  1. Slide 1: Rebirthing the Bryah Basin's Original Major Copper Discovery

    Rebirthing the Bryah Basin’s Original Major Copper Discovery Horseshoe Metals Limited ASX: HOR CORPORATE PRESENTATION November 2021

  2. Slide 2: Disclaimer

    Disclaimer The material in this presentation (“material”) is not and does not constitute an offer, Resource at Horseshoe Lights Copper/Gold Project”, released to the ASX on 5th June invitation or recommendation to subscribe for, or purchase any security in Horseshoe 2013. The Company confirms that i

  3. Slide 3: Corporate Summary

    Corporate Summary Capital Structure Board Ordinary Shares 254.3M Mr Craig Hall - Non-Executive Director Options Nil Mr Alan Still - Non-Executive Director Last Traded Share Price $0.012 Ms Kate Stoney - Non-Executive Director (at 11 December 2019) & Company Secretary Market Capitalisation $3.05M Pro

  4. Slide 4: Transaction Overview

    Transaction Overview Shares on Issue 254,252,190 Debt Satisfaction1 1.5c 17,642,115 Advanced Funds Conversion1 2.0c 40,000,000 $800,000 Proposed placement1 (up to) 2.0c 75,000,000 $1,500,000 Debt Reduction1 2.0c 46,500,000 $930,000 Directors Issue1 2.0c 3,000,000 Entitlement Offer (up to) 2.0c 109,0

  5. Slide 5: Use of Funds

    Use of Funds Activity Timing Expenditure ($) Horseshoe Lights Project Feasibility Study Current to Feb 22 370,216 Auger/AC/RC Drilling Current to Dec 21 791,055 Diamond Drilling Jan 22 to Apr 22 242,000 Glenloth Project RC Drilling and Geochemistry EPEPR approval plus 2 months 313,500 Project Compli

  6. Slide 6: Horseshoe Lights Cu-Au Project Highlights

    Horseshoe Lights Cu-Au Project Highlights ▪ Original Cu/Au VMS discovery in the Bryah Basin ▪ Located approx. 60 km west of DeGrussa Cu mine ▪ Past production ~316,000 oz Au & 55 kt Cu metal ▪ Current in situ resource 128 kt Cu metal @ 1.0% (0.5% cut-off) ▪ Current stockpile resource 9.5 kt Cu metal

  7. Slide 7: Horseshoe Lights Overview

    Horseshoe Lights Overview ▪ Historic open pit operated until 1994 in two distinct phases (CIL- Au and Flotation Cu-Au), producing: ✓ 300,000 ounces of gold ✓ 54,000 tonnes of contained copper including ✓ 110,000 tonnes of Direct Shipping Ore (DSO) grading between 20-30% copper ▪ Volcanogenic Massive

  8. Slide 8: Strategic Objectives & Near-Term Focus

    Strategic Objectives & Near-Term Focus Horseshoe Lights Copper/Gold Project ▪ Extensive infill drilling of existing open pit copper resource ▪ Drilling of regional targets and extensions outside current resource base ▪ Review of structural setting to target high grade repetitions of VMS lenses (two

  9. Slide 9: Horseshoe Lights and Kumarina - Regional

    Horseshoe Lights and Kumarina - Regional

  10. Slide 10: Horseshoe Lights Mine - Regional Setting

    Horseshoe Lights Mine - Regional Setting

  11. Slide 11: Horseshoe Lights – Historic Evaluation

    Horseshoe Lights – Historic Evaluation Large Historic Database ▪ Substantial drilling completed: ➢ RC 968 holes for 95,130m ➢ Diamond 91 holes for 26,892m ➢ RAB 398 holes for 8,778m ▪ Multiple metallurgical test work programmes – oxide & sulphide ▪ 2014 Scoping study and pit optimisation ▪ Main Zone

  12. Slide 12: Horseshoe Lights Mine – Section 7194030 mN

    Horseshoe Lights Mine – Section 7194030 mN

  13. Slide 13: Horseshoe Lights Mine – NW Extension Zone

    Horseshoe Lights Mine – NW Extension Zone

  14. Slide 14: Horseshoe Lights – BTD Conceptual Target

    Horseshoe Lights – BTD Conceptual Target

  15. Slide 15: Recent RC Drilling - Motters Zone

    Recent RC Drilling - Motters Zone 2021 RC Drilling Programme ▪ Motters Zone - designed to confirm and extend known resources ▪ 15 holes completed for 1,143m, to a maximum depth of 139m – results include: ▪45m @ 1.22 % Cu from 2m (Hole RC1151) ▪22m @ 1.87 % Cu from 12m (Hole RC1152) ▪26m @ 1.31 % Cu

  16. Slide 16: Motters Cross Section - 7194440mN

    Motters Cross Section - 7194440mN

  17. Slide 17: Horseshoe Lights – Surface Targets

    Horseshoe Lights – Surface Targets

  18. Slide 18: Horseshoe Lights – Auger Programme

    Horseshoe Lights – Auger Programme Phase 1 Auger Drilling to assess various remnant surface stockpiles from historic gold and copper mining activities. Targets tested ▪ Gold vat leach material (85 holes) ▪ Gold vat perimeter (62 holes) ▪ Gold rehandle stockpile (72 holes) ▪ Gold/Copper flotation tai

  19. Slide 19: Regional Upside – Kumarina

    Regional Upside – Kumarina ▪ Copper deposits discovered in 1913 and worked intermittently until 1973 ▪ Workings extend over nearly 5km as a series of pits, shafts and shallow open cuts ▪ Majority of workings are underground with drives from the main shaft extending 100 to 200m to a depth of 49m belo

  20. Slide 20: ASX Peer Comparisons

    ASX Peer Comparisons Significant value opportunity versus ASX-listed peers Company Code ~M/Cap ($A) JORC 2012 Resource Project Location Hot Chili Limited HCH 180M 724Mt at 0.48% CuEq for 2.9Mt Costa Fuego Copper Hub, copper Chile (multiple deposits) Caravel Minerals CVV 140M 1.18Bt @ 0.24% Cu for 2.

  21. Slide 21: South Australia - Project Overview

    South Australia - Project Overview

  22. Slide 22: Glenloth Gold Project Overview

    Glenloth Gold Project Overview ▪ Glenloth EL comprises two areas being Tunkillia North and Glenloth Goldfield ▪ Located about 7 km north and 50 km east respectively of the 1.0 MOz Tunkillia Gold deposit. ▪ Alluvial gold discovery in 1893, and established in 1901 when auriferous reefs were identified

  23. Slide 23: Glenloth Gold Project – Regional Setting

    Glenloth Gold Project – Regional Setting

  24. Slide 24: Contact

    COVER Contact: Horseshoe Metals t: +61 8 6241 1844 24

  25. Slide 25: Appendices Additional Technical Information

    Appendices Additional Technical Information

  26. Slide 26: Horseshoe Metals Current Resources

    Horseshoe Metals current resources Horseshoe Lights In situ Category Tonnes (Mt) Cu (%) Au (g/t) Ag (g/t) Cu metal (tonnes) Au metal (oz) Ag metal (k oz) Measured 1.73 1.04 0.0 0.5 18,000 1,900 28.8 Indicated 2.43 0.95 0.0 0.7 23,200 3,400 52.2 Inferred 8.69 1.01 0.1 2.6 87,400 30,700 712.4 Total 12

  27. Slide 27: Horseshoe Lights Mine - Historic Flitch Plans

    Horseshoe Lights Mine - Historic Flitch Plans

  28. Slide 28: Motters Cross Section - 7194420mN

    Motters Cross Section - 7194420mN

  29. Slide 29: Horseshoe Lights – Auger Programme

    Horseshoe Lights – Auger Programme

  30. Slide 30: Glenloth Goldfield – Proposed RC Drilling

    Glenloth Goldfield – Proposed RC Drilling