Strickland Metals Ltd · ASX:STK

Strickland Metals — Precious Metals Summit Zurich 2025

28 slides from Strickland Metals's conference presentation, Nov 10, 2025

  1. Slide 1: Growing Rogozna Into A Tier One Gold Project

    For personal use only Growing Rogozna Into A Tier One Gold Project Precious Metals Summit Zurich November 2025 ASX Code: STK

  2. Slide 2: Disclaimer

    Disclaimer The information contained in the Presentation (Information) is a summary only and should be read in conjunction with any oral briefing and all other documents provided to you by the Strickland Metals Limited (Company). The Information is current as at the date of its release and the Compa

  3. Slide 3: Strickland Key Highlights

    For personal use only Strickland Key Highlights 3

  4. Slide 4: Corporate Overview

    Corporate Overview Board Capital Structure (as of 7 Nov 2025 unless otherwise stated) For personal use only Anthony McClure Non-Executive Chairman Shares on issue 2,262,359,797 Performance rights (20c, 30c, 50c)1 99,300,000 Paul L’Herpiniere Managing Director Options (13.5c) 50,000,000 Richard Pugh

  5. Slide 5: Strickland Metals – A Rare Opportunity

    Strickland Metals – A Rare Opportunity Significant scale: 100%-owned 7.4Moz AuEq1 Resource ASX/TSX Listed Gold Development Projects* For personal use only with potential to unlock additional Resource through 14 TSX 50,000m drilling programme in CY25. ASX 12 Contained Metal (AuEq Moz)* Favourable ben

  6. Slide 6: Rogozna Overview

    For personal use only Rogozna Overview 6

  7. Slide 7: Rogozna – In the Land of Giants

    Rogozna – In the Land of Giants Highly prospective geology For personal use only Western Tethyan Belt with multiple giant porphyry-related deposits. Major miners active in-country Zijin, Rio Tinto, BHP and Dundee Precious Metals. Mining in Serbia 2.7% of GDP, strategy to increase to 10%. Europe’s 2n

  8. Slide 8: Rogozna Overview

    Rogozna Overview A massive magmatic mineral system with ~184 km2 of tenure and extensive exploration pipeline with >20 For personal use only targets. Four skarn-hosted gold + base metal deposits defined by >120km of drilling. 199Mt @ 1.2g/t AuEq for 7.4Moz AuEq Inferred Resources1 for three of the f

  9. Slide 9: Shanac Deposit – 5.3Moz AuEq and Growing

    Shanac Deposit – 5.3Moz AuEq and Growing 150Mt @ 1.1g/t AuEq for 5.30Moz AuEq JORC 2012 Inferred Resources1 For personal use only • Includes 32Mt @ 1.8g/t AuEq for 1.85Moz AuEq (>1.2g/t AuEq cut-off grade). 2025 Drilling Highlights2 • 133.8m @ 1.5g/t Au from 270.8m (ZRSD25205), incl. 42.9m @ 2.5g/t

  10. Slide 10: Shanac Deposit – 5.3Moz AuEq and Growing

    Shanac Deposit – 5.3Moz AuEq and Growing For personal use only Shanac cross section view, looking north Shanac long section view, looking west 10

  11. Slide 11: Gradina Deposit – High Grade, Gold-Dominant System

    Gradina Deposit – High Grade, Gold-Dominant System 2025 Drilling Highlights1 • 62.7m @ 3.5g/t Au from 386.0m incl. 27.8m @ For personal use only 6.3g/t Au from 388.0m (ZRSD25182). • 19.6m @ 7.0g/t Au from 377.0m (ZRSD25190). • 39.9m @ 4.2g/t Au from 539.6m (ZRSD25208), incl. 12.0m @ 8.2g/t Au from 5

  12. Slide 12: Gradina Deposit – Multiple High-Grade Gold Lodes

    Gradina Deposit – Multiple High-Grade Gold Lodes Drill-defined over ~1km strike, open in all directions with maiden MRE targeted for late-2025. For personal use only Gradina North cross section view looking north Gradina long section view looking SW 12

  13. Slide 13: Medenovac Deposit – Structurally Controlled High Grade Core

    Medenovac Deposit – Structurally Controlled High Grade Core 21Mt @ 1.9g/t AuEq for 1.28Moz AuEq JORC 2012 For personal use only Inferred Resources1 . • 6,800 AuEq OPVM over 150m vertical extent. • Constrained by sub-level cave stopes @ $2,250/oz. • Mineralisation remains open to the north and at dep

  14. Slide 14: Kotlovi Prospect – An Emerging Discovery

    Kotlovi Prospect – An Emerging Discovery Significant new discovery with scale potential just For personal use only 350m west of Medenovac. • 277.3m @ 1.3g/t AuEq from 337.4m (ZRSD25189)1, incl. • 163.0m @ 1.4g/t Au from 337.4m, incl. • 33.5m @ 2.9g/t Au from 339.4m, and • 2.0m @ 15.3g/t Au from 370.

  15. Slide 15: Copper Canyon Deposit – Outcropping Copper-Gold

    Copper Canyon Deposit – Outcropping Copper-Gold 28Mt @ 0.9g/t AuEq for 0.81Moz Au Eq JORC For personal use only 2012 Inferred Resources1 • Constrained by open-pit shell @ $US 2000/oz, 0.4g/t AuEq cut-off, 2.2:1 strip ratio. • Upper zone of Cu-Au mineralisation up to 150m thick, 0.5g/t Au and 0.5% Cu

  16. Slide 16: Exploration Upside

    Exploration Upside Skarn systems the scale of Rogozna often For personal use only have a mineralised porphyry in proximity. Porphyry-related alteration and mineralisation confirmed at Jezerska Reka1: • 493.0m @ 0.1g/t Au from 223.6m (ZRJD24002) Two rigs currently focused on testing the porphyry pote

  17. Slide 17: Project Development

    For personal use only Project Development 17

  18. Slide 18: Key Deliverables for 2025

    Key Deliverables for 2025 50,000m Resource and Discovery Drilling at Rogozna For personal use only Feb 2025 March 2025 Late March 2025 April 2025 1.28Moz AuEq Resource Drilling 5.3Moz AuEq Discovery Drilling ~10,000m diamond drilling for remainder of 2025 Maiden Commencement Shanac MRE Commencement

  19. Slide 19: Sustainability

    Sustainability Zlatna Reka Resources - Strickland Metals’ 100%-owned Serbian subsidiary For personal use only 58 permanent employees = >100% increase over 12 months; • 60% from local communities. • 31% Female = >50% increase over 12 months. • 20% of workforce focused on community, environment and cu

  20. Slide 20: Strickland Metals - Primed for Growth

    Strickland Metals - Primed for Growth Significant Scale 7.4Moz AuEq1 Rogozna Rogozna Resource Growth1 For personal use only Gold and Base Metals Project in Serbia. 9.0 Maiden MRE Medenovac for Gradina 8.0 Shanac and updated Clear Focus and exceptional leverage to Shanac MRE 7.0 Copper Canyon in late

  21. Slide 21: Mineral Resource & Supporting Information

    For personal use only Mineral Resource & Supporting Information 21

  22. Slide 22: Appendix 1: Rogozna Inferred Mineral Resource Estimates

    Appendix 1: Rogozna Inferred Mineral Resource Estimates Tonnes AuEq Au Cu Ag Pb Zn AuEq Au Cu Ag Pb Zn Prospect For personal use only (Mt) (g/t) (g/t) (%) (g/t) (%) (%) (Moz) (Moz) (kt) (Moz) (kt) (kt) Medenovac (February 21 1.9 0.77 0.27 6.3 0.11 1.54 1.28 0.52 57 4.3 23 320 2025)A Shanac (March 15

  23. Slide 23: Appendix 2: Junior Listed ASX Gold Project Summary

    Appendix 2: Junior Listed ASX Gold Project Summary Reported JORC 2012 Resource Gold Grade Copper Lead Grade Zinc Grade Silver Grade AuEq Grade Contained For personal use only Project Company Exchange Development Stage Tonnes (Mt) Source (g/t) Grade (%) (%) (%) (g/t) (g/t) AuEq (Moz) Estelle Nova Min

  24. Slide 24: Appendix 3: ASX Gold Project Resources

    Appendix 3: ASX Gold Project Resources Measured Indicated Inferred Total Gold Grade Contained Gold Grade Contained Gold Grade Contained Gold Grade Contained For personal use only Project Company Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t)

  25. Slide 25: Appendix 4: Junior Listed TSX Gold Project Summary

    Appendix 4: Junior Listed TSX Gold Project Summary Reported Mineral Resource Copper Lead Zinc Contained Gold Silver Grade AuEq Grade For personal use only Project Company Exchange Development Stage Tonnes (Mt) Grade Grade Grade AuEq Source Grade (g/t) (g/t) (g/t) (%) (%) (%) (Moz) Titiribi GoldMinin

  26. Slide 26: Appendix 5: TSX Gold Project Resources

    Appendix 5: TSX Gold Project Resources Measured Indicated Inferred Total Gold Grade Contained Gold Grade Contained Gold Grade Contained Gold Grade Contained For personal use only Project Company Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) Tonnes (Mt) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t) Gold (Moz) (g/t)

  27. Slide 27: Gold Equivalent Calculations

    Gold Equivalent Calculations Gold Equivalent Calculations (Rogozna Project) Gold Equivalent calculations for exploration results withing this presentation are based on the following metal prices; For personal use only For Shanac, Medenovac and Kotlovi (US$2,250/oz), copper (US$10,000/t), silver (US$

  28. Slide 28: For personal use only

    For personal use only Paul L’Herpiniere, Managing Director info@stricklandmetals.com.au +61 8 6317 9875

Strickland Metals — Precious Metals Summit Zurich 2025 on 6ix