Kenmare Resources Plc · LSE:KMR

Kenmare Resources — H1 2015 Earnings Presentation

17 slides from Kenmare Resources's earnings presentation, Aug 28, 2015

  1. Slide 1: H1 2015 Results

    H1 2015 Results LISTED PREMIUM 1

  2. Slide 2: Disclaimer

    Disclaimer This Presentation (the “Presentation”) has information or opinions on which it is significant in the context of the been prepared and issued by Kenmare based, or any other written or oral statements, estimates and projections Resources plc (the “Company” or information made available in c

  3. Slide 3: Overview

    1 Overview 3

  4. Slide 4: Kenmare Resources H1 2015 Overview

    Kenmare Resources H1 2015 Overview HMC & finished product production impacted by unprecedented flooding, causing significant power interruptions in H1 2015; HMC and total products down 25% vs H1 2014 Power stability expected to improve significantly following the installation of new power infrastruc

  5. Slide 5: Key Performance Indicators

    Key Performance Indicators Production (Half-Yearly) 000t Revenue & EBITDA (Half-Yearly) US$m 500 50 150 Ilmenite (LHS) Revenue EBITDA Zircon (RHS) 125 400 40 100 Ilmenite Tonnes '000 Zircon Tonnes '000 300 30 75 US$m 200 20 50 25 100 10 0 0 0 -25 H1 2013 H2 2013 H1 2014 H2 2014 H1 2015 H1 2013 H2 20

  6. Slide 6: Summary Results

    2 Summary Results 6

  7. Slide 7: H1 2015 Income Statement Review

    H1 2015 Income Statement Review H1 ‘15 H1 ‘14 Comment US$m US$m Revenue 73.9 81.2 Revenue down 9%; sales volumes increased by 3% but prices declined Cost of Sales & Opex (101.1) (99.1) Including a product inventory write down of US$8.6m Operating loss (27.2) (17.9) Net finance costs (18.1) (16.2) Pr

  8. Slide 8: H1 2015 Revenue Review

    H1 2015 Revenue Review Volume/Mix Movement Pricing Movement 500,000 25,000 $200 $2,000 Ilmenite price per Tonne (US$) + 1% - 56% Zircon Price per tonne (US$) 400,000 20,000 $150 $1,500 Ilmenite Shipments (tonnes) -18% Zircon Shipments (tonnes) 300,000 15,000 + 63% $100 $1,000 -2% 200,000 10,000 $50

  9. Slide 9: H1 2015 Cash Operating Costs Review

    H1 2015 Cash Operating Costs Review H1 2015 H1 2015 H1 2014 H1 2014 US$m US$m US$m US$m Cost of sales 91.9 82.8 Other operating costs 9.1 101.0 16.2 99.0 Freight (CIF charged to customers) (1.5) (4.2) Total costs less freight 99.5 94.8 Non-cash costs Depreciation 16.6 20.1 Share-based payments (0.8)

  10. Slide 10: Half Yearly 2013 – 2015 Cash Operating Costs

    Half Yearly 2013 – 2015 Cash Operating Costs Cost/t for total finished products (ilmenite, zircon & rutile) is US$197/t in H1 2015 Cost/t increased due to reduced production, as a result of severe weather interruptions Significantly reduced unit costs expected in H2 2015 with increased production an

  11. Slide 11: Cost Efficiency Initiatives

    Cost Efficiency Initiatives Cost savings realised in the following areas: Labour: Reduction in employee numbers and amendment to shift allowances implemented in H1 2015 Reduction in short-term contracts, catering cost reductions and lower recruitment costs Engineering: Efficiencies in plant maintena

  12. Slide 12: H1 2015 Cash Operating Costs

    H1 2015 Cash Operating Costs Other Logistics & Travel 5% 9% Production Overheads Distribution Costs 12% 5% Other Logistics & 11% Travel 8% Distribution Costs Production 5% Overheads 10% Fuel 12% H1 H1 2015 Fuel 6% 2014 Labour payroll 33% Labour payroll Power 6% Power 32% 9% Repairs & Repairs & Maint

  13. Slide 13: Balance Sheet Review at June 2015

    Balance Sheet Review at 30 June 2015 30/6/2015 31/12/2014 Comment on 2015 & movement US$m US$m Property, plant & equipment 849.6 865.2 US$1.0m capital additions Inventories 46.8 62.5 Reduced product stock volumes and NRV adjustment Trade & other receivables 30.2 28.1 Function of sales prior to perio

  14. Slide 14: Group Debt

    Group Debt Group reported debt at 30 June 2015: US$329.9m (30 June 2014: US$349.6m), after project loan amendment fee adjustment of US$15.5 million (30 June 2014: US$9.5 million). Average project interest rate at June 2015 was 9.1%. Senior: US$79.2 million, floating @ LIBOR + 3.5% to 5.3%, fixed @ 5

  15. Slide 15: Appendix

    (a) Appendix 15

  16. Slide 16: Group Lenders at June 2015

    Group Lenders at 30 June 2015 Loan Balance Maturity under April 2015 US$m Loan amendment Senior Project Loans AFDB 21.2 2021 Absa (ECIC) 23.9 2018 EAIF 2.6 2021 EIB 8.6 2021 FMO 8.6 2019 KfW IPEX-Bank (Hermes) 6.6 2018 KfW IPEX-Bank (MIGA) 7.7 2021 79.2 Subordinated Project Loans EIB 143.6 2021 EAIF

  17. Slide 17: Reserves & Resources

    Reserves & Resources Reserves & resources table as at 31 December 2014 Zones Category Ore (Mt) % THM* % Ilmenite in THM % Ilmenite in ore % Rutile in ore % Zircon in ore % Slime THM (Mt) Ilmenite (Mt) Rutile (Mt) Zircon (Mt) Reserves Namalope Proved 246 4.1 82 3.3 0.077 0.24 8.05 10 8.2 0.19 0.58 Na

Kenmare Resources — H1 2015 Earnings Presentation on 6ix