Kalamazoo Resources Ltd. · ASX:KZR

Kalamazoo Resources — Virtual Gold Conference 2020

18 slides from Kalamazoo Resources's conference presentation, Aug 20, 2020

  1. Slide 1: Virtual Gold Conference Presentation

    For personal use only Virtual Gold Conference Presentation 20 t h August 2020 ASX: KZR Wo r l d C l a s s V i c to r i a n a n d Pilbara Gold Projects

  2. Slide 2: Forward looking statements

    Forward looking statements Investment Presentation Competent Persons Statement This Investment Presentation (IP) is not a disclosure document under Chapter 6D of the The information in this report that relates to Exploration Results for The Sisters, Marble Corporations Act nor an offer to subscribe

  3. Slide 3: The Kalamazoo story

    The Kalamazoo story For personal use only Australian gold explorer with major assets in two of the most sought after gold provinces in the world Ashburton and Pilbara ▪ Ashburton Gold Project – acquired from Northern Star in June 20201 ➢ JORC Code (2012) Resource of 20.8Mt @ 2.5g/t Au for 1.65Moz ➢

  4. Slide 4: Corporate overview

    Corporate overview Substantial Shareholders Capital Structure For personal use only Doux Argent Pty Ltd Shares 130,341,434 30.0% Beatons Creek Gold (Novo Resources) Unlisted options 42,000,000 52.1% 2176423 Ontario Ltd (Eric Sprott) $97.8 m Market Cap (at $0.75) HSBC Nominees Cash 1, 2 $12.2 m 7.7%

  5. Slide 5: Gold Project – the right location

    Ashburton Gold Project – the right location For personal use only 5

  6. Slide 6: Gold Project acquisition

    Ashburton Gold Project acquisition For personal use only ▪ Ashburton Gold Project’s 1.65Moz doesn’t within Northern Star’s Tier 1 operations ▪ Acquisition terms provide for “win-win” ▪ Kalamazoo pays Northern Star: ➢ $5M on mining the first 250,000 tonnes of Ore ➢ 2% Net Smelter Royalty on the first

  7. Slide 7: Gold Project: Mineral Resource

    Ashburton Gold Project: Mineral Resource ▪ Past production of ~350,000oz @ 3.3g/t Au in 1998-2004 by Sipa Resources For personal use only ▪ Current Mineral Resource JORC Code (2012) to 20.8Mt @ 2.5g/t for 1.65M oz Au 7

  8. Slide 8: Gold Project: previous mining

    Ashburton Gold Project: previous mining For personal use only Waugh Zeus Mt Olympus 8

  9. Slide 9: Gold Project: Mt Olympus Deposit

    Ashburton Gold Project: Mt Olympus Deposit ▪ Mineral Resource JORC Code (2012) of 15.2Mt @ 2.2g/t for 1,080,000 oz Au For personal use only 76m @ 3.4g/t Au AMORC0041 (142m) 1 56m @ 4.2g/t Au AMORC0039 (182m) 22m @ 5.3g/t Au AMORC0021 (140m) 20m @ 7.2g/t Au AMODD0023 (236m) 48m @ 6.0g/t Au AMODD0023

  10. Slide 10: Gold Project: Peake Deposit

    Ashburton Gold Project: Peake Deposit ▪ Mineral Resource JORC Code (2012) of 3.7Mt @ 3.4g/t for 399,000 oz Au For personal use only 10m @ 4.9g/t Au APKRC0033 (131m) 1 11m @ 3.3g/t Au APKRC0036 (201m) 11m @ 5.2g/t Au PARC0006 (122m) 8m @ 6.5g/t Au PARC0010 (106m) 8m @ 5.3g/t Au PARC0019 (48m) 1. ASX:

  11. Slide 11: Exploration/development strategy

    Ashburton exploration/development strategy For personal use only ▪ Excellent infrastructure ▪ Review and acquisition of exploration data sets ▪ Surface exploration programs ▪ Conduct major drilling campaigns with aim of substantially increasing the 1.65Moz Au resource Extensive drill core farm obtai

  12. Slide 12: Sisters adds to Pilbara assets

    Ashburton adds to Pilbara assets ▪ Sisters Project along same shear zone as De Grey’s world class Hemi discovery1 For personal use only ▪ Ultrafine+TM soil sampling & airborne surveys completed – planned drilling Q4, 2020 ▪ Prospective Marble Bar Project (adjacent to Warrawoona Project) and DOM’s Hi

  13. Slide 13: Victorian Goldfields: world class district

    Victorian Goldfields: world class district For personal use only ▪ Bendigo Zone in Victoria produced 60M+ oz Au1 at a grade ~ 15g/t Au2 ▪ Fosterville has re-focused activity and global attention on Victoria3 ▪ Kalamazoo has the right locations to find the next World-Class deposit ▪ Limited modern ex

  14. Slide 14: Victorian Goldfields: maiden drill program

    Victorian Goldfields: maiden drill program ▪ Multiple CSIRO Collaboration Studies For personal use only ▪ IP and Ground Magnetic Surveys with 3D structural geology modelling for targeting ▪ Maiden drill program March 2020 with high grade intersections (e.g. 1.42m@ 261g/t Au)1 ▪ Numerous targets to b

  15. Slide 15: Victorian Goldfields: strategy

    Victorian Goldfields: strategy For personal use only ▪ Kalamazoo: high-grade (>10g/t Au), large resource strategy (1Moz+ Au) ▪ Similar age and geology to other Victorian goldfields1 ▪ Outcropping geology and gold mineralisation ▪ Brownfield walk-up drill targets at: ➢ Castlemaine Gold Project (5.6Mo

  16. Slide 16: Victorian Goldfields: Land Release blocks surrounding Fosterville Gold Mine

    Victorian Goldfields: Land Release For personal use only ▪ 4 blocks surrounding Fosterville Gold Mine ▪ Highly prospective exploration tenure ▪ Evaluation Criteria: Minerals Exploration Strategy 5% Exploration Capability & Financial Viability 20% Fosterville Mine Minerals Exploration Model 5% Propos

  17. Slide 17: Why invest in Kalamazoo?

    Why invest in Kalamazoo? For personal use only ▪ Major assets in two of the most highly rated gold provinces in the world today ▪ Strategy to expand and progress development options for Ashburton’s 1.65Moz Au ▪ Searching for the next Victorian world-class discovery utilising latest technologies ▪ Er

  18. Slide 18: Kalamazoo Resources Ltd

    Kalamazoo Resources Ltd ACN: 150 026 850 For personal use only ASX: KZR www.kzr.com.au Luke Reinehr, Chairman / CEO Head Office: Unit 3, 328 Reserve Road Cheltenham 3192, Victoria Phone: +61 3 9988 9007 Email: luke.reinehr@kzr.com.au Paul Adams, Director Perth Office: Suite 7, 8 Clive Street West Pe

Kalamazoo Resources — Virtual Gold Conference 2020 on 6ix