Kingston Resources Ltd. · ASX:KSN
Kingston Resources — Investor Presentation (November 2020)
25 slides from Kingston Resources's investor presentation, Nov 24, 2020
Slide 1: Rising Gold Developer in the Asia-Pacific
For personal use only Rising GOLD DEVELOPER in the Asia-Pacific Misima Gold Project November 2020 Pre-Feasibility Study, Maiden Ore Reserve and Resource upgrade 24 November, 2020 130,000ozpa, A$1,159/oz AISC Andrew Corbett, Managing Director 17-year mine life Strong financial returns ASX: KSN
Slide 2: Disclaimer
Disclaimer Forward Looking Statements Certain statements contained in this presentation, including information as to the future financial or operating performance of Kingston Resources Limited (“KSN”) and its projects, are forward looking For personal use only statements. Such forward looking statem
Slide 3: Gold Explorer & Developer – ASX Listed: KSN
Gold Explorer & Developer – ASX Listed: KSN For personal use only MISIMA GOLD PROJECT (KSN: 100%1) PNG • Resource: 3.6Moz Au & 24.2Moz Ag2 Misima • Reserve: 1.35Moz Au & 6.5Moz Ag2 • Pre-Feasibility Study complete: • Large scale: 130,000oz pa • Low cost: AISC $1,159/oz Livingstone • Long life: 17-ye
Slide 4: Capital Structure, Board & Management
Capital Structure, Board & Management For personal use only Share Price Board & Management Share Price – 12-month Performance A$0.25 Mick Wilkes Chairman (1 Dec 2020) Tony Wehby Non-Executive Director Issued Shares Stuart Rechner Non-Executive Director Andrew Corbett Managing Director 231M Chris Dre
Slide 5: Misima Gold Project: Overview and Key Statistics
Misima Gold Project: Overview and Key Statistics Misima Island PAPUA NEW GUINEA For personal use only • Over 130 years of gold production • Over 7Moz of endowment to date • 600km east of Port Moresby, Milne Bay Province Misima Resource & Reserve released 24 Nov 2020 • Resource: 144Mt @ 0.78g/t Au fo
Slide 6: Misima Pre-Feasibility Study
Misima Pre-Feasibility Study • PFS completed November 2020 For personal use only • Development underpinned by 3.6Moz Resource1 and 1.35Moz Reserve1 • Leveraging off 15 years of previous production history: • New plant largely replicates successful Placer design • Haul roads, port, airstrip in place
Slide 7: Misima Pre-Feasibility Study
Misima Pre-Feasibility Study • Misima Gold Project PFS delivers exceptional PFS – Production Target Summary & Economics For personal use only economics1,2: LOM Years 17 • 17-year mine life at 130,000oz per annum annual average gold LOM Gold production oz 2,133,157 production, 5.5Mtpa mining and proc
Slide 8: Misima Pre-Feasibility Study
Misima Pre-Feasibility Study • Low-cost mining and processing are key advantages at PFS Production Target – Capital & Operating Costs For personal use only Misima Capital Costs • Key drivers of the forecast low operating costs: 5.5Mtpa Processing Plant A$m 99.0 • Coarse grind: P80 passing at 250 mic
Slide 9: Misima Pre-Feasibility Site Layout
Misima Pre-Feasibility Site Layout • Utilising previous process plant location PFS – Processing Plant For personal use only • Leveraging existing land topography and previous footprint • Excellent access to current Misima Island facilities such as roads, airport, and ports • Simple layout utilising
Slide 10: Misima – Proven and Simple Process Flowsheet
Misima – Proven and Simple Process Flowsheet Misima PFS – Processing Plant For personal use only www.kingstonresources.com.au 10
Slide 11: Umuna Deposit: 3.3Moz Resource
Umuna Deposit: 3.3Moz Resource Umuna Resource: 133Mt @ 0.78g/t Au, 5.3g/t Ag For personal use only Exceptional upside potential: • Umuna open pit previously produced over 3.5Moz Au • Resource is drill constrained with outstanding potential to increase ounces at depth and to the north • Shallow drill
Slide 12: Umuna Deposit: High-Grade Structures
Umuna Deposit: High-Grade Structures Umuna hosts a number of high grade structures For personal use only inside a broader mineralised corridor. Intersections include1: • 84m @ 7.20g/t Au • 20m @ 17.04g/t Au • 36m @ 8.50g/t Au • 64m @ 4.13g/t Au • 40m @ 6.49g/t Au • 78m @ 2.76g/t Au • 57m @ 3.39g/t A
Slide 13: Misima Exploration Strategy
Misima Exploration Strategy • Current 3.3Moz Umuna Resource is open at depth For personal use only and drill-constrained • Exploration focus remains on near-surface mineralisation and key exploration targets include: • Kobel & Maika: Historically mined by Placer with limited modern exploration since
Slide 14: Misima: Community Support the Key to Success
Misima: Community Support the Key to Success • 130-year history of artisanal mining For personal use only • Skilled resident workforce, with over 100 FIFO Misima residents • Kingston working closely with local landowners • Strong local support of Kingston’s program, residents keen to see mine re-ope
Slide 15: Misima: Active Work Program Advancing
Misima: Active Work Program Advancing 2021 Q1 Q2 Q3 Q4 For personal use only Resource & exploration drilling JORC Resource Mining studies update Environmental baseline work Project approvals Advancing development focus • Environmental baseline work ongoing, EIS activity to step up post PFS • Targeti
Slide 16: Livingstone Gold Project, WA (75%)
Livingstone Gold Project, WA (75%) • Kingsley prospect discovered in 2018 below auger soil anomaly For personal use only • Homestead Prospect contains a 49,000oz JORC 2004 Resource1, with shallow high-grade intersections including: • 18m @ 7.85g/t Au from 68m • 5m @ 20.5g/t Au from 3m • 7m @ 12.59g/
Slide 17: Peer Comparison
Peer Comparison For personal use only Notes: • EV calculated as market capitalisation as at 16 November 2020 plus net debt as at 30 Sept 2020 • Resource ounces used are Total Resources and include varying compositions of Measured, Indicated and Inferred. • Companies which have released a BFS/DFS are
Slide 18: Key Investment Takeaways
Key Investment Takeaways Kingston Resources’ vision is to become a significant new ASX-listed gold For personal use only producer operating in the Asia-Pacific region ✓ Exceptional large-scale production opportunity at the Misima Gold Project in PNG ✓ PFS provides an outstanding platform demonstrati
Slide 19: For personal use only
For personal use only Andrew Corbett Managing Director Chris Drew Chief Financial Officer P: +61 2 8021 7492 E: info@kingstonresources.com.au Kingston Resources Limited Suite 201/110 Pacific Highway, North Sydney, NSW 2060 www.kingstonresources.com.au ASX: KSN Research Coverage Canaccord Reg Spencer
Slide 20: Appendix: PNG – A large growing global commodities nation
Appendix: PNG – A large growing global commodities nation For personal use only • Proven mining jurisdiction • Successful mining track record over long term • Globally significant mining projects • Major global producer of gold and LNG • 2.3Moz pa Au production (15th largest global producer)1 • 9.5b
Slide 21: Appendix: Mineral Resources and Ore Reserves
Appendix: Mineral Resources and Ore Reserves For personal use only Ore Reserves Mt Au g/t Ag g/t Au koz Ag koz Ewatinona Probable 3.5 0.84 2.6 95 291 Ewatinona Total 3.5 0.84 2.6 95 291 Umuna Probable 44.8 0.87 4.3 1,251 6,191 Umuna Total 44.8 0.87 4.3 1,251 6,191 Probable 48.3 0.87 4.2 1,347 6,482
Slide 22: Appendix: Top Australian and PNG gold deposits
Appendix: Top 25 Australian and PNG gold deposits Top 25 Australian and PNG gold deposits Total Resource1 Ore Grade Contained Au For personal use only No. Location Mine Owner mt g/t Moz 1 PNG Lihir Newcrest 690 2.30 50.0 2 Australia Cadia/Ridgeway Newcrest 3,170 0.37 38.0 3 PNG Wafi-Golpu Newcrest/H
Slide 23: Appendix: Historical Profitable Production, Ultra-Low Costs
Appendix : Historical Profitable Production, Ultra-Low Costs Misima statistics from Placer Pacific Annual Reports 1989 – 2004 1 • 130-year mining history – gold first discovered in 1889 For personal use only Reserves at end of 1990 1.9Moz Reserve grade at end of 1990 1.26g/t Au • Misima open pit ope
Slide 24: Appendix: Misima Production Advantage
Appendix: Misima Production Advantage PAPUA NEW GUINEA: HISTORICAL MINING PARAMETERS: For personal use only • Proven geological domain • < 400m above sea level • Large scale Au + Cu projects • Low strip • PNG is currently 15th largest gold • Low cost drill & blast producer globally, 60 tonnes pa • L
Slide 25: Appendix: Data Sources
Appendix: Data Sources EV/Oz and Total Resource Charts – Slide 16 - Resource data for the included companies is sourced from the following announcements or reports Company Release Date Announcement/Report For personal use only Anova Metals 18 Oct 2019 2019 Annual Report Apollo Consolidated 28 April