Pinnacle Silver And Gold Corp · TSXV:PINN

Pinnacle Silver And Gold — Investor Presentation (March 2026)

38 slides from Pinnacle Silver And Gold's investor presentation, March 2026

  1. Slide 1: Creating a New Americas-Focused Silver-Gold Exploration and Development Company

    Creating a New Americas-Focused Silver-Gold Exploration and Development Company CORPORATE PRESENTATION March 2026 www.pinnaclesilverandgold.com TSXV: PINN OTC: PSGCF FSX: P9J

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement Except for historical information contained herein, this presentation contains forward looking statements including, but not limited to, comments regarding predictions and projections. Forward-looking statements address future events and conditions and therefore involve inh

  3. Slide 3: Pinnacle Silver and Gold

    Pinnacle Silver and Gold • Mission: To increase shareholder value by getting into production as quickly as possible and rapidly achieving positive cash flow to continue building the company • Vision: To build a producing precious metals mining company focused in the Americas • Values: To operate wit

  4. Slide 4: Pinnacle Silver and Gold – Fast Track to Production

    Pinnacle Silver and Gold – Fast Track to Production • Producers are experiencing average profit margins of >US$2,000 per ounce of gold TSXV: PINN OTC: PSGCF FSX: P9J 4

  5. Slide 5: Pinnacle Silver and Gold – Fast Track to Production

    Pinnacle Silver and Gold – Fast Track to Production How?: • Acquire a high-grade past-producing mine and bring it back into production as quickly as possible • Use an advance on an offtake agreement to fund CAPEX and initial OPEX • Highly experienced board and management team with local expertise •

  6. Slide 6: El Potrero – Acquisition Terms

    El Potrero – Acquisition Terms • Pinnacle can earn 100% subject to a 2% NSR • Will earn 50% by commencing production • Balance of interest can be acquired over time by making staged cash payments out of cash flow • Payment schedule – all optional after signing of DA (Feb 2025) • On signing Definitiv

  7. Slide 7: Board and Management – Highly Experienced Team

    Board and Management – Highly Experienced Team Robert Archer, P.Geo. • More than 45 years’ experience in the mining industry, working throughout the Americas President & CEO, Director • Co-founded and built Great Panther Mining Limited from concept to a mid-tier precious metals producer with $600 M

  8. Slide 8: Share Structure

    Share Structure No. Shares Shares Issued 144,264,158 Warrants 36,131,484 Options 6,470,000 Shares Fully Diluted* 187,003,231 *Fully Diluted number includes Finders Shares from As of March 19, 2026 2023 Bridge Financing • Recent share price CA$0.13 • Market Cap ~CA$19 million • Ave trading volume: 8.

  9. Slide 9: El Potrero Gold-Silver Project – Sierra Madre

    El Potrero Gold-Silver Project – Sierra Madre • Past producing (1989 - 1990) gold-silver mine in the heart of Mexico’s Sierra Madre Belt, one of the most prolific gold-silver producing regions in the world TSXV: PINN OTC: PSGCF FSX: P9J 12

  10. Slide 10: El Potrero – 'In the shadow of a headframe'

    El Potrero – ‘In the shadow of a headframe’ • High-profile address - 4 operating mines within a 35 km radius • Cienega (Fresnillo) - 4,000 tpd Au-Ag-Pb-Zn • Tahuehueto (Luca Mining) - 1,000 tpd Au-Ag-Cu-Pb-Zn • Topia (Guanajuato Silver) - 250 tpd Ag-Au-Pb-Zn • San Geronimo (private) - 150 tpd Ag-Pb-

  11. Slide 11: El Potrero – Excellent Infrastructure

    El Potrero – Excellent Infrastructure • Mines and plant sit on a ‘ledge’ with road access, powerline within 4.5 km and water in river valley below TSXV: PINN OTC: PSGCF FSX: P9J 15

  12. Slide 12: El Potrero – Plant on Site

    El Potrero – Plant on Site • 100 tpd plant on site can be refurbished / rebuilt at low cost • Crushing, milling, vat leach cyanidation and Merrill Crowe, with testing underway for gravity circuit • Metallurgical tests imply head grades of about 7.7 g/t Au & 116 g/t Ag • Ave. 95% gold recovery from p

  13. Slide 13: El Potrero – High Grade

    El Potrero – High Grade • Small-scale mines cleaned and systematically channel sampled • ~900 underground samples taken • Veins only partially exposed but with local high-grade Au- Ag mineralization in the form of grey- black ginguro bands (electrum & silver sulphides) and fine Visible Gold • Up to

  14. Slide 14: El Potrero – Planning Underground Delineation Drilling

    El Potrero – Planning Underground Delineation Drilling Up to 85.1 g/t Au and 520 g/t Ag Sublevel Proposed drill holes Pinos Cuates Mine Raise main level Dos de Mayo vein structure • 3D models have been prepared for each of the 3 historic mines • Approximately 2,500 metres in ~100 holes, ranging from

  15. Slide 15: El Potrero – Preparing for Underground Drilling

    El Potrero – Preparing for Underground Drilling • Stations for underground drill holes have been laid out • Mining contractor is enlarging accessways and drill stations • Rock bolts and screening are being added to improve safety conditions prior to start of drilling TSXV: PINN OTC: PSGCF FSX: P9J 1

  16. Slide 16: El Potrero – Extensive Vein System

    El Potrero – Extensive Vein System Dos de Mayo Vein El Capulin Vein La Estrella Vein • 3 principal mines along 500 m strike length will be initial focus for production • Main Dos de Mayo vein structure has been traced for 1,600 metres • Other veins like El Capulin and La Estrella indicate larger sys

  17. Slide 17: El Potrero – LiDAR Survey Completed Over Entire 11 km2

    El Potrero – LiDAR Survey Completed Over Entire 11 km2 Current Plant focus Regional El Potrero Intrusive Block Maria Fernanda 2 (MF2) Block • Plant & historic mines in northern 10% of property • Rest of property never explored but has potential for additional vein systems and/or intrusive-related mi

  18. Slide 18: El Potrero – LiDAR Survey Identifies Multiple New Targets

    El Potrero – LiDAR Survey Identifies Multiple New Targets Plant Au-Ag Maria Fernanda 2 El Potrero (MF2) Block Block Ag-Pb-Zn • A total of 6 shafts, 64 adits and 51 prospecting pits interpreted from LiDAR survey, in addition to the potential SE extension of the Dos de Mayo vein system and other, prev

  19. Slide 19: El Potrero – LiDAR Survey: El Potrero Block

    El Potrero – LiDAR Survey: El Potrero Block • Main trend of Dos Historic de Mayo vein workings structure, El Capulin and La on Dos Estrella stand out El Capulin de Mayo on the LiDAR structure La Estrella • 3 shafts, 50 adits and 29 prospecting pits Structures identified over the interpreted claim bl

  20. Slide 20: El Potrero – MF2 Block Ag-Pb-Zn Discovery

    El Potrero –MF2 Block Ag-Pb-Zn Discovery • Never been previously explored yet 3 shafts, 14 adits and 22 prospecting pits identified by LiDAR • Discovery of NE trending Strong argillic breccia vein with Ag-Pb-Zn alteration over 650 m strike length • Individual assays of 266 g/t Ag, 4.39% Pb and 2.89%

  21. Slide 21: Next Steps – Catalysts and Milestones

    Next Steps – Catalysts and Milestones • Continued surface & underground mapping and sampling • Continuing permitting process • Complete underground rehabilitation in preparation for drilling • Underground and surface diamond drilling • Phase II metallurgical testing • Redesign of plant & complete co

  22. Slide 22: Pinnacle Silver and Gold - Summary

    Pinnacle Silver and Gold - Summary Creating a New Company with a Proven Business Model  Start with small-scale production; Expand resources & production  Build company out of cash flow rather than dilutive financings  Management has successful track record in doing this Silver and Gold in the Ame

  23. Slide 23: Contact Us

    Email: info@pinnaclesilverandgold.com Contact Us www.pinnaclesilverandgold.com TSXV: PINN OTC: PSGCF FSX: P9J

  24. Slide 24: APPENDIX

    APPENDIX TSXV: PINN OTC: PSGCF FSX: P9J

  25. Slide 25: Birch-Uchi Greenstone Belt, Red Lake District

    Birch-Uchi Greenstone Belt, Red Lake District • Next greenstone belt Argosy to the east of Red Lake Gold Mine North Birch Springpole Project Deposit • Similar geology but three times the size • Poorly explored due to Birch-Uchi Belt limited access • Springpole Gold Red Lake Belt Deposit (First Minin

  26. Slide 26: North Birch & Argosy Gold Mine Projects

    North Birch & Argosy Gold Mine Projects North Birch Project Argosy Gold Mine Project • Projects are almost contiguous & comprise a total of 4,454 hectares TSXV: PINN OTC: PSGCF FSX: P9J 30

  27. Slide 27: Argosy Gold Mine Project

    Argosy Gold Mine Project • Past producing (1931 - 1952) gold mine adjacent to North Birch Project • 101,875 oz of gold produced at 12.7 g/t • Pinnacle owns 100% Primary target subject to a 2.5% NSR horizon • Only 72 historic drill holes (>10,500 m) and no work on property since 2004 TSXV: PINN OTC:

  28. Slide 28: Argosy Gold Mine – Property Geology

    Argosy Gold Mine – Property Geology • Property lies immediately southeast of North Birch Project • Underlain predominantly by mafic to intermediate volcanics, greywacke and iron formation • Quartz-feldspar porphyry is spatially associated with some of the best gold mineralization but not fully explo

  29. Slide 29: Argosy Gold Mine – Vein Locations

    Argosy Gold Mine – Vein Locations #3 Vein #2 Shaft #2 Vein #1 Shaft #1 Vein P Vein • Most of the veins occur in N-S fractures dipping 30-80° to the west • Quartz is accompanied by variable amounts of arsenopyrite, pyrrhotite, chalcopyrite, pyrite, sphalerite, galena and native gold TSXV: PINN OTC: P

  30. Slide 30: Argosy Gold Mine – Typical Gold Mineralization

    Argosy Gold Mine – Typical Gold Mineralization DDH AM-02-07 183.80-185.50m No. 3 Vein assaying 14.7 g/t Au over 1.70m Grab sample from trench on No. 2 Vein assaying 17.8 g/t Au DDH AM-02-07 339.00-340.45m No. 2 Vein assaying 12.4 g/t Au over 1.45m TSXV: PINN OTC: PSGCF FSX: P9J 34

  31. Slide 31: Argosy Gold Mine – Historical Drilling Highlights

    Argosy Gold Mine – Historical Drilling Highlights HOLE# FROM TO INTERVAL Weighted Avg g/t Vein/Zone AM02-01 284.59 287.00 2.41 8.22 Vein # 8 Including 286.45 287.00 0.55 28.16 AM02-02 70.73 71.48 0.75 9.11 Vein # 11 AM02-07 180.80 188.60 7.80 4.27 Vein # 3 Including 183.80 185.50 1.70 14.67 Vein # 3

  32. Slide 32: Argosy Gold Mine – Depth Potential

    Argosy Gold Mine – Depth Potential Mine workings bottomed at 270m vertical Au mineralization extends to depth • Only 4 veins mined, to a maximum depth of about 270 metres • 2002-04 drilling intersected multiple new, unmined veins and gold mineralization extending to a vertical depth of 400 m • 3D Le

  33. Slide 33: North Birch Gold Project – Regional Setting

    North Birch Gold Project – Regional Setting Iron Formation Target North Birch Project • Folded Iron Formation (IF) is an attractive target for gold mineralization • IF hosted Au deposits are well known throughout the world • Largest is Homestake Mine, S. Dakota: 40+ Moz • Similar structural setting

  34. Slide 34: North Birch Folded & Sheared Iron Formation

    North Birch Folded & Sheared Iron Formation • 3,850 ha covering the North Birch Project entire Iron Formation Airborne Magnetics package • 100% owned subject to Primary target horizon 2% NSR • Several structures cutting the IF • Only a few kilometres from Argosy Mine & Kostynuk Mine - both show Au i

  35. Slide 35: North Birch Folded & Sheared Iron Formation

    North Birch Folded & Sheared Iron Formation • LiDAR survey flown in 2021 North Birch Project shows pronounced break in topographic features LiDAR Survey following the trace of the iron formation - interpreted Primary target horizon as a shear zone, >8km long • Iron formations are known to be excelle

  36. Slide 36: North Birch IP Survey

    North Birch IP Survey • 73.7 line kilometres of Induced Polarization over 7km of strike length • Detected several strong chargeability anomalies along the Primary Target Horizon • Discontinuous pattern suggests sulphide Primary mineralization rather target than lithological source horizon • Complexi

  37. Slide 37: First Two Holes Drilled on 'Fold Nose'

    First Two Holes Drilled on ‘Fold Nose’ Primary target horizon • Hole NB22001 was drilled on the ‘nose’ of the fold structure and intersected a deformation zone >100 metres wide with folded IF, confirming structural interpretation TSXV: PINN OTC: PSGCF FSX: P9J 41

  38. Slide 38: First Drill Hole Intersects Mineralized Structure

    First Drill Hole Intersects Mineralized Structure • Quartz, carbonate, and biotite alteration were observed in both holes and are common ingredients in Archean gold systems • Locally strong pyrite mineralization occurs as disseminations and ‘clots’ within quartz veins and can be positive indicators

Pinnacle Silver and Gold — Investor Presentation (March 2026) on 6ix