  1. Slide 1: A compelling platinum story

    Slide 1: A compelling platinum story

    A compelling platinum story Investor presentation February 2012

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer The information presented in this presentation is of a general nature and the forward looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

  3. Slide 3: About RBPlat

    Slide 3: About RBPlat

    ROYAL BAFOKENG About RBPlat PLATINUM

  4. Slide 4: About Royal Bafokeng Platinum (RBPlat)

    Slide 4: About Royal Bafokeng Platinum (RBPlat)

    About Royal Bafokeng Platinum (RBPlat) • Black-owned and controlled, mid-tier PGMs producer • Assets located on Western Limb of Bushveld Complex, South Africa • 67% interest in Bafokeng Rasimone Platinum Mine (BRPM), unincorporated JV with Anglo American Platinum • Boschkoppie mine (operating since

  5. Slide 5: Prime location on the Western Limb

    Slide 5: Prime location on the Western Limb

    Prime location on the Western Limb 4

  6. Slide 6: A long and proud history

    Slide 6: A long and proud history

    A long and proud history Royal Bafokeng Discussions between Merensky opencast BRPM JV restructuring; JSE listing completed Nation purchases RBN and AngloPlat to commences RBPlat obtains 67% interest land form JV 1860s 1925 1990s 1997 1998 2002 Dec 2009 Jan 2010 Nov 2010 2011 Platinum discovered in S

  7. Slide 7: Ownership structure

    Slide 7: Ownership structure

    Ownership structure Royal Bafokeng Holdings (RBH) Anglo American Platinum Public Investors 100% 100% Royal Bafokeng Platinum Holdings Rustenburg Platinum Mines 30.25% 57.13% 12.62% 33% 100% Royal Bafokeng Resources 67% Bafokeng Rasimone Platinum Mine Project expansion Operations Styldrift I BRPM Min

  8. Slide 8: Our strategy

    Slide 8: Our strategy

    Our strategy • Achieve operational excellence at BRPM (optimising volumes and reducing costs) • Grow organically through Styldrift • Bring Styldrift II forward as an expansion project • Build flexibility in the business with co-extraction • Pursue value-enhancing acquisitions and synergies 7

  9. Slide 9: Our business

    Slide 9: Our business

    B @ < 7) S 2 i s oO www.bafokengplatinum.co.za

  10. Slide 10: Well-established shallow Merensky producer on Western Limb

    Slide 10: Well-established shallow Merensky producer on Western Limb

    Well-established shallow Merensky producer on Western Limb, well-developed infrastructure • 12 years of operation • well-understood, defined geology • sophisticated 3D seismic exploration • Shallow depth • Boschkoppie mine: twin decline shaft complex at 500m • Styldrift I project: new twin vertical

  11. Slide 11: Well-established shallow Merensky producer on Western Limb

    Slide 11: Well-established shallow Merensky producer on Western Limb

    Well-established shallow Merensky producer on Western Limb, well-developed infrastructure • Focus on Merensky, with significant quality UG2 • Merensky production growth at Styldrift I from 2017 • UG2 to gradually replace Merensky production from 2014 at Boschkoppie south shaft, and from 2025 at nort

  12. Slide 12: Attractive margins with scope for cost reduction

    Slide 12: Attractive margins with scope for cost reduction

    Attractive margins with scope for cost reduction • High grade, attractive prill split • significant base metal revenue contribution (nickel 11% in 2010) • Improvement opportunities • continued optimisation of production volumes • cost optimisation through expenditure review and analysis • leveraging

  13. Slide 13: Poised to grow organically and through consolidation

    Slide 13: Poised to grow organically and through consolidation

    Poised to grow organically and through consolidation • High-grade resource base with organic growth potential • Supportive, well capitalised shareholders • Leading internal growth projects on last remaining shallow Merensky reef • increase in production planned with Styldrift I project (2.7mtpa) • o

  14. Slide 14: Poised to grow organically and through consolidation

    Slide 14: Poised to grow organically and through consolidation

    Poised to grow organically and through consolidation Value-enhancing transactions with Impala • Key commercial terms agreed on: • 7-year mining arrangement with Impala via Impala’s #6 & 8 shafts Wesizwe • resource of 780koz (4E) of UG2 Project 2 • 30-year mining arrangement with Wesizwe Impala via I

  15. Slide 15: Our operations

    Slide 15: Our operations

    wn < ° zs G i 7) 2 ° i s oO www.bafokengplatinum.co.za

  16. Slide 16: Geology, layout and access

    Slide 16: Geology, layout and access

    Geology, layout and access BRPM layout Shaft layout Vent shaft (surface to level 9) Chairlift decline Belt decline Material decline Level 9 Vertical dams Level 10 Source: Company Orebody access North Shaft South Shaft Sample prep Ore conveyed to plant Belt riding 15

  17. Slide 17: Well-developed infrastructure

    Slide 17: Well-developed infrastructure

    Well-developed infrastructure North Shaft South Shaft Concentrator Plant ISA Mill ISA mill position CCO 16

  18. Slide 18: Resource optimisation strategy and exploration

    Slide 18: Resource optimisation strategy and exploration

    Resource optimisation strategy and exploration • Geology 3D seismic survey • well-understood, high-quality orebody • total drillholes: 5,327 • intersection points: 7,787 • total drilled metres: 1,200km • aeromagnetic and 3D seismic surveys Exploration drilling Aeromagnetic survey 17

  19. Slide 19: Resources and reserves

    Slide 19: Resources and reserves

    Resources and reserves 100% Inclusive Resource RBPlat 67% Description Mt 4E g/t 4eMoz Mt 4E g/t 4eMoz Boschkoppie Merensky Measured 15.15 7.42 3.62 10.15 7.42 2.42 Indicated 11.45 6.94 2.55 7.67 6.94 1.71 Inferred 8.05 7.63 1.98 5.39 7.63 1.32 Merensky Total 34.65 7.31 8.14 23.22 7.31 5.46 UG2 Measu

  20. Slide 20: Production

    Slide 20: Production

    Production • Smooth operational handover from BRPM recovery (4E) % 89.0 4 January 2010 86.3 86.4 87.8 87.0 86.1 • Operational strategy aimed at optimising 85.0 84.1 throughput and revenue 83.0 % • tonnes milled 81.0 79.0 • improved stoping crew efficiency 77.0 • head grade 75.0 2007 2008 2009 2010 H

  21. Slide 21: Operating costs

    Slide 21: Operating costs

    Operating costs H1 2011 Operating labour Employees 6,398 On-mine cash cost/tonne milled R/t 765 On-mine cash cost/PGM oz delivered R/oz (4E) 6,306 On-mine cash cost/Pt oz delivered R/oz (Pt) 9,732 20

  22. Slide 22: Progress at Styldrift

    Slide 22: Progress at Styldrift

    ROYAL BAFOKENG Progress at Styldrift VY LATINUN

  23. Slide 23: Styldrift I Project

    Slide 23: Styldrift I Project

    Styldrift I Project Capital budget - nominal Capital cash flow – nominal ZAR Millions Description Unit Mining Concentrator Total 3,000 2,500 Authorised & Rm 6,289 1,422 7,711 contingency 2,000 1,500 Escalation Rm 3,153 938 4,091 1,000 Total nominal Rm 9,442 2,360 11,802 500 Latest cost forecast Rm 9

  24. Slide 24: Styldrift I

    Slide 24: Styldrift I

    Styldrift I Project Timetable • Progress (October 2011) • Planned % Complete: 24.55% • Actual % Complete: 24.96% 23

  25. Slide 25: Styldrift I

    Slide 25: Styldrift I

    Styldrift I • Legal and Permitting: • Mining Right – granted in March 2008 • EMP - approved in March 2008 • Water User Licence – approved in April 2010 • Legal Appointments - all in place • Social and Labour Plan - approved in September 2009 24

  26. Slide 26: Styldrift I production profile

    Slide 26: Styldrift I production profile

    Styldrift I production profile kt Styldrift I production 3,000 2,500 2,000 1,500 1,000 500 - 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Styldrift I Merensky 25

  27. Slide 27: Further organic growth in Styldrift II

    Slide 27: Further organic growth in Styldrift II

    Further organic growth in Styldrift II • Styldrift II project area • resource area ± 23 million m2 • depth 900m — 1,400m, average dip 90 • average Merensky/UG2 middling 35m • Potential size of investment similar to Styldrift I (+R10 billion) • Opportunity will be evaluated through: • study consistin

  28. Slide 28: Financial performance

    Slide 28: Financial performance

    Financial performance www.bafokengplatinum.co.za ===

  29. Slide 29: Key features for 6 months ended 30 June 2011

    Slide 29: Key features for 6 months ended 30 June 2011

    Key features for 6 months ended 30 June 2011 • One million fatality-free shifts achieved by June 2011 • Conclusion of three-year wage agreement • Production steady at 142,100 PGMs (4E) despite challenging environment • Concentrator recoveries improve by 1.6% to 87.27% • BRPM revenue up by 3% to R1.5

  30. Slide 30: Key financial performance indicators

    Slide 30: Key financial performance indicators

    Key financial performance indicators H1 2011 Average basket price (R/Pt oz) 15,730 Revenue (Rm) 1,510 Cost of sales (Rm) 1,171 Gross profit (Rm) 339 Operating profit (Rm) 316 EBITDA (Rm) 546 Net profit after tax (Rm) 249 Headline earnings (Rm) 172 HEPS (Rand per share) 1.05 Dividend per share (Rand

  31. Slide 31: Key financial performance indicators

    Slide 31: Key financial performance indicators

    Key financial performance indicators H1 2011 Cash generated by operations (Rm) 390 Cash, net of debt (incl. pref share investment) (Rm) 1,290 Capex (Rm) 592 Gross profit margin (%) 22.5 EBITDA margin (%) 36.1 NAV (Rand per share) 68.1 30

  32. Slide 32: Sales volumes by metal and average prices achieved

    Slide 32: Sales volumes by metal and average prices achieved

    Sales volumes by metal and average prices achieved H1 2011 Average price Metals contribution to H1 2011 revenue Sales achieved* volume ($) 2.35% 0.35% 9.57% Platinum (oz) 92,135 1,751/oz 0.86% 0.99% Palladium (oz) 37,817 754/oz 6.01% Gold (oz) 4,940 1,497/oz 2.99% Rhodium (oz) 7,208 2,059/oz Iridium

  33. Slide 33: Breakdown of cost of sales

    Slide 33: Breakdown of cost of sales

    Breakdown of cost of sales Breakdown of H1 2011 COS (%) H1 2011 7.5% R million 35.1% Labour 331 31.6% Utilities 63 Contractor costs 180 6.7% Materials and other mining costs 298 19.1% Other 69 Labour Utilities Contractors Cost of sales (excluding depreciation 941 Materials and other mining costs and

  34. Slide 34: Our investment case

    Slide 34: Our investment case

    Our investment case 33

  35. Slide 35: A compelling story

    Slide 35: A compelling story

    A compelling story • Compelling sector with strong demand and supply fundamentals • Well-established, shallow Western Limb Merensky producer with well-developed infrastructure • Attractive margin operations with scope for cost reduction • Experienced management team with clear focus and operating fl

  36. Slide 36: Contact details

    Slide 36: Contact details

    Contact details Lindiwe Montshiwagae Investor Relations Manager Royal Bafokeng Platinum The Pivot, No 1 Monte Casino Boulevard, Block C, Floor 4, Fourways, 2021 Tel: +27 (0) 10 590 4517 Fax: +27 (0) 86 219 5131 Mobile: +27 (0) 82 920 7803 Email: lindiwe@bafokengplatinum.co.za