Strickland Metals Ltd · ASX:STK
Strickland Metals — Alloy Resources — Investor Presentation (May 2013)
22 slides from Strickland Metals's investor presentation, May 2013

Slide 1: Investor Presentation
www.alloyres.com.au ABN: 20 109 361 195 ASX: AYR INVESTOR PRESENTATION Emerging Western Australian Gold Company May 2013

Slide 2: Clear Focus, Strong Board - Advanced Gold Projects
2 of 22 Clear Focus, Strong Board Advanced Gold Projects • Western Australian focussed • Experienced local Board • Highly prospective gold projects – one high-grade and one large size Horse Well - ‘Jundee’ scale large exploration style target Lynas Find - ‘Paulsens’ / ‘Andy Well’ high-grade style ta

Slide 3: Corporate Summary
3 of 22 Corporate Summary Board of Directors Peter Harold Non-Executive Chairman Andy Viner Managing Director Kevin Hart Non-Executive Director and Company Secretary Terry Mader Corporate Consultant Capital Structure Shares on Issue 273 million Options (4.5c unlisted) 3.5 million Market Cap (@ 0.8c)

Slide 4: Value Proposition
4 of 22 Value Proposition STATUS TARGET Horse Well Horse Well • Gold Exploration 50 km north of >5Moz Jundee mine • Ex - Eagle Mining 1990’s $500k to drill test targets • 950 km2 – mostly 100% New detailed Aeromagnetic survey • 100koz resource* - RC test 3km x 3km a/c drill anomaly • Large Cra

Slide 5: Exploration upside - EV per resource ounce
5 of 22 Exploration upside - EV per resource ounce Significant upside to current trading range compared to peer group Total Alloy peer group = 60 ASX listed gold explorers (stock price 29/4/2013)(1) Criteria for selection: • All ASX listed Australian based gold explorers (starting point) • No produc

Slide 6: Strategic Plan
6 of 22 Strategic Plan 1. Complete definition of Horse Well drill targets – make ‘access ready’ 2. Complete due diligence on Lynas Find Gold Project 3. Secure 2nd Gold Project and spread risk; leverage to exploration success 4. Secure funding to; ‘lock-in’ opportunities Add value by targeted dri

Slide 7: Horse Well Gold Project
7 of 22 Horse Well Gold Project • NE Goldfields Western Australia 2013? • 1995 discovery by Eagle Mining ?? Moz • 1997 crash in gold stopped Exploration • Minimal further exploration until 2010 1990 • Millrose greenstone belt under-explored >5 Moz • Compelling exploration project for the 1890 next l

Slide 8: Horse Well - Status
8 of 22 Horse Well - Status A Good Start….. 100,000 ounces of Gold Mineral Resources (*Mineral Resource table appended) 950 square kilometres of tenure adjacent to +5 Moz Jundee Gold Mine Gold mineral resource area growing….. Warmblood – Filly discoveries in 2011-2012 8m @ 5.7 g/t Au & 16m @ 2

Slide 9: Horse Well – Exploration Targets
9 of 22 Horse Well – Exploration Targets • Regional structural control understood • Poorly tested outside gold resource area

Slide 10: Crack of Dawn – the big one?
10 of 22 Crack of Dawn – the big one? • Eagle Mining 1996 • Discovery hole 11m @ 3.5 g/t Au • 20km north-west of Resource area • ‘Golden Eye’ Granite target • AYR air-core drilling December 2012 (Refer ASX release 23 January 2013) • Gold anomalies over 1 km strike length • Three immediate targets de

Slide 11: Crack of Dawn Prospect
11 of 22 Crack of Dawn Prospect • December 2012 exploration drilling success • Extensive alteration zone defined – 250 m x 30 m, open Planned RC drilling

Slide 12: Dusk til Dawn Prospect
12 of 22 Dusk til Dawn Prospect • Two large mineralised alteration zones Up to 1 km x 200 m, and open • Very deep leaching to fresh rock • RC drill testing beneath air-core drill anomalies required Planned RC drilling

Slide 13: Warmblood – new discovery
13 of 22 Warmblood – new discovery Filly SW Indicated Mineral Resource 90,400t @ 7.85 g/t 2 km mineralised trend established in 2012 8m @ 5.47 g/t Au from 93 metres (AHWR031) 16m @ 2.70 g/t Au from 71 metres (AHWR034) 18m @ 2.40 g/t Au from 12 metres (AHWR038) Registered Heritage Site access

Slide 14: Lynas Find Gold Project
14 of 22 Lynas Find Gold Project • Pilbara Goldfield of Western Australia • Historically reported 125koz mined from 1994-1998 • Extensive remnant gold mineralisation within project • Alloy targeting ‘Paulsens’ style mineralisation – High Grade underground

Slide 15: Lynas Find – high value target concept
15 of 22 Lynas Find – high value target concept • Shallow open-pits mined • 1998 gold price fall curtailed continuing exploration and development • High grade targets present in sparse historical deep drilling • Initial targets at Breccia Hill and Iron Stirrup • Consider remnant resources if deep ta

Slide 16: Breccia Hill target
16 of 22 Breccia Hill target • Open Pit 650m long and maximum 35 metres depth • High Grade mineralisation apparent from limited historical deep drilling

Slide 17: Breccia Hill cross section view
17 of 22 Breccia Hill cross section view

Slide 18: Iron Stirrup target
18 of 22 Iron Stirrup target • Thicker moderate grade target • Early stage of assessment

Slide 19: Iron Stirrup cross section view
19 of 22 Iron Stirrup cross section view • Continuous wide mineralised structure • Open at depth

Slide 20: Clear Focus, Strong Board - Advanced Gold Projects
20 of 22 Clear Focus, Strong Board Advanced Gold Projects • Experienced, expert local Board • Highly prospective W.A gold projects – one high-grade and one large size Horse Well - ‘Jundee’ scale large exploration style target Lynas Find - ‘Paulsens’ / ‘Andy Well’ high-grade style target • Low cost –

Slide 21: Company Statements
21 of 22 Company Statements Disclaimer This presentation has been prepared by Alloy Resources Limited (“Alloy”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties and thou

Slide 22: *Horse Well - Resources
22 of 22 *Horse Well - Resources JORC GRADE PROJECT PROSPECT CATEGORY TONNES (g/t Au) OUNCES Au Horse Well Palomino indicated 656,000 2.52 53,150 Inferred 105,000 3.71 12,525 Bronco indicated 41,400 1.59 2,117 Filly indicated 161,300 1.56 8,091 Filly SW indicated 90,400 7.85 22,817 Total 1,054,100 2
Source: Internet Archive copy of stricklandmetals.com.au
More decks from Strickland Metals Ltd
North American Conference Presentation September 202626 slides · Sep 23, 2026
Shareholder Meeting (April 2026)31 slides · Apr 22, 2026
Resource Rising Stars Gather Round Conference 202630 slides · Apr 8, 2026
Investor Presentation (February 2026)29 slides · Feb 17, 2026
Investor Presentation (February 2026)29 slides · Feb 16, 2026
Investor Presentation (February 2026)47 slides · Feb 3, 2026