Pinnacle Silver And Gold Corp · TSXV:PINN

Pinnacle Silver And Gold — Investor Presentation (October 2026)

33 slides from Pinnacle Silver And Gold's investor presentation, October 2026

  1. Slide 1: An Americas-Focused Silver-Gold Development Company

    An Americas-Focused Silver-Gold Development Company CORPORATE PRESENTATION October 2026 www.pinnaclesilverandgold.com TSXV: PINN OTCQB: PSGCF FSX: P9J

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement Except for historical information contained herein, this presentation contains forward looking statements including, but not limited to, comments regarding predictions and projections. Forward-looking statements address future events and conditions and therefore involve inh

  3. Slide 3: Pinnacle Silver and Gold - Fast Track to Production

    Pinnacle Silver and Gold - Fast Track to Production • Focused on production – build the company out of cash flow • High-grade underground mines – better profit margins, smaller footprint • Team – Highly experienced with successful track record • Prolific precious metal districts – Sierra Madre, MX a

  4. Slide 4: Gold: Short-Term Outlook

    Gold: Short-Term Outlook • Gold has corrected on profit-taking, geopolitical issues, interest rates, etc. after run-up to all-time high • Likely to consolidate for a while before resuming uptrend TSXV: PINN OTCQB:PSGCF FSX: P9J 4

  5. Slide 5: Gold: Long-Term Uptrend

    Gold: Long-Term Uptrend • All the fundamentals that are driving this uptrend are still intact and will continue to be so for years to come TSXV: PINN OTCQB:PSGCF FSX: P9J 5

  6. Slide 6: Silver: Predictable Trading Pattern

    Silver: Predictable Trading Pattern • Silver consistently trades in a ‘hockey-stick pattern’ – period of consolidation followed by a parabolic rise and ~50% correction; then the cycle repeats • Price is largely investment driven, especially during sharp increases TSXV: PINN OTCQB:PSGCF FSX: P9J 6

  7. Slide 7: Silver Producers: Record Cash Flow

    Silver Producers: Record Cash Flow • Cash Cost of silver production in 2025 was US$11.06/oz • We are already looking at the widest profit margins in history • Every increase in the price goes straight to the bottom line TSXV: PINN OTCQB:PSGCF FSX: P9J 7

  8. Slide 8: Gold Producers Showing Unprecedented Profits

    Gold Producers Showing Unprecedented Profits • Record high gold and silver prices means that producers are making unprecedented profits and experiencing average profit margins of >US$2,000 per ounce of gold • Pinnacle is focused on rapidly commencing production and continuing to expand the project a

  9. Slide 9: Pinnacle is Following an Established Business Model

    Pinnacle is Following an Established Business Model • Pinnacle’s goal is to commence production by late 2027 / early 2028, subject to final permitting TSXV: PINN OTCQB:PSGCF FSX: P9J 9

  10. Slide 10: Pinnacle's Strategy & Implementation – Disciplined Growth

    Pinnacle’s Strategy & Implementation – Disciplined Growth PROVEN BUSINESS MODEL - Acquire a high-grade past-producing mine and bring it back into production as quickly as possible in order to grow the company out of cash flow • Highly experienced team to explore, develop and re-build the mine • Star

  11. Slide 11: Board and Management Team – Highly Experienced & Successful

    Board and Management Team – Highly Experienced & Successful • Company builders - Great Panther – concept to mid-tier producer, TSXV to NYSE-AMEX in 7 years - $5.00/share, $600 million MC • Mine builders & operators – D. Salari, Met. Eng. is building 4 other plants in Mexico; • C. Castro, Mining Eng.

  12. Slide 12: Board – Highly Experienced Team

    Board – Highly Experienced Team Robert Archer, P.Geo. • More than 45 years’ experience in the mining industry, working throughout the President & CEO, Director Americas • Co-founded and built Great Panther Mining Limited from concept to a mid-tier precious metals producer with $600 M market cap • Pr

  13. Slide 13: Management – Rebuilding In-country Team

    Management – Rebuilding In-country Team Dave Cross, CPA, CGA • Partner of Cross Davis and Company LLP Chartered Professional Accountants, specializing in CFO & Corporate Secretary accounting and management services for private and publicly-listed companies within the mining industry • More than 21 y

  14. Slide 14: El Potrero Acquisition Terms – Staged Earn-In

    El Potrero Acquisition Terms – Staged Earn-In • Pinnacle can earn 100% subject to a 2% NSR • Low up-front payments • Will earn 50% upon commencing production • Balance of interest can be acquired over 2 years by making staged cash payments out of cash flow Payment schedule – all payments optional af

  15. Slide 15: Share Structure

    Share Structure No. Shares Shares Issued 162,856,556 Warrants 37,187,195 Options 6,470,000 Shares Fully Diluted 206,513,751 As of Oct. 2, 2026 • M. Kott & R. Archer own ~19% • 52 week Hi-Lo: $0.19 - $0.085 • Recent share price CA$0.10-0.11 • Market Cap ~CA$16 million • Ave trading volume: ~5M shares

  16. Slide 16: El Potrero Gold-Silver Project – Sierra Madre Belt

    El Potrero Gold-Silver Project – Sierra Madre Belt • Past producing (1989 - 1990) gold-silver mine in the heart of Mexico’s Sierra Madre Belt, one of the most prolific gold-silver producing regions in the world TSXV: PINN OTCQB:PSGCF FSX: P9J 16

  17. Slide 17: El Potrero – 'In the shadow of a headframe'

    El Potrero – ‘In the shadow of a headframe’ • High-profile address - 4 operating mines within a 35 km radius • Cienega (Fresnillo) - 4,000 tpd Au-Ag-Pb-Zn • Tahuehueto (Luca Mining) - 1,000 tpd Au-Ag-Cu-Pb-Zn • Topia (Guanajuato Silver) - 250 tpd Ag-Au-Pb-Zn • San Geronimo (private) - 150 tpd Ag-Pb-

  18. Slide 18: El Potrero – Excellent Infrastructure

    El Potrero – Excellent Infrastructure • Historical mines and plant have road access, powerline within 3.3 km and water in river valley below TSXV: PINN OTCQB:PSGCF FSX: P9J 18

  19. Slide 19: El Potrero – Plant on Site

    El Potrero – Plant on Site • 100 tpd plant on site can be rebuilt at low cost • Crushing, milling, vat leach cyanidation and Merrill Crowe circuits • Metallurgical tests imply head grades of about 7.7 g/t Au & 116 g/t Ag • Gold recovery exceeds 97% in preliminary met tests • Dry stack tailings stora

  20. Slide 20: El Potrero – High Grade

    El Potrero – High Grade • 3 small-scale mines over 500 m strike length; cleaned and systematically channel sampled • >1,000 underground samples taken • Veins display local high- grade Au-Ag mineralization in the form of grey-black ginguro bands (electrum & silver sulphides) and fine Visible Gold • U

  21. Slide 21: El Potrero – Underground Delineation Drilling

    El Potrero – Underground Delineation Drilling • 3D models have been prepared for each of the 3 historic mines • Approximately 2,500 metres in >100 holes, averaging about 25 metres in length • 80 holes completed to date; transition to surface drilling in Oct.-Nov. TSXV: PINN OTCQB:PSGCF FSX: P9J 21

  22. Slide 22: El Potrero – Dos de Mayo & Pinos Cuates Mineralized Zones

    El Potrero – Dos de Mayo & Pinos Cuates Mineralized Zones 9.69 g/t Au, 143 g/t Ag over 13.2 m along strike 10.76 g/t Au, 215 g/t Ag Mineralized over 1.3 m Zones 5.39 g/t Au, 73 g/t Ag 6.19 g/t Au, 90 g/t Ag over 2.54 m over 10.9 m up-dip ?15.55 g/t Au, 222 g/t Ag over 1.1 m • Underground drilling co

  23. Slide 23: El Potrero – Extensive Vein System

    El Potrero – Extensive Vein System Plant Dos de Mayo Vein El Capulin Vein La Estrella Vein • Main Dos de Mayo vein structure has been traced for 1,600 metres • 3 principal mines along 500 m strike length of Dos de Mayo will be initial focus for production • Other veins like El Capulin and La Estrell

  24. Slide 24: La Estrella Vein – Priority Drill Target

    La Estrella Vein – Priority Drill Target • ~500m from main Dos de Mayo vein & 500m higher in elevation – depth potential • Traced for ~400m along strike and 200m vertical – tonnage potential • 5.49 g/t Au and 48 g/t Ag over an average width of 0.72 m & strike length of 12 m • 1.87 g/t Au and 51 g/t

  25. Slide 25: El Capulin Vein – Mid-term Production Potential

    El Capulin Vein – Mid-term Production Potential • ~200m SW of Dos de Mayo mines and road accessible • ~150m higher in elevation – good vertical potential • 375m strike length so far • Grades appear to be more consistent – needs to be drilled TSXV: PINN OTCQB:PSGCF FSX: P9J 25

  26. Slide 26: Exploration – LiDAR Survey Completed Over Entire 11 km2

    Exploration – LiDAR Survey Completed Over Entire 11 km2 Current Plant focus Regional El Potrero Intrusive Block Maria Fernanda 2 (MF2) Block • Plant & historic mines in northern 10% of property • Rest of property never explored but has potential for additional vein systems and intrusive-related mine

  27. Slide 27: El Potrero Block – High-Grade Silver Discovery

    El Potrero Block – High-Grade Silver Discovery Historic • Main trend of Au-Ag Dos de Mayo vein Au-Ag workings structure, El Capulin and La Estrella on Dos stand out on the LiDAR de Mayo El Capulin structure • 3 shafts, 50 adits and 29 prospecting La Estrella pits identified over the claim block • Di

  28. Slide 28: MF2 Block Ag-Pb-Zn Discovery – District Scale Potential?

    MF2 Block Ag-Pb-Zn Discovery – District Scale Potential? • Never been previously explored yet 3 shafts, 14 adits and 22 prospecting pits identified by LiDAR Strong argillic • Discovery of NE trending breccia veins with alteration Au-Ag-Pb-Zn over 1,100 m strike length Rhyolite • Artisanal mines - up

  29. Slide 29: Significant Re-rating Opportunity

    Significant Re-rating Opportunity • Pinnacle is extremely undervalued compared to other junior producers & developers • El Potrero presents several opportunities for a re-rating over the next 12-18 months • Second acquisition will create additional upside Junior Developers & Producers by Market Cap

  30. Slide 30: El Potrero – Systematically De-Risking the Project

    El Potrero – Systematically De-Risking the Project • Diamond drilling  resource estimate  mine plan • Feasibility study for powerline extension complete • Flowsheet for plant, water balance and electrical requirements being finalized • Formal agreement with local community in progress • Environmen

  31. Slide 31: Next Steps – Catalysts and Milestones

    Next Steps – Catalysts and Milestones • Continued mapping and sampling, including follow up on new Ag-Pb-Zn zones • Underground and surface diamond drilling  internal resource & preliminary mine plan • Permitting process ongoing • Additional metallurgical testing  redesign of plant & complete cost

  32. Slide 32: Pinnacle Silver and Gold - Summary

    Pinnacle Silver and Gold - Summary Creating a New Precious Metal Producer with a Proven Business Model • Start with small-scale production; Expand resources & production • Build company out of cash flow rather than dilutive financings • Management has successful track record in doing this Silver and

  33. Slide 33: Contact Us

    Email: info@pinnaclesilverandgold.com Contact Us www.pinnaclesilverandgold.com TSXV: PINN OTCQB:PSGCF FSX: P9J 33