Horseshoe Metals Limited · ASX:HOR

Horseshoe Metals — Investor Presentation (June 2014)

24 slides from Horseshoe Metals's investor presentation, Jun 3, 2014

  1. Slide 1: Investor Presentation June 2014

    For personal use only INVESTOR PRESENTATION June 2014 ASX:HOR Exploring and Developing Quality Copper-Gold Projects

  2. Slide 2: Disclaimer

    Disclaimer For personal use only This presentation is not a prospectus nor an offer for securities in any jurisdiction nor a securities recommendation. The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment de

  3. Slide 3: Corporate Summary

    Corporate Summary For personal use only Capital Structure Ordinary Shares 86.1 M Options (60c Exp 25/05/15) 5.4 M Performance Rights 3.8 M Market Capitalisation $1.7 M (undiluted @ $0.02 per share) Cash at Bank (31/05/14)* $0.1 M *Excludes funds from capital raising in progress Management (post capi

  4. Slide 4: Capital Raising - In Progress

    Capital Raising - In Progress For personal use only DESCRIPTION NUMBER PRICE FUNDS RAISED*  Shares Presently on Issue 86,072,973 - -  Fotios Subscription Agreement 9,642,857 $0.031 $300,000  Fotios (or nominee) Placement 11,000,000 $0.03 $330,000 Agreement  Fotios Drilling Contract for Shares 11

  5. Slide 5: Projects Overview

    Projects Overview Horseshoe Lights Project For personal use only • ~80km2 holding located 75km west of SFR’s DeGrussa Cu/Au mine and 23km east of RNI’s new Cu/Au discovery at Forrest Prospect • includes the Altered Volcanogenic Massive Sulphide (VMS) Horseshoe Lights Cu/Au mine • Past production: ~3

  6. Slide 6: Existing Resources

    Horseshoe Lights Project – Existing Resources For personal use only Mineral Resource Estimate as at 30 June 2013 (using 0.5% Cu in-situ cut-off grade): Tonnage Cu Au Ag Cu metal Au metal Ag metal Category (Mt) (%) (g/t) (g/t) (tonnes) (oz) (oz) In-Situ Resources Measured 1.73 1.04 0.0 0.5 18,000 1,9

  7. Slide 7: The Next Stage

    Horseshoe Lights Project – The Next Stage For personal use only Targeting production threshold of +200,000 tonnes of contained copper by:  Increasing the existing Mineral Resource:  Selectively drill test for extensions of high grade copper/gold mineralisation as well as gaps in the resource model

  8. Slide 8: Planned Drilling

    Horseshoe Lights Project – Planned Drilling Planned drilling of the Main Zone – For personal use only  no drilling into this part of the Main Zone by HOR to date.  focusing on the zone 0 - 100m below the existing pit floor (i.e. open pit potential).  historical drilling information indicates that

  9. Slide 9: Planned Drilling - Increasing the Mineral Resource

    Horseshoe Lights Project – Planned Drilling For personal use only Increasing the Mineral Resource

  10. Slide 10: Planned Drilling

    Horseshoe Lights Project – Planned Drilling Planned drilling east of pit will target – For personal use only  potential mineralisation east and south of the latest drilling success in RC1101 (32m @ 1.8% Cu).  major mapped NE-SW fault interpreted to have cut high grade Main Zone at south end of pit

  11. Slide 11: Planned Drilling

    Horseshoe Lights Project – Planned Drilling Planned drilling in old Tailings Dam For personal use only area –  contact between Ravelstone Formation and Narracoota Formation lies in the vicinity of the old tailings dam.  area under old tailings dam has never been drill tested.  historic geological

  12. Slide 12: Planned Drilling

    Horseshoe Lights Project – Planned Drilling  RC358 recently drilled to test a DDIP For personal use only anomaly 800m SE of the mine in the right geological position for a possible repetition of Horseshoe Lights style Cu/Au mineralisation.  Hole intersected copper zone – zone needs further testing

  13. Slide 13: Planned Drilling

    Horseshoe Lights Project – Planned Drilling  Narracoota Formation (volcanics) For personal use only lies beneath Ravelstone Formation at varying depths (RNI hit volcanics at ~90m depth in latest drilling at Forrest, ~20km W of HSL).  Very limited shallow (<50m) RAB drilling completed in 1990’s on

  14. Slide 14: Kumarina Project Overview

    Kumarina Project • Historical workings For personal use only extend over nearly 5km including the old Kumarina and Rinaldi Copper Mines. • N-S faults and NE-SW shear zones are considered to be most prospective for enrichments of copper mineralisation. • Major Dolerite sills across area - associated

  15. Slide 15: Kumarina Project - Mineral Resource Estimate, Rinaldi Prospect

    Kumarina Project  Shallow Mineral Resource at the Rinaldi Prospect of 835,000t @ 1.3% Cu containing For personal use only 10,600 t Cu metal (0.5% Cu cut-off).  Cu mineralisation lies within N-S fault zone, predominately in diorite/dolerite but also in sediments within the fault zone.  Lower doler

  16. Slide 16: Kumarina Project - The Next Stage

    Kumarina Project – The Next Stage  Explore for New Cu Mineralisation: For personal use only  Drill untested exploration target around old shafts at Snell North Prospect  Drill the Kumarina Deeps Prospect using $100,000 EIS Grant Co-funding assistance  Geophysics and ground reconnaissance over ne

  17. Slide 17: Kumarina Project - Planned Drilling

    Kumarina Project – Planned Drilling For personal use only • Recent field work has identified historical Cu workings (3 shafts) at the Snell North Prospect. • Shafts are ~350m apart along strike. • Ground around workings has colluvium/alluvium cover with no significant outcrop. • Gravity Survey highl

  18. Slide 18: Kumarina Project - Planned Drilling

    Kumarina Project – Planned Drilling View down main vertical shaft at Snell North For personal use only Prospect • Insert Picture here Copper in mullock from workings Main workings at Snell North Untested Exploration Target – Snell North Prospect

  19. Slide 19: Use of Funds / Indicative Timeline

    Use of Funds / Indicative Timeline* Activity Type Metres Cost Equity/ EIS HOR Cash Jul Aug Sep Oct Nov Dec For personal use only 2014 2014 2014 2014 2014 2014 ($000) Funded Outlay ($000) ($000) KUMARINA PROJECT Snell North/Rinaldi RC 2,000 100 35 65 Kumarina Deeps RC 2,500 200 100 100 E52/2930 - Geo

  20. Slide 20: Summary

    Summary For personal use only  148,000t Cu metal inventory  Highly prospective geological settings which remain untested across large areas  Focus at Horseshoe Lights is to build the Mineral Resource (targeting +200,000t contained copper) and drill test for new zones of Cu/Au mineralisation  New

  21. Slide 21: Mineral Resource Estimation

    Mineral Resource Estimation For personal use only Horseshoe Lights Project In-Situ Mineral Resource Estimation As at 30 June 2013 Type Category Tonnage Cu Au Ag Cu metal Au metal Ag metal (Mt) (%) (g/t) (g/t) (tonnes) (oz) (oz) Measured 0.18 1.25 0.1 0.5 2,300 500 2,800 Indicated 0.15 0.94 0.0 0.4 1

  22. Slide 22: Mineral Resource Estimation - Rinaldi Prospect

    Mineral Resource Estimation For personal use only Kumarina Project - Rinaldi Prospect Mineral Resource Estimation As at 30 June 2013 Cut-off Resource grade Tonnes Cu (%) Cu (lbs) Cu (t) Category Cu (%) 519,000 1.24 14,243,000 6,500 Measured 444,000 0.91 8,922,000 4,050 Indicated 0.25 247,000 0.6 3,2

  23. Slide 23: Competent Persons Statement

    Competent Persons Statement For personal use only The information in this presentation to which this statement is attached that relates to the Horseshoe Lights Surface Resources and Exploration Results is based on information compiled by Mr Geoff Willetts, who is a Member of the Australian Institute

  24. Slide 24: Contact Details

    CONTACT DETAILS Neil Marston For personal use only Managing Director Horseshoe Metals Limited (ASX : HOR) 6/11 Colin Grove, West Perth WA 6005 Ph (08) 9481 5866 Mob: 0427 188 768