Au Indicated @1.18 g/t Au and Expected Prod

Slide 24: Eagle Mountain Asset Overview
Eagle Mountain Asset Overview ➢ Distinctly shallow. 75% of Indicated Mineral Resource within 50 m of surface ➢ Soft-rock saprolite (35% of Indicated Mineral Resource) opportunities for phased development and lower capex intensity ➢ Low capex intensity, shallow mineralization and phased development p

Slide 25: PEA – Life of Mine Profile
PEA – Life of Mine Profile (1) Projected Annual Cash Flow and Production Profiles Phase 1 - Saprolite Mill Phase 1 - Saprolite Mill Phase 2 - Fresh Rock/Trans + Saprolite Blend Feed Phase 2 - Fresh Rock/Trans + Saprolite Blend Feed 250.0 600 120,000 2,000 Cumulative After-Tax Free Cash Flow (US$ M)

Slide 26: Projected Timeline for Eagle Mountain Gold Project
Projected Timeline for Eagle Mountain Gold Project Phased development plan to drive staged permitting and engineering activities 2011 - 2022 2023 2024-2025 (1)(2) 2025-2027 (1)(2) Discovery Hole to Exploration Engineering Permitting Project Development Exploration Resource Outline Studies Financing*

Slide 27: Untapped Geological Potential
Untapped Geological Potential 27

Slide 28: Corona de Oro Gold Belt
Corona de Oro Gold Belt Orogenic - Unique in Nicaragua Mako’s San Albino Land Package Characteristics 188 km2 ➢ Formed during mountain building processes, typically in metamorphic rocks. ➢ San Albino is the only known gold deposit in Nicaragua hosted in metamorphic rocks. ➢ 5-10 km wide belt with st

Slide 29: San Albino – Las Conchitas
San Albino – Las Conchitas San Albino Projected Long Section Deposit Grade Shells (1) All Surface Samples Au g/t Pits Au g/t Number of Samples 1.0 – 10.0 Individual >10.0 Pit Outline(1) <.001 - 1.0 3,457 1.0 – 10.0 602 Ultimate Pit >10.0 261 Outline (2) San Albino Deposit Las Las Conchitas Deposit C

Slide 30: San Albino – Las Conchitas
San Albino – Las Conchitas San Albino Projected Long Section Deposit Southwest Pit West Pit Projected Long Section San Pablo Pit Las Conchitas Deposit Las Conchitas South - Bayacun – El Limon 1) Grade shells and pit outlines are based on current mineral resource estimate in the San Albino Technical

Slide 31: Corona de Oro Gold Belt: Projected Long Section with Select Drill Results
Corona de Oro Gold Belt (1) Projected Long Section with Select Drill Results San Albino Deposit Las Conchitas Deposit El Golfo Area AZ 180 AZ 210 0.9m @ 51.8 g/t Au 1.4m @ 3.0 g/t Au 1.5m @ 21.8 g/t Au 1.7m @ 36.6 g/t Au 3.1m @ 60.7 g/t Au 1.9m @ 25.2 g/t Au 1.0m @ 15.1 g/t Au 6.0m @ 4.13 g/t Au inc

Slide 32: Eagle Mtn Project Geology
Eagle Mtn Project Geology Prominent NE and NS Structural Trends Eagle Mountain Deposit ➢ Series of tabular, shallow, dip-slope shear zones developed within a granodioritic host rock. Covers an area of ~ 2.5 km by 1.5 km ➢ At least three discrete zones of alteration and mineralization. Zone 1 is shal

Slide 33: Moss Mine Regional Exploration Potential
Moss Mine Regional Exploration Potential (1) 1) Please refer to “Forward Looking Information” on slide 2 TSX-V: MKO | OTCQX: MAKOF CORPORATE PRESENTATION 33

Slide 34: Moss Mine Regional Exploration Potential
Moss Mine Regional Exploration Potential (1) 1) Please refer to “Forward Looking Information” on slide 2 TSX-V: MKO | OTCQX: MAKOF CORPORATE PRESENTATION 34

Slide 35: Value Generation and Catalysts
Value Generation and Catalysts (1) Value Generating Opportunities 2025 - 2027 Catalysts Mine construction in the midst of COVID pandemic 1 Expand LOM at San Albino Construction completed with commercial production declared effective July 1, 2021 (announced July 13, 2021) 2 Resume Operations Moss Qui

Slide 36: Appendix
Appendix 36

Slide 37: San Albino Mineral Resource Estimate
San Albino Mineral Resource Estimate (1) All veins in San Albino Deposit: Open Pit, Underground, All veins in Las Conchitas Deposit: Open Pit, Underground, All veins in San Albino Project: Open Pit, Underground, and Dump Resources and Dump Resources and Dump Resources Open Pit and Underground and Du

Slide 38: Las Conchitas - Resource Estimate
Las Conchitas - Resource Estimate (1) All Veins in Las Conchitas Deposit: Open Pit Resources Open Pit Dumps, all Inferred All Indicated MD Tonnes MD g Au/t Oz Au BD g Ag/t Oz Ag Cutoff Tonnes MD g Au/t Oz Au g Ag/t Oz Ag 1.0 8,300 2.39 600 3.7 1,000 1.5 295,700 10.83 103,000 12.7 121,100 Note: BD is

Slide 39: Corona de Oro Gold Belt: Projected Long Section with Drill Results
Corona de Oro Gold Belt Projected Long Section with Drill Results Q4 2023 West Pit San Pablo Pit LC22-524 0.9m @ 51.8 g/t Au LC19-72 SA19-155 1.4m @ 3.0 g/t Au AR11-24 SP18-03 Tunnel Mina Francisco INT18-19 LC20-181 EJ15-TR-03 1.5m @ 21.8 g/t Au AR12-65 CG18-24 1.7m @ 36.6 g/t Au 3.1m @ 60.7 g/t Au

Slide 40: Corona de Oro Gold Belt: Pipeline of projects
Corona de Oro Gold Belt Pipeline of projects to support continuous exploration The Company has the unique opportunity to generate and advance new projects organically on its wholly owned,188 km2 land package and is aggressively advancing projects through the pipeline Advanced Stage/In Production La

Slide 41: PEA - Phased Development Plan
PEA - Phased Development Plan (1) Shallow Open Pits & Conventional Processing Plant Phase 1 – Saprolite-Only Mineralization (4.5 yrs) ➢ 5,000 tpd of saprolite at cut-off grade of 0.3 g/t ➢ Estimated Avg annual gold production of ~68 oz/year for 4.5 yrs ➢ Anticipated Development capex of US$95.6M wit

Slide 42: Widespread Gold Mineralization
Widespread Gold Mineralization Regionally and at Eagle Mountain Zion N Eagle Mountain TSX-V: MKO | OTCQX: MAKOF CORPORATE PRESENTATION 42

Slide 43: MRE April 2022 Sensitivity Analysis (Au Price)
MRE April 2022 (1) Sensitivity Analysis (Au Price) Pit Constrained MRE $1,600/oz Au Price Looking North ➢ View Point ➢ Plunge: -6o ➢ Azimuth: 008o Eagle Mountain Salbora Toucan-Powis Pit Constrained MRE $1,800/oz Au Price 1) See the Eagle Mountain Technical Report available under Mako’s profile at w

Slide 44: Mahdia Valley Salbora Minnehaha
St Elizabeth Mahdia – St. Elizabeth Paleochannel (north of Eagle Mtn) Mahdia Valley Eagle Mtn Breakfast Creek and Konawaruk River Salbora Eagle Mountain Mahdia – Tiger Creek Paleochannel Deposit (northeast of Eagle Mtn) Minnehaha River Wineaperu Mowasi Minnehaha Creek Mahdia – Tiger Creek Mine (nort

Slide 45: Appendix - Disclaimer
Appendix - Disclaimer Non-IFRS Financial Measures Mako discloses certain non-IFRS financial measures and ratios in this presentation, such as EBITDA (IFRS: operating income), Adjusted EBITDA (IFRS: operating income), cash cost per ounce sold (IFRS: cost of sales), Development Capex (IFRS: Cash Flow

Slide 46: Appendix - Disclaimer
Appendix - Disclaimer “Mine OCF” represents operating cash flow, excluding Nicaraguan taxes and royalties, changes in non-cash working capital and exploration expenses. A reconciliation of Mine OCF to net cash from operating activities is shown in the table below. Mine OCF Calculation Q3 2024 Net ca

Slide 47: Appendix - Disclaimer: Scientific and Technical Information
Appendix - Disclaimer Scientific and Technical Information All scientific and technical information relating to the San Albino Project contained in this presentation is derived from the technical report with an effective date of October 11th, 2023, as amended on June 10th, 2024 and titled “Amended T

Slide 48: Thank You
Thank You Contact Suite 700 - 838 West Hastings St. Vancouver, BC - V6C 0A6 IR: (511) 944-951401 IR: pdurand@makominingcorp.com General: info@makominingcorp.com makominingcorp.com
Source: Internet Archive copy of makominingcorp.com
More decks from Mako Mining Corp.
Investor Presentation (November 2026)49 slides · November 2026
Investor Presentation (September 2026)48 slides · September 2026
Investor Presentation (February 2026)51 slides · February 2026
Merger or Acquisition (October 2025)13 slides · October 2025
Investor Presentation (September 2024)45 slides · September 2024
Merger or Acquisition (June 2024)35 slides · June 2024