Kenmare Resources H1 2015 Overview HMC & finished product production impacted by unprecedented flooding, causing significant power interruptions in H1 2015; HMC and total products down 25% vs H1 2014 Power stability expected to improve significantly following the installation of new power infrastruc
Slide 5: Key Performance Indicators
Key Performance Indicators Production (Half-Yearly) 000t Revenue & EBITDA (Half-Yearly) US$m 500 50 150 Ilmenite (LHS) Revenue EBITDA Zircon (RHS) 125 400 40 100 Ilmenite Tonnes '000 Zircon Tonnes '000 300 30 75 US$m 200 20 50 25 100 10 0 0 0 -25 H1 2013 H2 2013 H1 2014 H2 2014 H1 2015 H1 2013 H2 20
Slide 6: Summary Results
2 Summary Results 6
Slide 7: H1 2015 Income Statement Review
H1 2015 Income Statement Review H1 ‘15 H1 ‘14 Comment US$m US$m Revenue 73.9 81.2 Revenue down 9%; sales volumes increased by 3% but prices declined Cost of Sales & Opex (101.1) (99.1) Including a product inventory write down of US$8.6m Operating loss (27.2) (17.9) Net finance costs (18.1) (16.2) Pr
Slide 8: H1 2015 Revenue Review
H1 2015 Revenue Review Volume/Mix Movement Pricing Movement 500,000 25,000 $200 $2,000 Ilmenite price per Tonne (US$) + 1% - 56% Zircon Price per tonne (US$) 400,000 20,000 $150 $1,500 Ilmenite Shipments (tonnes) -18% Zircon Shipments (tonnes) 300,000 15,000 + 63% $100 $1,000 -2% 200,000 10,000 $50
Slide 9: H1 2015 Cash Operating Costs Review
H1 2015 Cash Operating Costs Review H1 2015 H1 2015 H1 2014 H1 2014 US$m US$m US$m US$m Cost of sales 91.9 82.8 Other operating costs 9.1 101.0 16.2 99.0 Freight (CIF charged to customers) (1.5) (4.2) Total costs less freight 99.5 94.8 Non-cash costs Depreciation 16.6 20.1 Share-based payments (0.8)
Slide 10: Half Yearly 2013 – 2015 Cash Operating Costs
Half Yearly 2013 – 2015 Cash Operating Costs Cost/t for total finished products (ilmenite, zircon & rutile) is US$197/t in H1 2015 Cost/t increased due to reduced production, as a result of severe weather interruptions Significantly reduced unit costs expected in H2 2015 with increased production an
Slide 11: Cost Efficiency Initiatives
Cost Efficiency Initiatives Cost savings realised in the following areas: Labour: Reduction in employee numbers and amendment to shift allowances implemented in H1 2015 Reduction in short-term contracts, catering cost reductions and lower recruitment costs Engineering: Efficiencies in plant maintena
Slide 12: H1 2015 Cash Operating Costs
H1 2015 Cash Operating Costs Other Logistics & Travel 5% 9% Production Overheads Distribution Costs 12% 5% Other Logistics & 11% Travel 8% Distribution Costs Production 5% Overheads 10% Fuel 12% H1 H1 2015 Fuel 6% 2014 Labour payroll 33% Labour payroll Power 6% Power 32% 9% Repairs & Repairs & Maint
Slide 13: Balance Sheet Review at June 2015
Balance Sheet Review at 30 June 2015 30/6/2015 31/12/2014 Comment on 2015 & movement US$m US$m Property, plant & equipment 849.6 865.2 US$1.0m capital additions Inventories 46.8 62.5 Reduced product stock volumes and NRV adjustment Trade & other receivables 30.2 28.1 Function of sales prior to perio
Slide 14: Group Debt
Group Debt Group reported debt at 30 June 2015: US$329.9m (30 June 2014: US$349.6m), after project loan amendment fee adjustment of US$15.5 million (30 June 2014: US$9.5 million). Average project interest rate at June 2015 was 9.1%. Senior: US$79.2 million, floating @ LIBOR + 3.5% to 5.3%, fixed @ 5
Slide 15: Appendix
(a) Appendix 15
Slide 16: Group Lenders at June 2015
Group Lenders at 30 June 2015 Loan Balance Maturity under April 2015 US$m Loan amendment Senior Project Loans AFDB 21.2 2021 Absa (ECIC) 23.9 2018 EAIF 2.6 2021 EIB 8.6 2021 FMO 8.6 2019 KfW IPEX-Bank (Hermes) 6.6 2018 KfW IPEX-Bank (MIGA) 7.7 2021 79.2 Subordinated Project Loans EIB 143.6 2021 EAIF
Slide 17: Reserves & Resources
Reserves & Resources Reserves & resources table as at 31 December 2014 Zones Category Ore (Mt) % THM* % Ilmenite in THM % Ilmenite in ore % Rutile in ore % Zircon in ore % Slime THM (Mt) Ilmenite (Mt) Rutile (Mt) Zircon (Mt) Reserves Namalope Proved 246 4.1 82 3.3 0.077 0.24 8.05 10 8.2 0.19 0.58 Na