Pinnacle Silver And Gold Corp · TSXV:PINN

Pinnacle Silver And Gold — Investor Presentation (March 2025)

31 slides from Pinnacle Silver And Gold's investor presentation, March 2025

  1. Slide 1: Creating a New Americas-Focused Silver-Gold Exploration and Development Company

    Creating a New Americas-Focused Silver-Gold Exploration and Development Company CORPORATE PRESENTATION March 2025 www.pinnaclesilverandgold.com TSXV: PINN OTC: NRGOF FSX: P9J

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement Except for historical information contained herein, this presentation contains forward looking statements including but not limited to comments regarding predictions and projections. Forward-looking statements address future events and conditions and therefore involve inher

  3. Slide 3: Pinnacle Silver and Gold

    Pinnacle Silver and Gold District-Scale Silver and Gold Exploration and Development in the Americas • High-Grade Gold-Silver project in the heart of the Sierra Madre Belt of Mexico • Past-producing Argosy Gold Mine, in the prolific Red Lake District, has significant depth potential • Eight kilometre

  4. Slide 4: Proven Business Model

    Pinnacle Silver and Gold PROVEN BUSINESS MODEL - First Majestic ($2.7B), Endeavour Silver ($1.6B), Great Panther ($600M) • Acquire a past-producing mine and bring it back into production quickly so as to build the company out of cash flow rather than relying on volatile markets and dilutive financin

  5. Slide 5: Proven Business Model

    Proven Business Model 1 Year Share Price Performance (%) Senior Gold Producers 46 Intermediate Gold Producers 64 Junior Gold Producers 94 Gold Developers 47 Gold Explorers 34 This is where we aim to be Silver Producers 61 Silver Developers & Explorers 39 0 10 20 30 40 50 60 70 80 90 100 Source: RBC

  6. Slide 6: Board and Management

    Board and Management Robert Archer, P.Geo. • More than 45 years’ experience in the mining industry, working throughout the Americas President & CEO, Director • Co-founded and built Great Panther Mining Limited from concept to a mid-tier precious metals producer with $600 M market cap • Professional

  7. Slide 7: Share Structure

    Share Structure No. Shares Shares Issued 81,425,985 Warrants 23,964,366 Options 3,500,000 Shares Fully Diluted* 109,027,940 *Fully Diluted number includes Finders Shares from As of March 25, 2025 2023 Bridge Financing Shareholders % • Recent share 25 price CA$0.04 39 35 • Market Cap ~CA$3.2 million

  8. Slide 8: El Potrero Gold-Silver Project

    El Potrero Gold-Silver Project • Past producing (1989 - 1990) gold-silver mine in the heart of Mexico’s Sierra Madre Belt • One of the most prolific gold-silver producing regions in the world • Mexico is the largest silver producer in the world TSXV: PINN OTC:NRGOF FSX: P9J 8

  9. Slide 9: El Potrero – 'In the shadow of a headframe'

    El Potrero – ‘In the shadow of a headframe’ • High-profile address - 4 operating mines within a 35 km radius • Cienega (Fresnillo) - 4,000 tpd Au-Ag-Pb-Zn • Tahueheto (Luca Mining) - 1,000 tpd Au-Ag-Cu-Pb-Zn • Topia (Guanajuato Silver) - 250 tpd Ag-Au-Pb-Zn • San Geronimo (private) - 150 tpd Ag-Pb-Z

  10. Slide 10: El Potrero Concessions

    El Potrero Concessions • Total area of 1,074 hectares in two blocks • Main Potrero block with historic mines and plant facilities • 686 hectares • Private land – no community issues • Nearby Maria Fernanda 2 concession with extensive alteration system and significant exploration potential • 388 hect

  11. Slide 11: El Potrero – High Grade

    El Potrero – High Grade • Small-scale mines accessible by adits can be rehabilitated easily • Good ground conditions • Historical resource1 of 45,451 tonnes at 8.0 g/t Au and 186 g/t Ag (10.2 g/t Au eq or 869 g/t Ag eq2) based upon underground sampling and past production • No previous systematic ex

  12. Slide 12: El Potrero – Plant on Site

    El Potrero – Plant on Site • 100 tpd plant on site can be refurbished / rebuilt at low cost • Completely scalable as resource grows • Crushing, milling, vat leach cyanidation and Merrill Crowe • Dry stack tailings storage facility • Baseline studies for permitting to begin as soon as possible TSXV:

  13. Slide 13: El Potrero – Exploration & Development

    El Potrero – Exploration & Development • Vein system can be followed for 4 km along regional NW-SE trend • Multiple artisanal mines along complex vein system in anastomosing pattern • Lack of any systematic ‘modern’ exploration increases potential for development of district-scale operation TSXV: PI

  14. Slide 14: El Potrero – Acquisition Terms

    El Potrero – Acquisition Terms • Pinnacle can earn 100% subject to a 2% NSR • Will earn 50% by commencing production • Balance of interest can be acquired over time by making staged cash payments out of cash flow • Payment schedule – all optional after signing DA • On signing Definitive Agreement (“

  15. Slide 15: Birch-Uchi Greenstone Belt, Red Lake District

    Birch-Uchi Greenstone Belt, Red Lake District • Next greenstone belt Argosy to the east of Red Lake Gold Mine North Birch Springpole Project Deposit • Similar geology but three times the size • Poorly explored due to Birch-Uchi Belt limited access • Springpole Gold Red Lake Belt Deposit (First Minin

  16. Slide 16: North Birch & Argosy Gold Mine Projects

    North Birch & Argosy Gold Mine Projects North Birch Project Argosy Gold Mine Project • Projects are almost contiguous & comprise a total of 4,454 hectares TSXV: PINN OTC:NRGOF FSX: P9J 16

  17. Slide 17: Argosy Gold Mine Project

    Argosy Gold Mine Project • Past producing (1931 - 1952) gold mine adjacent to North Birch Project • 101,875 oz of gold produced at 12.7 g/t • Pinnacle owns 100% Primary target subject to a 2.5% NSR horizon • Only 72 historic drill holes (>10,500 m) and no work on property since 2004 TSXV: PINN OTC:N

  18. Slide 18: Argosy Gold Mine – Property Geology

    Argosy Gold Mine – Property Geology • Property lies immediately southeast of North Birch Project • Underlain predominantly by mafic to intermediate volcanics, greywacke and iron formation • Quartz-feldspar porphyry is spatially associated with some of the best gold mineralization but not fully explo

  19. Slide 19: Argosy Gold Mine – Vein Locations

    Argosy Gold Mine – Vein Locations #3 Vein #2 Shaft #2 Vein #1 Shaft #1 Vein P Vein • Most of the veins occur in N-S fractures dipping 30-80° to the west • Quartz is accompanied by variable amounts of arsenopyrite, pyrrhotite, chalcopyrite, pyrite, sphalerite, galena and native gold TSXV: PINN OTC:NR

  20. Slide 20: Argosy Gold Mine – Depth Potential

    Argosy Gold Mine – Depth Potential Mine workings bottomed at 270m vertical Au mineralization extends to depth • Only 4 veins mined, to a maximum depth of about 270 metres • 2002-04 drilling intersected multiple new, unmined veins and gold mineralization extending to a vertical depth of 400 m • 3D Le

  21. Slide 21: Argosy Gold Mine – Historical Drilling Highlights

    Argosy Gold Mine – Historical Drilling Highlights HOLE# FROM TO INTERVAL Weighted Avg g/t Vein/Zone AM02-01 284.59 287.00 2.41 8.22 Vein # 8 Including 286.45 287.00 0.55 28.16 AM02-02 70.73 71.48 0.75 9.11 Vein # 11 AM02-07 180.80 188.60 7.80 4.27 Vein # 3 Including 183.80 185.50 1.70 14.67 Vein # 3

  22. Slide 22: Argosy Gold Mine – Typical Gold Mineralization

    Argosy Gold Mine – Typical Gold Mineralization DDH AM-02-07 183.80-185.50m No. 3 Vein assaying 14.7 g/t Au over 1.70m Grab sample from trench on No. 2 Vein assaying 17.8 g/t Au DDH AM-02-07 339.00-340.45m No. 2 Vein assaying 12.4 g/t Au over 1.45m TSXV: PINN OTC:NRGOF FSX: P9J 22

  23. Slide 23: North Birch Gold Project – Regional Setting

    North Birch Gold Project – Regional Setting Iron Formation Target North Birch Project • Folded Iron Formation (IF) is an attractive target for gold mineralization • IF hosted Au deposits are well known throughout the world • Largest is Homestake Mine, S. Dakota: 40+ Moz • Similar structural setting

  24. Slide 24: North Birch Folded & Sheared Iron Formation

    North Birch Folded & Sheared Iron Formation • 3,850 ha covering the North Birch Project entire Iron Formation Airborne Magnetics package • 100% owned subject to Primary target horizon 2% NSR • Several structures cutting the IF • Only a few kilometres from Argosy Mine & Kostynuk Mine - both show Au i

  25. Slide 25: North Birch Folded & Sheared Iron Formation

    North Birch Folded & Sheared Iron Formation • LiDAR survey flown in 2021 North Birch Project shows pronounced break in topographic features LiDAR Survey following the trace of the iron formation - interpreted Primary target horizon as a shear zone, >8km long • Iron formations are known to be excelle

  26. Slide 26: North Birch IP Survey

    North Birch IP Survey • 73.7 line kilometres of Induced Polarization over 7km of strike length • Detected several strong chargeability anomalies along the Primary Target Horizon • Discontinuous pattern suggests sulphide Primary mineralization rather target than lithological source horizon • Complexi

  27. Slide 27: First Two Holes Drilled on 'Fold Nose'

    First Two Holes Drilled on ‘Fold Nose’ Primary target horizon • Hole NB22001 was drilled on the ‘nose’ of the fold structure and intersected a deformation zone >100 metres wide with folded IF, confirming structural interpretation TSXV: PINN OTC:NRGOF FSX: P9J 27

  28. Slide 28: First Drill Hole Intersects Mineralized Structure

    First Drill Hole Intersects Mineralized Structure • Quartz, carbonate, and biotite alteration were observed in both holes and are common ingredients in Archean gold systems • Locally strong pyrite mineralization occurs as disseminations and ‘clots’ within quartz veins and can be positive indicators

  29. Slide 29: Upcoming Catalysts & News Flow in 2025

    Upcoming Catalysts & News Flow in 2025 El Potrero  Mapping & sampling of surface and underground workings  Rehabilitation of historical mines, refurbishment of plant  LiDAR survey  Diamond drilling Argosy  LiDAR survey of property  Diamond drilling on down-dip extension of veins North Birch 

  30. Slide 30: Pinnacle Silver and Gold - Summary

    Pinnacle Silver and Gold - Summary Creating a New Company with a Proven Business Model  Start with small-scale production; Expand resources & production  Build company out of cash flow rather than dilutive financings  Management has successful track record in doing this Silver and Gold in the Ame

  31. Slide 31: Contact Us

    Email: info@pinnaclesilverandgold.com Contact Us www.pinnaclesilverandgold.com TSXV: PINN OTC:NRGOF FSX: P9J

Pinnacle Silver and Gold — Investor Presentation (March 2025) on 6ix