Horseshoe Metals Limited · ASX:HOR

Horseshoe Metals — RIU Explorers Conference 2013

27 slides from Horseshoe Metals's conference presentation, Feb 14, 2013

  1. Slide 1: Investor Presentation - RIU Explorers Conference

    For personal use only INVESTOR PRESENTATION RIU EXPLORERS CONFERENCE 13-14 FEBRUARY 2013

  2. Slide 2: Disclaimer

    Disclaimer For personal use only This presentation is not a prospectus nor an offer for securities in any jurisdiction nor a securities recommendation. The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment de

  3. Slide 3: The Investment Case

    The Investment Case For personal use only Horseshoe Metals Limited has: Quality copper projects in a highly prospective region of Western Australia Projects which have near term production potential Multiple exploration targets within project areas provide the potential for fresh copper/gold disc

  4. Slide 4: Corporate Summary

    Corporate Summary For personal use only Capital Structure Ordinary Shares 75.9 M Options 22.0 M Market Capitalisation $12.1 M (undiluted @ 16 cents per share) Cash at Bank (31/12/2012) $1.1 M Options (20c 30/06/13) 5.8 M Options (35c 25/05/13) 5.4 M Options (45c 25/05/14) 5.4 M Options (60c 25/05/15

  5. Slide 5: Projects Overview

    Projects Overview For personal use only Horseshoe Lights Project • located 75km west of DeGrussa Cu/Au mine • includes the Horseshoe Lights Cu/Au mine • significant under-explored land holding over the highly prospective Narracoota Formation Kumarina Project • located 100km north of DeGrussa Cu/Au m

  6. Slide 6: Horseshoe Lights Overview

    Overview For personal use only • Volcanogenic Massive Sulphide (VMS) deposit located in the Narracoota Formation • Copper DSO production - 110,691 t @ 25-30% Cu • Mine operations suspended in 1994 • Open pit is approximately 215m deep • Historical drilling indicates that Copper mineralisation extend

  7. Slide 7: Mineral Resource Estimate

    Mineral Resource Estimate For personal use only JORC Measured, Indicated and Inferred Mineral Resource estimation as at 31 December 2011:  8.6 Mt @ 1.06% Cu and 0.13g/t Au containing 91,000 t Cu metal & 37,400 oz Au (0.5% cutoff)  2012 drilling results from 65 RC and diamond drill holes (10,181m)

  8. Slide 8: 2012 Drilling – Specialist Rig

    2012 Drilling – Specialist Rig For personal use only Horseshoe Lights Project

  9. Slide 9: 2012 Drilling – Shallow High Grade Copper Hits

    2012 Drilling – Shallow High Grade Copper Hits For personal use only Horseshoe Lights Project

  10. Slide 10: Cross Sections – Consistent widths North of Pit

    Cross Sections – Consistent widths North of Pit For personal use only Horseshoe Lights Project

  11. Slide 11: Development Activities

    Development Activities For personal use only • JORC Resource Update. • Mining Study/Preliminary Economic Assessment. • Feasibility Study – scope of any work will be dependent upon the results of Mining Study Development Options • Oxide Ore/Tailings and Stockpiles: Vat/Heap Leach SX/EW Cu Cathode • S

  12. Slide 12: Exploration Strategy

    Exploration Strategy Our hypothesis: The high grade For personal use only ore body at Horseshoe Lights is not unique and that additional high grade zones exist nearby. Targeting Strategy: The most prospective horizon for repetitions of high grade mineralisation is considered to be near the contact b

  13. Slide 13: 2013 Drilling – Main Zone Extensions

    2013 Drilling – Main Zone Extensions For personal use only Horseshoe Lights Project

  14. Slide 14: 2013 Drilling – Main Zone Extensions

    2013 Drilling – Main Zone Extensions For personal use only Horseshoe Lights Project

  15. Slide 15: 2013 Drilling – Other Targets (Area 1)

    2013 Drilling – Other Targets For personal use only Area 1:  identified DDIP anomaly  co-inciding gravity anomaly  anomalous Au and Cu in 1980’s shallow drilling (up to 2m @ 20 g/t Au).  insufficient drilling at depth  favourable geological setting - fold nose  near the contact between Narraco

  16. Slide 16: 2013 Drilling – Other Targets (Area 2)

    2013 Drilling – Other Targets For personal use only Area 2:  identified DDIP anomaly  co-inciding gravity anomaly  several 1980’s shallow holes only assayed for Au, Cu noted in some logs  insufficient drilling at depth  favourable geological setting - interpreted shear zone  near the contact b

  17. Slide 17: 2013 Drilling – Other Targets (Area 3)

    2013 Drilling – Other Targets For personal use only Area 3:  identified DDIP anomaly  insufficient drilling at depth  favourable geological setting – shears and folding  Modelling shows anomaly to be near the contact between Narracoota Formation and Ravelstone Formation Horseshoe Lights Project

  18. Slide 18: 2013 Drilling – Other Targets (Area 4)

    2013 Drilling – Other Targets For personal use only Area 4:  anomalous Au & Cu in shallow historical drill holes.  insufficient drilling at depth  favourable geological setting – folding and fault zone  near the contact between Narracoota Formation and Ravelstone Formation Horseshoe Lights Proje

  19. Slide 19: Kumarina Overview

    Overview For personal use only Copper discovered in 1913 Historical workings extend over nearly 5km including the old Kumarina and Rinaldi Copper Mines. Very little modern exploration undertaken on the project area before Horseshoe Metals Limited work. OLD RINALDI HEADFRAME Kumarina Project

  20. Slide 20: Regional Geology

    Regional Geology For personal use only • Main workings at Kumarina & Rinaldi shafts are associated with N-S faults. • Multiple other N-S faults identified by aeromagnetic survey under shallow colluvium cover. • These N-S faults and NE-SW shear zones are considered to be prospective for enrichments o

  21. Slide 21: Drilling – Rinaldi Prospect

    Drilling – Rinaldi Prospect • Cu intersected over 700m strike length For personal use only • Open along strike and down dip • Maiden JORC Resource Estimate – Feb 2013 Kumarina Project

  22. Slide 22: Copper Mineralisation – Rinaldi Prospect

    Copper Mineralisation – Rinaldi Prospect For personal use only • Cu mineralisation generally occurs as pyrite/chalcopyrite blebs and veinlets within quartz veins hosted within the fault zone. • Other copper minerals are evident in the form of bornite and chalcocite Kumarina Project

  23. Slide 23: Exploration Targets

    Exploration Targets • Recent results from soil For personal use only geochemistry survey have identified several high order copper anomalies, many of which are co-incident with structural features. • Co-incident soil anomaly identified over Kumarina Deeps Prospect aeromagnetic anomaly • Horseshoe se

  24. Slide 24: Upcoming Activities

    Upcoming Activities For personal use only Horseshoe Lights Project Development • JORC Resource Update. • Mining Study (Preliminary Economic Assessment). • Preliminary Feasibility Study (subject to Mining Study outcomes) Exploration • Drilling:  down dip and down plunge of main zone  geophysical ta

  25. Slide 25: Highlights

    Highlights For personal use only  Significant and growing Cu Inventory  Near term production potential  Horseshoe Lights & Kumarina both have excellent exploration potential  Strong strategic investor group

  26. Slide 26: Mineral Resource Estimation Table

    Mineral Resource Estimation Table 1 For personal use only Horseshoe Lights Project Mineral Resource Estimation As at 31 December 2011 Measured Indicated Inferred TOTAL Cut-off Copper Gold Copper Gold Copper Gold Copper Gold Tonnes Grade Grade Tonnes Grade Grade Tonnes Grade Grade Tonnes Grade Grade

  27. Slide 27: Competent Persons Statement

    Competent Persons Statement For personal use only The information in this presentation to which this statement is attached that relates to Exploration Results is based on information compiled by Mr Geoff Willetts, who is a Member of the Australian Institute of Geoscientists. Geoff Willetts is a full

Horseshoe Metals — RIU Explorers Conference 2013 on 6ix