Royal Bafokeng Platinum — Citi 8th Annual (February 2012)
36 slides from Royal Bafokeng Platinum's conference presentation, February 2012

Slide 1: A compelling platinum story
A compelling platinum story Investor presentation February 2012

Slide 2: Disclaimer
Disclaimer The information presented in this presentation is of a general nature and the forward looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

Slide 3: About RBPlat
ROYAL BAFOKENG About RBPlat PLATINUM

Slide 4: About Royal Bafokeng Platinum (RBPlat)
About Royal Bafokeng Platinum (RBPlat) • Black-owned and controlled, mid-tier PGMs producer • Assets located on Western Limb of Bushveld Complex, South Africa • 67% interest in Bafokeng Rasimone Platinum Mine (BRPM), unincorporated JV with Anglo American Platinum • Boschkoppie mine (operating since

Slide 5: Prime location on the Western Limb
Prime location on the Western Limb 4

Slide 6: A long and proud history
A long and proud history Royal Bafokeng Discussions between Merensky opencast BRPM JV restructuring; JSE listing completed Nation purchases RBN and AngloPlat to commences RBPlat obtains 67% interest land form JV 1860s 1925 1990s 1997 1998 2002 Dec 2009 Jan 2010 Nov 2010 2011 Platinum discovered in S

Slide 7: Ownership structure
Ownership structure Royal Bafokeng Holdings (RBH) Anglo American Platinum Public Investors 100% 100% Royal Bafokeng Platinum Holdings Rustenburg Platinum Mines 30.25% 57.13% 12.62% 33% 100% Royal Bafokeng Resources 67% Bafokeng Rasimone Platinum Mine Project expansion Operations Styldrift I BRPM Min

Slide 8: Our strategy
Our strategy • Achieve operational excellence at BRPM (optimising volumes and reducing costs) • Grow organically through Styldrift • Bring Styldrift II forward as an expansion project • Build flexibility in the business with co-extraction • Pursue value-enhancing acquisitions and synergies 7

Slide 9: Our business
B @ < 7) S 2 i s oO www.bafokengplatinum.co.za

Slide 10: Well-established shallow Merensky producer on Western Limb
Well-established shallow Merensky producer on Western Limb, well-developed infrastructure • 12 years of operation • well-understood, defined geology • sophisticated 3D seismic exploration • Shallow depth • Boschkoppie mine: twin decline shaft complex at 500m • Styldrift I project: new twin vertical

Slide 11: Well-established shallow Merensky producer on Western Limb
Well-established shallow Merensky producer on Western Limb, well-developed infrastructure • Focus on Merensky, with significant quality UG2 • Merensky production growth at Styldrift I from 2017 • UG2 to gradually replace Merensky production from 2014 at Boschkoppie south shaft, and from 2025 at nort

Slide 12: Attractive margins with scope for cost reduction
Attractive margins with scope for cost reduction • High grade, attractive prill split • significant base metal revenue contribution (nickel 11% in 2010) • Improvement opportunities • continued optimisation of production volumes • cost optimisation through expenditure review and analysis • leveraging

Slide 13: Poised to grow organically and through consolidation
Poised to grow organically and through consolidation • High-grade resource base with organic growth potential • Supportive, well capitalised shareholders • Leading internal growth projects on last remaining shallow Merensky reef • increase in production planned with Styldrift I project (2.7mtpa) • o

Slide 14: Poised to grow organically and through consolidation
Poised to grow organically and through consolidation Value-enhancing transactions with Impala • Key commercial terms agreed on: • 7-year mining arrangement with Impala via Impala’s #6 & 8 shafts Wesizwe • resource of 780koz (4E) of UG2 Project 2 • 30-year mining arrangement with Wesizwe Impala via I

Slide 15: Our operations
wn < ° zs G i 7) 2 ° i s oO www.bafokengplatinum.co.za

Slide 16: Geology, layout and access
Geology, layout and access BRPM layout Shaft layout Vent shaft (surface to level 9) Chairlift decline Belt decline Material decline Level 9 Vertical dams Level 10 Source: Company Orebody access North Shaft South Shaft Sample prep Ore conveyed to plant Belt riding 15

Slide 17: Well-developed infrastructure
Well-developed infrastructure North Shaft South Shaft Concentrator Plant ISA Mill ISA mill position CCO 16

Slide 18: Resource optimisation strategy and exploration
Resource optimisation strategy and exploration • Geology 3D seismic survey • well-understood, high-quality orebody • total drillholes: 5,327 • intersection points: 7,787 • total drilled metres: 1,200km • aeromagnetic and 3D seismic surveys Exploration drilling Aeromagnetic survey 17

Slide 19: Resources and reserves
Resources and reserves 100% Inclusive Resource RBPlat 67% Description Mt 4E g/t 4eMoz Mt 4E g/t 4eMoz Boschkoppie Merensky Measured 15.15 7.42 3.62 10.15 7.42 2.42 Indicated 11.45 6.94 2.55 7.67 6.94 1.71 Inferred 8.05 7.63 1.98 5.39 7.63 1.32 Merensky Total 34.65 7.31 8.14 23.22 7.31 5.46 UG2 Measu

Slide 20: Production
Production • Smooth operational handover from BRPM recovery (4E) % 89.0 4 January 2010 86.3 86.4 87.8 87.0 86.1 • Operational strategy aimed at optimising 85.0 84.1 throughput and revenue 83.0 % • tonnes milled 81.0 79.0 • improved stoping crew efficiency 77.0 • head grade 75.0 2007 2008 2009 2010 H

Slide 21: Operating costs
Operating costs H1 2011 Operating labour Employees 6,398 On-mine cash cost/tonne milled R/t 765 On-mine cash cost/PGM oz delivered R/oz (4E) 6,306 On-mine cash cost/Pt oz delivered R/oz (Pt) 9,732 20

Slide 22: Progress at Styldrift
ROYAL BAFOKENG Progress at Styldrift VY LATINUN

Slide 23: Styldrift I Project
Styldrift I Project Capital budget - nominal Capital cash flow – nominal ZAR Millions Description Unit Mining Concentrator Total 3,000 2,500 Authorised & Rm 6,289 1,422 7,711 contingency 2,000 1,500 Escalation Rm 3,153 938 4,091 1,000 Total nominal Rm 9,442 2,360 11,802 500 Latest cost forecast Rm 9

Slide 24: Styldrift I
Styldrift I Project Timetable • Progress (October 2011) • Planned % Complete: 24.55% • Actual % Complete: 24.96% 23

Slide 25: Styldrift I
Styldrift I • Legal and Permitting: • Mining Right – granted in March 2008 • EMP - approved in March 2008 • Water User Licence – approved in April 2010 • Legal Appointments - all in place • Social and Labour Plan - approved in September 2009 24

Slide 26: Styldrift I production profile
Styldrift I production profile kt Styldrift I production 3,000 2,500 2,000 1,500 1,000 500 - 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Styldrift I Merensky 25

Slide 27: Further organic growth in Styldrift II
Further organic growth in Styldrift II • Styldrift II project area • resource area ± 23 million m2 • depth 900m — 1,400m, average dip 90 • average Merensky/UG2 middling 35m • Potential size of investment similar to Styldrift I (+R10 billion) • Opportunity will be evaluated through: • study consistin

Slide 28: Financial performance
Financial performance www.bafokengplatinum.co.za ===

Slide 29: Key features for 6 months ended 30 June 2011
Key features for 6 months ended 30 June 2011 • One million fatality-free shifts achieved by June 2011 • Conclusion of three-year wage agreement • Production steady at 142,100 PGMs (4E) despite challenging environment • Concentrator recoveries improve by 1.6% to 87.27% • BRPM revenue up by 3% to R1.5

Slide 30: Key financial performance indicators
Key financial performance indicators H1 2011 Average basket price (R/Pt oz) 15,730 Revenue (Rm) 1,510 Cost of sales (Rm) 1,171 Gross profit (Rm) 339 Operating profit (Rm) 316 EBITDA (Rm) 546 Net profit after tax (Rm) 249 Headline earnings (Rm) 172 HEPS (Rand per share) 1.05 Dividend per share (Rand

Slide 31: Key financial performance indicators
Key financial performance indicators H1 2011 Cash generated by operations (Rm) 390 Cash, net of debt (incl. pref share investment) (Rm) 1,290 Capex (Rm) 592 Gross profit margin (%) 22.5 EBITDA margin (%) 36.1 NAV (Rand per share) 68.1 30

Slide 32: Sales volumes by metal and average prices achieved
Sales volumes by metal and average prices achieved H1 2011 Average price Metals contribution to H1 2011 revenue Sales achieved* volume ($) 2.35% 0.35% 9.57% Platinum (oz) 92,135 1,751/oz 0.86% 0.99% Palladium (oz) 37,817 754/oz 6.01% Gold (oz) 4,940 1,497/oz 2.99% Rhodium (oz) 7,208 2,059/oz Iridium

Slide 33: Breakdown of cost of sales
Breakdown of cost of sales Breakdown of H1 2011 COS (%) H1 2011 7.5% R million 35.1% Labour 331 31.6% Utilities 63 Contractor costs 180 6.7% Materials and other mining costs 298 19.1% Other 69 Labour Utilities Contractors Cost of sales (excluding depreciation 941 Materials and other mining costs and

Slide 34: Our investment case
Our investment case 33

Slide 35: A compelling story
A compelling story • Compelling sector with strong demand and supply fundamentals • Well-established, shallow Western Limb Merensky producer with well-developed infrastructure • Attractive margin operations with scope for cost reduction • Experienced management team with clear focus and operating fl

Slide 36: Contact details
Contact details Lindiwe Montshiwagae Investor Relations Manager Royal Bafokeng Platinum The Pivot, No 1 Monte Casino Boulevard, Block C, Floor 4, Fourways, 2021 Tel: +27 (0) 10 590 4517 Fax: +27 (0) 86 219 5131 Mobile: +27 (0) 82 920 7803 Email: lindiwe@bafokengplatinum.co.za
Source: company website
More decks from Royal Bafokeng Platinum Ltd
Renaissance Capital Metals & Mining Conference 202118 slides · May 2021
H1 2020 Earnings Presentation39 slides · 2020
Merger or Acquisition (October 2019)11 slides · Oct 16, 2019
RBPlat Analyst Roundtable 201910 slides · Aug 6, 2019
Technical Presentation (February 2019)34 slides · Feb 1, 2019
Fact Sheet (2019)11 slides · 2019