Slide 1: Producer in a Transformational Growth Phase
PRODUCER IN A TRANSFORMATIONAL GROWTH PHASE Corporate Presentation | Nov 28, 2025 TSX | ORV ORVANA.COM Don Mario Plant Expansion1 Nov | 2025

Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS All monetary amounts in U.S. dollars unless otherwise stated. personnel; the Company’s ability to obtain and maintain all necessary regulatory approvals and licenses; Orovalle’s ability to complete the Certain statements in this presentation constitute forward-looking stat

Slide 3: Strategy Overview
STRATEGY OVERVIEW • Focused on maximizing resource value and delivering stable cash flow OROVALLE • Continue Brownfield and Greenfield exploration Producing Unit drive to expand the resource base Toronto HEAD OFFICE Spain Orovalle Au, Cu, Ag • Targeting beginning of ramp up in mid-December, and reac

Slide 4: Operations Outlook
OPERATIONS OUTLOOK FY2026 FY2027 OROVALLE El Valle Production Brownfield & Greenfield Exploration Oxides Stockpile Production Don Mario Plant EMIPA Expansion Reassessment of Remnant Mineralization at Don Mario Tailings Reprocessing Evaluation Cu lb Aproximately 20M Aproximately 20M Cu lb production

Slide 5: Snapshot - TSX:ORV
SNAPSHOT - TSX:ORV Common Shares O/S 136.6M Unrestricted Cash (09/30/25) USD 28.3M Options (09/30/25) None Total Debt (09/30/25) USD 68.7M Stock Price (11/28/25) CAD 1.65 Enterprise Value (11/28/25) USD 201.1M Market Capitalization (11/28/25) CAD 225.5M Monthly Avg. Trading Volume 6.7M Fiscal Year e

Slide 6: Don Mario
Produced from 2003 to 2019; on Care and Maintenance since late 2019 DON MARIO V BOLIVIA Don Mario Restart Targeted for FY2026 – Oxides Stockpile Project (OSP) The Company has an oxides stockpile accumulated from previous years of mining activity. After analyzing an economic way to treat this sto

Slide 7: Oxides Stockpile Project (OSP)
The OSP consists of a plant OXIDES STOCKPILE PROJECT (OSP) • National Instrument 43-101 Technical Report for the Don Mario V BOLIVIA expansion to treat ore stockpiled at Property dated February 28, 2022 including OSP information is the Don Mario mine from previous available on www.sedarplus.ca and o

Slide 8: OSP - Construction Update
Construction commenced in Q1-FY2025 OSP - CONSTRUCTION UPDATE V BOLIVIA Progress as of November 28, 2025: Plant Expansion 100% Earthworks 100% Concrete 100% Major Equipment Procurement 85% Steel Structures 85% Minor Equipment Procurement 50% Piping 50% Electrical – Instrumentation 40% General Assemb

Slide 9: Taguas Project
TAGUAS PROJECT V ARGENTINA • Located in high Andes of San Juan Province, Argentina • Consisting of 15 individual claims/concessions – 3,273.87 ha • Highly prolific area known for high-sulfidation epithermal Au-Cu-Ag deposits and porphyry Cu-Au systems • Orvana’s strategy in the Taguas project had be

Slide 10: Taguas - Porphyry Opportunity
CERROS TAGUAS TAGUAS - PORPHYRY OPPORTUNITY PROJECTS VALERIANO ** V ARGENTINA COMPARISON Mineral Resources Reported *: Mineral Resources Reported: • Au-Epithermal oxide (Open pit): 57.2Mt @ 0.36 g/t Au, 12.98 g/t Ag • Au-Epithermal oxide (Open pit): 47Mt @ 0.35 g/t Au, 1.34 g/t Ag • Au-Epithermal su

Slide 11: Taguas – Exploration Program
TAGUAS – EXPLORATION PROGRAM V ARGENTINA Sep-2025 Jan-2026 Apr-2026 Jul-2026 Geological Modeling Update Geophysical Survey First Deep Drilling Results Evaluation Completed In progress • Detailed relogging of • Objective: identify • Target: drill the areas • Results will be evaluated historical drill

Slide 12: Geophysical Survey
GEOPHYSICAL SURVEY V ARGENTINA N • Ridgeback Geofísica Argentina S.A., an affiliate of Southernrock Geophysics, has been engaged to conduct a Magnetotelluric (MT) and Induced Polarization (IP) surveys across the southern portion of the Taguas property Cerro Campamento • Covers the full 4 km² area of

Slide 13: El Valle Operations
EL VALLE OPERATIONS V SPAIN LOCATION Asturias, Northern Spain MINING El Valle Boinás and Carlés Mines Methods: Drift and fill; Sublevel Stoping PROCESSING El Valle Plant Circuits: Gravimetry, Flotation, CIL Output: Copper Concentrate & Au-Ag Dore FY2025 METAL PRODUCTION Au: 29.3K oz Ag: 115.5K oz Cu

Slide 14: Production & Cost
PRODUCTION & COST COC/AISC(*) per Au/oz sold V SPAIN Gold oz Production Copper lbs Production (thousands) By-product 36,488 37,000 3,744 $2,700 - $3,000 3,612 34,000 29,276 3,000 $2,186 $2,300 - $2,500 2,700 $1,829 $1,847 $1,539 FY 2024 FY 2025 FY 2026 FY 2024 FY 2025 FY 2026 FY 2024 FY 2025 FY 2026

Slide 15: Financial Performance
FINANCIAL PERFORMANCE Financial Performance (US 000’s) FY 2022 FY 2023 FY2024 FY2025 Year-end: September 30 Revenue $94,668 $99,122 $90,310 $98,903 Net Income (Loss) ($13,719) $2,708 ($4,952) ($12,299) EBITDA (*) $6,277 $21,652 $16,865 $21,366 OCF, before Non-Cash WC changes $7,393 $16,291 $21,409 $

Slide 16: Investment Opportunity
INVESTMENT OPPORTUNITY • Three NI 43-101-supported Assets. All 100% controlled Orovalle (Spain): Producing asset located in safe jurisdiction Brownfield and greenfield portfolio Don Mario (Bolivia): Positioned to restart production in 2026 Managed by an experienced local team Taguas (Argentina): Adv

Slide 17: Appendix
ORVANA MINERALS CORP APPENDIX

Slide 18: Management
MANAGEMENT Juan Gavidia Nuria Menéndez Binh Vu Raúl Álvarez Rubén Collar Guadalupe CEO since 2018 CFO since 2018 Collar & GM Orovalle since 2016 VP Legal Affairs Director of Exploration & Director of Operations Director of Geology 40 years work experience in Technical Services Orovalle Orovalle Gene

Slide 19: Mineral Resources GEO
MINERAL RESOURCES GEO Gold Equivalent Ounces (M) 4.9 4.7 4.7 2.8 2.8 2.8 0.6 0.6 0.6 1.5 1.3 1.3 Orovalle September 30, 2022 September 30, 2023 September 30, 2024 Don Mario Taguas Gold Equivalent Ounces (GEO) (*) calculations were based on assumed metal prices of: Au/Ag/Cu prices (*) Gold Equivalent

Slide 20: Orovalle Reserves & Resources
OROVALLE RESERVES & RESOURCES V SPAIN Mineral Reserves2 – Sept. 30, 2024 Tonnes Grade Contained Metal Au Cu Ag Au Ounces Cu Lbs Category (000’s) (g/t) (%) (g/t) (000’s) (000’s) Total Proven Reserves 382 2.41 0.48 8.75 30 4,025 Total Probable Reserves 1,730 2.84 0.22 3.52 158 8,530 Total P+P Reserves

Slide 21: Notes to Orovalle Reserves & Resources
Notes to Mineral Reserves table: NOTES TO OROVALLE RESERVES & RESOURCES Notes to Mineral Resources table: V SPAIN 1. CIM (November 29, 2019) definitions and guidelines were followed for Mineral Reserve 1. CIM definitions and guidelines (November 29, 2019) were followed for Mineral Resources estimati

Slide 22: Don Mario Resources
DON MARIO RESOURCES V BOLIVIA Oxide Stockpile and Tailings Reprocessing Project’s Mineral Resources – Sept. 30, 2024 Tonnes Grade Contained Metal Au Cu Ag Au Ounces Ag Ounces Category (000’s) Cu Tonnes (g/t) (%) (g/t) (000’s) (000’s) Total Measured Resources (Oxides 2,184 1.84 1.89 49.3 129 41,283 3

Slide 23: Taguas Resources
Taguas Mineral Resources – September 30, 2024 TAGUAS RESOURCES V ARGENTINA Tonnes Grade Contained Metal Au Ag Au Ag Cu Cu Lbs Location Material Type Class (000’s) Ounces Ounces (g/t) (g/t) (%) (million) (000’s) (000’s) Indicated 39,463 0.37 11.1 467 14,037 Oxide Cerro Taguas Inferred 17,736 0.35 16.

Slide 24: Don Mario Reserves
DON MARIO RESERVES V BOLIVIA Stockpile Mineral Reserves – Sept. 30, 2024 Tonnes Grade Contained Metal Au Au Cu Ag Cu Ag Ounces Category (000’s) Ounces (g/t) (%) (g/t) Tonnes (000’s) (000’s) Total Proven Reserves 2,032 1.85 1.89 49.3 121 38,438 3,221 Total Probable Reserves 0 0 0 0 0 0 0 Total P+P Re

Slide 25: Taguas Project – PEA NI 43-101
TAGUAS PROJECT – PEA NI 43-101 This PEA refers only to the oxidized gold-silver mineralization occurring near surface in Cerro Taguas. This PEA is dated December 2021, it doesn’t include the information of the FY2022 infill campaign. V ARGENTINA Estimate of Inferred Mineral Resource for Cerro Taguas

Slide 26: Regional Exploration
Madrid REGIONAL EXPLORATION LOCATION V SPAIN Orovalle Mine Operations and Projects are located in Northern Spain Major Regional Gold Belts Spain GIJÓN PORT El Valle Plant: 89 kilometers by road to Gijon Port TARGETS Regional Targets based on 35,841 ha land package LA LINDE OVIEDO with 14 Exploitatio

Slide 27: Rio Narcea Gold Belt
RIO NARCEA GOLD BELT V LONG TERM EXPLORATION STRATEGY GOING NORTH FROM CURRENT OPERATIONS SPAIN ORTOSA GODAN TARGET TARGET ORTOSA GODAN CARLES TARGET CARLES MINE MINE EL VALLE - BOINAS MINE OXIDES N LEGEND SKARN Exploitation EL VALLE- BOINAS Concessions MINE Mine Operations Ortosa- Godan Target area

Slide 28: Ortosa – Godán
ORTOSA – GODÁN • V Located close to Carlés deposit SPAIN • Airborne Geophysics • Geochemistry / Surface sampling • 9,833 m of drilling in 37 historical holes (1981-2011) • 10,834 m of drilling in 25 holes by Orovalle (2021-2025) Exploitation Concessions ORTOSA Carles Operation Carlés Deposit ORTOSA

Slide 29: Godan
Legend 23GOD05 3.70 m @ 5.91 g/t Au GODAN 23GOD06R 5.10 m @ 1.09 g/t Au 1.30 m @ 4.16 g/t Au V SPAIN GODAN 1.30 m @ 2.26 g/t Au 10.20 m @ 1.56 g/t Au 5.70 m @ 0.82 g/t Au CARLES MINE Old Drillholes 2.0 Km Orovalle Drillholes 0m DDH 25GOD09R 23GOD07 23GOD09R DDH 25GOD08 AGODAN 23GOD08 - 500 m ? 20CN1

Slide 30: Ortosa
ORTOSA V SPAIN ORW-3X 22ORW11 N 11.25 m @ 6.8 g/t Au 21ORW05 2.90 m @ 20.66 g/t Au 1.10 m @ 33.12 g/t Au N 22ORW07 6.05 m @ 22.16 g/t Au 1.60 m @ 27.43 g/t Au A’ Au (g/t) >=0.25 <1.00 >= 1.00 <2.25 300 m >= 2.25 <3.50 >=3.50 <5.00 >=5.00 <10.00 >=10.00 A Target area (Untested) 100 m Intercepts Longi

Slide 31: Lidia
EL VALLE- BOINAS MINE 21LIDIA02 99.3 m @ 0.48 g/t Au LIN-4x 22LIDIA04 • LIDIA V SPAIN Located in Navelgas Gold Belt, 20 km west from El Valle 196.5 m @ 0.53 g/t Au Including: 142.5 m @ 0.44 g/t Au Mine 1.90 m @ 3.14 g/t Au • Exploration background: 22LIDIA05 21LIDIA03 318.0 m @ 0.44 g/t Au Detaile

Slide 32: Contact
70 York Street, Suite 1710 Toronto, Ontario Canada M5J 1S9 T 416-369-1629 www.orvana.com Raúl Álvarez Director Exploration & Technical Services ralvarez@orvana.com Nuria Menéndez Chief Financial Officer nmenendez@orvana.com
Source: Internet Archive copy of s2.q4cdn.com
More decks from Orvana Minerals Corp.
Investor Presentation (November 2026)35 slides · Nov 6, 2026
Investor Presentation (September 2026)35 slides · Sep 21, 2026
Investor Presentation (April 2026)33 slides · Apr 7, 2026
Investor Presentation (October 2025)32 slides · Oct 1, 2025
Investor Presentation (May 2025)30 slides · May 14, 2025
Investor Presentation (August 2022)33 slides · Aug 18, 2022