Orvana Minerals Corp. · TSX:ORV
Orvana Minerals — Investor Presentation (November 2010)
35 slides from Orvana Minerals's investor presentation, November 2010

Slide 1: Growing and Diversifying
Growing and Diversifying November 2010

Slide 2: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Certain statements in this presentation constitute forward-looking statements or forward-looking information within the meaning of applicable securities laws (“forward-looking statements”). Any statements that express or involve discussions with respect to predictions, exp

Slide 3: Company Snapshot
COMPANY SNAPSHOT Ticker TSX: ORV Shares Outstanding 116.06 million (118.8 million fully diluted) Market Cap (10/26/10) C$302 million Cash (6/30/10) US$26.9 million Major Shareholders Fabulosa Mines Ltd. (52.5%) Sprott Asset Management (approx. 9%) Head Office Toronto, Ontario Main Projects EVBC Spai

Slide 4: Milestones
Milestones 3.00 Haywood Coverage; Copperwood PEA UMZ 2.50 Reserve Copperwood EVBC $50M DDH Results Resource Credit Line 2.00 Term Sheet Development EVBC Copperwood EVBC Plans Announced Update Resource Reserve 1.50 GOLD $1297/oz $1204/oz 1.00 0.50 0.00 1-year Chart ORV-T as at October 29, 2010 4

Slide 5: Experienced Management Team
EXPERIENCED MANAGEMENT TEAM ROLAND HORST, MBA, LLB, M.Sc, Chief Executive Officer as of 2010; 35 years of mining industry experience as CEO, investment banker, corporate banker and geologist in Canada, Brazil, Indonesia and Chile. CARLOS MIRABAL, M.Sc., President & Chief Operating Officer, since 200

Slide 6: Experienced Board
EXPERIENCED BOARD C. KENT JESPERSEN, M. Sc., Chairman since 2007; Extensive board and executive experience in resource sector (Nova, Husky, La Jolla), previously Chairman of North American Oil Sands Corporation, GEAC Inc., C.D. Howe Institute and Institute of the Americas. PETER BRADSHAW, Ph.D; Geol

Slide 7: Investment Highlights
INVESTMENT HIGHLIGHTS Proven ability to acquire, build and operate mines Growing pipeline of development projects El Valle-Boinás/Carlés (EVBC), Spain Don Mario Upper Mineralized Zone (UMZ), Bolivia Copperwood, Michigan (CW), USA US $50 million, 5-year term loan with Credit Suisse closed Octo

Slide 8: Acquisition Strategy
ACQUISTION STRATEGY Producing or advanced stage gold and/or copper properties with the potential to produce 50,000 – 100,000 ounces per year of gold or equivalent Stable geographic areas with focus on the Americas and Europe Cost of production in the lower half of the cost curve Utilize Orvana’s min

Slide 9: Growth
GROWTH FY 2010 - FY 2013 Production Plan (fiscal year Sep 30) FY 2003 – FY 2009 THREE COUNTRIES: Don Mario Mine, Bolivia Spain (target FY 2011) 420,000 ounces gold Bolivia (extended mine life) Low cash cost US (target FY 2013) THREE METALS: Gold (Spain, Bolivia) Copper (Spain, Bolivi

Slide 10: Total Reserves and Resources
TOTAL RESERVES and RESOURCES M&I Resource– Gold M&I Resource– Copper M&I(1.47M Resource oz) M&I Resource (1,095M lb) 0.66% 1.29 gpt (ug) (op) 1.34% 1.86% (op) 5.08 gpt (ug) (ug) 2P Reserve – Gold 2P Reserve – Copper 2P Reserve (1.04M oz) 2P Reserve (119M lbs) EVBC UMZ CW EVBC UMZ CW 1.41 gpt 0.74% (

Slide 11: Total Reserves and Resources
TOTAL RESERVES and RESOURCES Tonnes, Gold, Gold, Cu, Cu, Silver, Silver, millions g/t million oz % million lbs g/t million oz Spain (EVBC 1) 2.100 4.05 0.280 0.80 36 n/a n/a (includes Proven Reserves of 4) 1.311 4.09 0.172 0.90 26 11 0.4 Measured Resources Bolivia (UMZ 2) 2.749 1.34 0.119 1.37 83 45

Slide 12: Inferred Resources & Historical Estimates
INFERRED RESOURCES & HISTORICAL ESTIMATES Gold, Cu, Silver, Tonnes, Gold, million Cu, million Silver, million millions g/t oz % pounds g/t oz Inferred Resources Spain (EVBC 1) 9.500 4.9 1.478 0.40 80 n/a n/a Bolivia (UMZ 2) 0.326 1.2 0.012 1.49 11 38 0.4 USA (Copperwood 3) 3.300 - - 1.49 107 5 0.5 T

Slide 13: El Valle-Boinás/Carlés (EVBC), Spain
EL VALLE-BOINÁS/CARLÉS (“EVBC”) SPAIN Carlés El Valle-Boinás MADRID 13

Slide 14: EVBC – Background
EVBC – BACKGROUND 1997-2006: Mined by Rio Narcea Gold Mines • Open-pit methods from 1997-2004 • Underground from 2004-2006 2006: mine closed, after producing • Approximately 950,000 ounces of gold • Over 20,000 tonnes of copper 2007: sold to Kinbauri Gold Corp. (KGC) 2009: (September): Orvana acquir

Slide 15: EVBC – Infrastructure
EVBC — INFRASTRUCTURE Le ROAD ACCESS A Poona ~ : So < . md ROAD ACCESS | “ . i ee ee aG ; ef : :

Slide 16: EVBC – Production Scenario
EVBC– PRODUCTION SCENARIO Average annual production estimate: (7-year mine life) Gold - 105,000 ounces Copper - 3,900 tonnes (8.6 million pounds) PRODUCTION TARGET – Spring, 2011 At full production, one of the largest gold producers in western Europe Source: NI-43-101 Technical report on the Boinás

Slide 17: EVBC – Reserves and Resources
EVBC – RESERVES and RESOURCES AU CU Mt Gpt Ounces % Tonnes Proven Reserves 1.3 4.1 172,000 0.90 11,800 Probable Reserves 3.4 5.7 612,000 0.68 22,700 Total Reserves 4.7 5.2 784,000 0.74 34,500 Measured Resources 2.1 4.1 280,000 0.80 16,500 Indicated Resources 5.2 5.5 922,000 0.60 32,000 Total M & I 7

Slide 18: EVBC – Operational Parameters
EVBC – OPERATIONAL PARAMETERS Base Case: Throughput 1,900 tpd (for 7 years) Avg. Annual Production 105,000 ounces Au (recovered) 3,900 tonnes Cu (recovered) 160,000 ounces Ag (recovered) Gold recovery (LOM) 94% Copper recovery (LOM) 78% Silver recovery (LOM) 70% US$60M Pre-production Capital (50% sp

Slide 19: EVBC – Economics
EVBC – ECONOMICS Excellent Leverage to Metal Prices All figures in US$ Base Case IRR¹ NPV (5%)¹ Gold Price (oz) Copper Price (lb) Silver Price (oz) Exchange Rate $ 800 $2.00 $12.50 Euro = $1.35 48% $91.1m Base case scenario: 2.16 year payback High Case IRR¹ NPV (5%)¹ Gold Price ($/oz) Copper Price (

Slide 20: Don Mario Mine, Bolivia
DON MARIO MINE BOLIVIA Don Mario Santa Cruz 20

Slide 21: Don Mario – Background
DON MARIO – BACKGROUND FY 2003-FY 2009: underground mine (Lower Mineralized Zone) Developed on-schedule and under budget Produced over 420,000 ounces of gold Life-of-Mine cash cost of <US$200/ounce FY 2009-FY 2010: Las Tojas open pit Estimated total output over 27,000 ounces of gold Production

Slide 22: Don Mario – UMZ Deposit
DON MARIO – UMZ DEPOSIT Porous Oxide Transition Sulphide 22

Slide 23: Don Mario – Reserves and Resources
DON MARIO – RESERVES and RESOURCES Cu Au Ag Mt % gpt gpt Proven Reserves (1) 2.5 1.48 1.5 49 Probable Reserves 3.2 1.47 1.4 43 Total Reserves 5.7 1.47 1.4 45 Measured Resources (1),(2) 2.7 1.37 1.3 45 Indicated Resources 3.7 1.32 1.3 39 Total M & I 6.4 1.34 1.3 38 Inferred Resources 0.3 1.49 1.2 38

Slide 24: UMZ Production Scenario
UMZ PRODUCTION SCENARIO Mine life of 10.5 years Throughput: 1,700 tpd Average annual production* 14.5 million pounds of copper 14,400 ounces of gold 460,000 ounces of silver US$ 21M Pre-production Capital Fully Permitted Start up is expected by end of 2010 following completion of sulphuric aci

Slide 25: Copperwood
Keweenawan Rift rocks Lake (5) Sedimentary Nipigon [) igneous SS __ Diabase dikes oo” Major faults Native copper occurrences . . Several < Abundant A ale peoc~ntS 2 Isle Royale Minnesota Sa Lake Superior Keweenaw Peninsula Sew = South Range to Mohawk Mass-Mir ta oagee eet 5 Mt Cu produced ye (Native

Slide 26: Copperwood – Background
COPPERWOOD - BACKGROUND 1950s-1980s: property explored and studied by others 1953-1996: nearby White Pine mine produced more than 1.7 million tonnes of copper 2008: Orvana acquired Copperwood leases, Environmental studies started 2009: completed 82-hole, 13,000 metre drill program 113 holes for 20

Slide 27: Copperwood Resources
COPPERWOOD RESOURCES Cu Mt % M lbs Measured Resources (1) 14.2 1.93 600 Indicated Resources 5.3 1.69 198 Total M & I 19.5 1.86 798 Inferred Resources 3.3 1.49 107 Historical Estimate (Satellite Deposits) (2) 45.5 1.23 1,250 Plan to submit mine permit application in 2011 leading to projected producti

Slide 28: Copperwood Resources
COPPERWOOD RESOURCES COPPERWOOD RESOURCE N CLASSIFICATION cm eTgver CLASS 4 + Measured Indicated Inferred saves y Fault —4 Intersection segues — 7s Lake Shoreline —> a is se HERE ae = vaso a 0) _ t : : Gy 109 Hed LI ust i rgita ra ay aneRee la N wsypes Z| (A ORVANA DRILL HOLES if ms7yyt N ae a A LEG

Slide 29: Copperwood PEA
COPPERWOOD PEA Excellent Leverage to Copper Prices Conceptual Mine Plan1 Pre-Tax Net Present Value (US$ millions) 17.67 million short tons at 1.51% copper (underground w/ continuous miner) Discount Copper Price (US$)/ Silver Price (US$) 1.8 million short tons/year for 9 years (2- Rate % 2.25/14.

Slide 30: Copperwood Opportunities
COPPERWOOD OPPORTUNITIES Drill out inferred resources to add tons Further optimize conceptual mine plan and method Extend partial pillar extraction to minimize dilution Increase throughput Continue metallurgical testing to improve recoveries and concentrate copper grades Run copper-price

Slide 31: Production Outlook
PRODUCTION OUTLOOK FY 2010: transition year, declining output FY 2011: growth resumes UMZ starts; El Valle-Boinás/Carlés (part year) FY 2012: growth accelerates UMZ full year; El Valle-Boinás/Carlés all year FY 2013: production step-change UMZ full year; El Valle-Boinás/Carlés all year Co

Slide 32: Production Outlook – Gold
PRODUCTION OUTLOOK Orvana Projected Au Production (Fiscal years to September 30) Ounces 140 120 100 Las Tojas 80 EVBC UMZ 60 LMZ 40 20 0 2009 2010 2011 2012 • EVBC is projected to have one-half year production in Fiscal 2011 • UMZ projected to have three-quarter year production in Fiscal 2011 SOURCE

Slide 33: Production Outlook – Copper
PRODUCTION OUTLOOK Orvana Projected Cu Production (Fiscal years to September 30) Tonnes 16000 14000 12000 10000 8000 6000 4000 2000 0 2009 2010 2011 2012 • EVBC is projected to have one-half year production in Fiscal 2011 • UMZ projected to have three-quarter year production in Fiscal 2011 SOURCES:

Slide 34: Production Outlook – Gold Equivalent
PRODUCTION OUTLOOK Orvana Projected Gold Equivalent* Production (Fiscal years to September 30) Ounces 250,000 225,000 200,000 175,000 150,000 125,000 100,000 75,000 50,000 25,000 0 2009 2010 2011 2012 *(Cu $3/lb, Ag $20/oz, Au $1200/oz) • EVBC is projected to have one-half year production in Fiscal

Slide 35: Growth and Long-Term Value Creation
EXPERIENCED TEAM QUALITY PROJECTS CASH RESOURCES GROWTH AND LONG-TERM VALUE CREATION November 2010
Source: Internet Archive copy of orvana.com
More decks from Orvana Minerals Corp.
Investor Presentation (November 2026)35 slides · Nov 6, 2026
Investor Presentation (September 2026)35 slides · Sep 21, 2026
Investor Presentation (April 2026)33 slides · Apr 7, 2026
Investor Presentation (November 2025)32 slides · Nov 28, 2025
Investor Presentation (October 2025)32 slides · Oct 1, 2025
Investor Presentation (May 2025)30 slides · May 14, 2025