Tasman Resources Ltd · ASX:TAS

Tasman Resources — Shareholder Meeting (November 2014)

32 slides from Tasman Resources's shareholder meeting presentation, Nov 27, 2014

  1. Slide 1: AGM Presentation

    For personal use only AGM Presentation 27th November 2014 Greg Solomon Chairman 1

  2. Slide 2: Tasman Project Locations

    Tasman Project Locations For personal use only Lake Torrens (1633 km2) IOCGU Parkinson Dam (194 km2) Epithermal Au, Ag, Zn, Pb Lucas Hill (264 km2) IOCGU Central Gawler (152 km2) Au (to be surrendered) Mt Boothby (764 km2) Au, Mo (to be surrendered) 2

  3. Slide 3: Investment in Eden Energy Ltd (ASX:EDE)

    Investment in Eden Energy Ltd (ASX:EDE) For personal use only • Tasman holds 349 million shares (46%) of the issued capital of Eden • Market value of Eden Shareholding- $5.2 million* • Current Market Capital of Tasman- $4.5 million* • Tasman cash at bank -$800,000 * * As at 26 November 2014 3

  4. Slide 4: Lake Torrens IOCGU

    For personal use only Lake Torrens IOCGU Including Vulcan prospect 4

  5. Slide 5: Lake Torrens Project

    Lake Torrens Project Regional gravity residual (& IOCGU deposits/prospects) For personal use only EL 4322 5

  6. Slide 6: Vulcan IOCGU Project

    Vulcan IOCGU Project Residual gravity image & drilling and priority targets For personal use only Footprint of Carrapateena deposit at same scale Footprint of Carrapateena deposit at same scale 6

  7. Slide 7: Vulcan IOCGU Project - Summary

    Vulcan IOCGU Project - Summary For personal use only • Very large hematite-dominant IOCGU system (~ 12km2) 30km north of Olympic Dam • Hosted by gneisses, granites and metasediments (~1,750my) • 17 holes drilled: – Thick & strong alteration, inc.100’s metres of hematite breccias; intense hematite, s

  8. Slide 8: Vulcan IOCGU: Historical Details

    Vulcan IOCGU: Historical Details For personal use only • 1981 WMC drills first hole – SHD 1 off target • 2009 Tasman drills VUD 1 at north – hits Vulcan IOCGU system • 2010 to 2011 Gravity, modelling, 7 further holes • 2012 Tasman – Rio Tinto Farm In/JV – Rio Tinto supplied $10 million to Tasman – T

  9. Slide 9: Vulcan: Selected Results (down hole)

    Vulcan: Selected Results (down hole) For personal use only • VUD 3 56.7m at 0.59% Cu and 0.17g/t Au, from 874.20m inc. - 0.34m at 5.85% Cu and 2.23g/t Au from 895.08m, and - 0.65m at 7.80% Cu and 2.41g/t Au from 930.20m • VUD 11 137.0m at 0.14% Cu, 0.18g/t Au and 0.08kg/t U3O8, from 1027m • VUD 12 5

  10. Slide 10: Vulcan VUD 15: Thick, mineralised hematite breccias

    Vulcan VUD 15: Thick, mineralised hematite breccias For personal use only 10

  11. Slide 11: Vulcan VUD: Mineralised hematite breccias

    Vulcan VUD 15 Mineralised hematite breccias For personal use only 11

  12. Slide 12: Vulcan VUD 15: Hematite replacement textures

    Vulcan VUD 15: Hematite replacement textures For personal use only 12

  13. Slide 13: Vulcan VUD 15: Remobilised IOCGU mineralisation

    Vulcan VUD 15: Remobilised IOCGU mineralisation For personal use only 13

  14. Slide 14: Vulcan: Close up - chalcopyrite with carbonate & hematite

    Vulcan: Close up - chalcopyrite with carbonate & hematite For personal use only 14

  15. Slide 15: Vulcan: Close up - early stage pyrite with later chalcopyrite

    Vulcan: Close up - early stage pyrite with later chalcopyrite For personal use only 15

  16. Slide 16: Vulcan: Other elements of interest

    Vulcan: Other elements of interest For personal use only • Palladium: – 137m at 130ppb Pd, inc. 20m at 280ppb Pd (VUD 11) – Max. value 3,000ppb Pd (VUD 7) • Molybdenum: – 11m at 0.09% Mo, max. value 0.41% Mo (VUD 3) • Iron: – 240m at 61% (hematite, VUD 9) – 186m at 60% (hematite, VUD 15) • Rare Eart

  17. Slide 17: Vulcan: Density (SG) vs Fe (%)

    Vulcan: Density (SG) vs Fe (%) For personal use only 60% Fe 6.0 VUD7 5.5 VUD9 VUD11 VUD12 5.0 VUD15 4.5 4.0 3.5 3.0 2.5 0 10 20 30 40 50 60 70 17

  18. Slide 18: Vulcan: Drilling - sludge handling

    Vulcan: Drilling - sludge handling For personal use only 18

  19. Slide 19: Vulcan: Drilling - sludge handling

    Vulcan: Drilling - sludge handling For personal use only 19

  20. Slide 20: Parkinson Dam: Epithermal Gold, Silver, Lead and Zinc

    Parkinson Dam For personal use only Epithermal Gold, Silver, Lead and Zinc 20

  21. Slide 21: Parkinson Dam: Overview

    Parkinson Dam: Overview For personal use only • New epithermal Gold-Silver (Lead-Zinc) discovery by Tasman Resources in 2005 • Outcropping, “classic” epithermal mineralisation • Best Intersection: 21m at 21g/t Au, 83g/t Ag • Recent insights have led to a new target area being identified to the south

  22. Slide 22: Parkinson Dam: Regional setting

    Parkinson Dam: Regional setting For personal use only 22

  23. Slide 23: Parkinson Dam: New target

    Parkinson Dam: New target For personal use only 23

  24. Slide 24: Parkinson Dam: New Soil Partial Leach Geochemistry

    Parkinson Dam: New Soil Partial Leach Geochemistry For personal use only Silver (Ag) Gold (Au) 24

  25. Slide 25: Parkinson Dam: Previously discovered high grade gold & silver

    Parkinson Dam: Previously discovered high grade gold & silver For personal use only • PD 63: 21m @ 21g/t Au, 83g/t Ag (inc 9m @ 31g/t Au, 152 g/t Ag) • Classic epithermal veining • Gold (electrum ~ 35% Ag) • PD 64: 3m @ 18.1% Pb, 1.1% Zn, 44.2g/t Ag • Mineralisation over > 2 km2 25

  26. Slide 26: Parkinson Dam: Cross section of initial drilling (Gold)

    Parkinson Dam: Cross section of initial drilling (Gold) For personal use only 26

  27. Slide 27: Parkinson Dam: Cross section of initial drilling (Lead & Zinc)

    Parkinson Dam: Cross section of initial drilling (Lead & Zinc) For personal use only 27

  28. Slide 28: Parkinson Dam: Epithermal crustiform-colloform layered quartz veining

    Parkinson Dam: Epithermal crustiform-colloform layered quartz veining For personal use only

  29. Slide 29: Parkinson Dam: Cut & polished samples of colloform-crustiform quartz

    Parkinson Dam Cut & polished samples of colloform-crustiform quartz For personal use only

  30. Slide 30: Parkinson Dam: Free gold (electrum) with quartz and hematite

    Parkinson Dam: Free gold (electrum) with quartz and hematite For personal use only

  31. Slide 31: Disclaimer

    Disclaimer For personal use only The interpretations and conclusions reached in this presentation are based on current geological theory and the best evidence available to the authors at the time of writing. It is the nature of all scientific conclusions that they are founded on an assessment of pro

  32. Slide 32: Competent Person's Statement

    Competent Person’s Statement For personal use only The information in this presentation that relates to Exploration Results is based on and fairly represents information compiled by Robert N. Smith and Michael J. Glasson, Competent Persons who are members of the Australian Institute of Geoscientists

Tasman Resources — Shareholder Meeting (November 2014) on 6ix