Gr Silver Mining Ltd. · TSXV:GRSL

Gr Silver Mining — Investor Presentation (March 2021)

17 slides from Gr Silver Mining's investor presentation, March 2021

  1. Slide 1: Corporate Presentation

    CORPORATE PRESENTATION MARCH 2021 TSX-V: GRSL OTCQB: GRSLF FRA: GPE

  2. Slide 2: Cautionary Statements

    CAUTIONARY STATEMENTS This presentation contains “forward-looking statements” within the meaning of Canadian securities laws. Where a forward-looking statement expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and beli

  3. Slide 3: Control of Key Ag-Au Mining Assets, Rosario Mining District

    CONTROL OF KEY Ag-Au MINING ASSETS, ROSARIO MINING DISTRICT - MEXICO RESOURCE EXPANSION & DISCOVERIES 2021 NI 43-101 29 Moz Ag (Ind) + 10 Moz Ag (Inf) 1 2 Mineralized 3 Trends Ag-Au Quartz Veins Old Workings New Exploration Drilling Targets 3 CONSOLIDATION OF OWNERSHIP Ag-Au DISTRICT

  4. Slide 4: Rosario Mining District – Historical Multi-Million Ounce Ag-Au Mines

    ROSARIO MINING DISTRICT – HISTORICAL MULTI-MILLION OUNCE Ag-Au MINES v SUCCESFUL CONSOLIDATION 1,330 km2 (March 2021)* Ø 24 Ag-Au Epithermal Veins – Old Workings Ø 75 km of Historic Mineralized Trend (100% Control) Ø 2 Past Producing Mines (Plomosas and La Trinidad) v MAJOR CATALYSTS Ø Plomosas Silv

  5. Slide 5: Resource & Development Stage Projects & Discoveries

    PLOMOSAS Ag PROJECT, SAN MARCIAL & ACQUISITONS RESOURCE & DEVELOPMENT STAGE PROJECTS & DISCOVERIES v 100 % Control of Mineralized Trend Plomosas – San Marcial Ø First Company to Control Most Important Mining Assets in the Rosario Mining District Ø 2 Fully Permitted Projects - Past Producers (Plomosa

  6. Slide 6: Plomosas Mine Area – Large High Grade Ag-Au Epithermal System

    PLOMOSAS MINE AREA – LARGE HIGH GRADE Ag- Au EPITHERMAL SYSTEM SELECTED RECENT NEWS RELEASE DRILL RESULTS Polymetallic Discovery PLI20-04 83.0 m @ 2.5 g/t Au, 33 g/t Ag, 0.9% Pb, 2.9% Zn, 0.3% Cu Including: 11.0 m @ 9.4 g/t Au, 135 g/t Ag, 5.7% Pb, 9.8% Zn, 0.5% Cu PLI20-05 1.0 m @ 9.0 g/t Au, 136 g

  7. Slide 7: Plomosas Mine Area: New Discoveries – 2021 Drilling Program

    PLOMOSAS MINE AREA: NEW DISCOVERIES – 2021 DRILLING PROGRAM NEW TARGETS FOR 2021 THIRD PARTY INDEPENDENT REVIEW OF GEOPHYSICAL DATA IDENTIFIED SHALLOW DRILLING TARGETS NEAR PLANNED RESOURCE AREA AT PLOMOSAS 7

  8. Slide 8: Plomosas Mine Area – Infrastructure in Place

    PLOMOSAS MINE AREA – INFRASTRUCTURE IN PLACE • Fully Permitted for Production • Potential Low Capital Intensity for Development & Production • New Discoveries Outlining Extensive Mineralized System • Maiden NI 43-101 Resource Q2/2021 8

  9. Slide 9: San Juan Area – Ag-Rich Epithermal System

    SAN JUAN AREA – Ag-RICH EPITHERMAL SYSTEM SAN JUAN AREA • Proximity to Plomosas Mine Area - Permitted • Large Mineralized Footprint (2 km long) • 6 Ag-Au rich Epithermal Veins • Drilling & Resource Estimation Underway 9

  10. Slide 10: San Marcial – Drilling & Resource Expansion Along Strike and Down-Dip

    SAN MARCIAL – DRILLING & RESOURCE EXPANSION ALONG STRIKE AND DOWN-DIP POTENTIAL FOR FUTURE OPEN PIT DEVELOPMENT Ag-rich Hydrothermal Breccia Hosting Mineralization Common Presence of Wide, High-grade Intersections Near Surface 15 m @ 472 g/t Ag 12 m @ 323 g/t Ag 24 m @ 219 g/t Ag 56 m @ 196 g/t Ag 1

  11. Slide 11: San Marcial: Discoveries – Resource Expansion 2021

    SAN MARCIAL: DISCOVERIES – RESOURCE EXPANSION 2021 SM-10-15 @ 54.60m Hydrothermal breccia Ag g/t Zn % Pb % Au g/t 3,720 0.2 0.1 0.15 Underground Development Ground Geophysical Program IP & Mag 11 All numbers are rounded. Results are uncut and undiluted

  12. Slide 12: Timeline & Milestones

    TIMELINE & MILESTONES 3-6 Months 9-12 Months 12-24 Months New Resource Estimates District-scale Ag-Au System Full Integration of All Projects Continuous Au-Ag Discoveries Creating Value Through Low Acquisition Costs Economic Studies Resource Expansion + Engineering + Discoveries 12

  13. Slide 13: Capital Structure

    CAPITAL STRUCTURE Capitalization & Balance Sheet (March 19, 2021) Shares Shares Outstanding 131,813,434 $9.1M Bought Deal closing Silver price rises Warrants (avg. weighted price $0.38) 15,470,387 High-grade Plomosas drill results Options (avg. weighted price $0.45) 9,947,356 Plomosas Silver Fully d

  14. Slide 14: Highlights

    HIGHLIGHTS v Leading silver-gold resource expansion & development stage company in the Rosario Mining District v Advanced surface and underground core drilling program at the Plomosas Project with the objective of completing 10,000 m in Q1/2021 v Initiated two resource estimates at the Plomosas Proj

  15. Slide 15: Board & Management

    BOARD & MANAGEMENT Strong track record of global mining related M&A Marcio Fonseca, P.Geo., President and CEO Trevor Woolfe, BSc.(Hons)(Geo) VP Corporate Development Blaine Bailey CPA, CFO Honza Catchpole, PhD., P.Geo., VP Exploration Brenda Dayton, BA., VP Corporate Communications BOARD OF DIRECTOR

  16. Slide 16: Well Positioned for Growth

    WELL POSITIONED FOR GROWTH TRADING AT A DISCOUNT TO PEERS & MEAN ENTERPRISE VALUE/OUNCE SILVER 3 YEAR ANALYSIS Enterprise Value/Ounce Ag Silver Resource Companies Trended Upward Along With Silver Price Global Resources Peer Valuations 3 Yr Average (M+Ind+Inf) EV/oz of US$2.08/oz v GR Silver trading

  17. Slide 17: Contact Us

    CONTACT US GR Silver Mining Ltd. 999 West Hastings St., 9th Floor, Vancouver, BC, V6C 2W2 General Inquiries: +1-604-202-3155 info@grsilvermining.com grsilvermining.com @GRSilverMining GR Silver Mining GR Silver Mining Ltd. PLOMOSAS MINE –LEVEL 775 17

GR Silver Mining — Investor Presentation (March 2021) on 6ix