Ptr Minerals Limited · ASX:PTR

Ptr Minerals — Petratherm — RIU Gold Coast Investment Showcase 2023

20 slides from Ptr Minerals's conference presentation, Jun 21, 2023

  1. Slide 1: Conference Presentation - PTR Positioned for Growth

    21 June 2023 Conference Presentation - PTR Positioned for Growth Petratherm Limited (ASX: PTR) (PTR or the Company) is pleased to release the following presentation that Chief Executive Officer, Peter Reid, will be presenting at the RIU Gold Coast Investment Showcase on Wednesday 21 June 2023. PTR i

  2. Slide 2: Positioned for Growth

    Positioned for Growth Petratherm Limited (ASX: PTR) RIU Gold Coast Investment Showcase June 2023

  3. Slide 3: Compliance Statements

    Compliance Statements Disclaimer: JORC Information and Compliance Note: This presentation has been prepared by Petratherm Limited (Petratherm). The information contained in this Further details (Including JORC 2012 Code Reporting Tables, where applicable) for the information included in this present

  4. Slide 4: Corporate Snapshot

    Corporate Snapshot Shares on Issue Share Price (16/06/2023) Cash (31 March 2023) Options Market Capitalisation Enterprise Value 224.8M $0.075 $3.2M 1.925M $17M (undiluted) $13.8M PTR Share Price Chart $0.12 3,500,000 $0.10 3,000,000 2,500,000 Share Price (A$/Share) Volume (m) $0.08 2,000,000 $0.06 1

  5. Slide 5: Board and Management With Track Record of Exploration Success

    Corporate Snapshot Board and Management With Track Record of Exploration Success Derek Carter Peter Reid Simon Taylor Non-Executive Chairman Chief Executive Officer Non-Executive Director Mr. Carter is a founder of the Minotaur group and a joint Mr. Reid is an exploration geologist with 30 years’ ex

  6. Slide 6: Project Overview

    Project Overview Strategic Package of REEs & Copper-Gold Projects in South Australia Comet REE Project • Exceptional REE drill intercepts over two prospects. • Massive exploration upside – less than 10% of prospective area tested for REEs. • AC drilling campaign completed at Artemis + New Areas – As

  7. Slide 7: Comet REE Project

    Comet REE Project Significant Ground Position With Two REE Discoveries • Strong ground position in the Northern Gawler Craton, totalling 1,915 km2. • Regional drilling activities to date have tested 130 km2, which is <10% of the total Project Holding. • Substantial upside potential for additional ne

  8. Slide 8: Meteor REE Prospect

    Meteor REE Prospect Summary of Results3 21m @ 1071 ppm TREO inc. 3m @ 1716 ppm TREO • High-Grade REE Prospect (> 1000 ppm TREO). • High-Value MREO up to 746 ppm and average 24m @ 1030 ppm TREO 242 ppm (26% of TREO). inc. 3m @ 2144 ppm TREO 15m @ 1117 ppm TREO inc. 3m @ 2327 24m @ 1594 ppm TREO • Min

  9. Slide 9: Meteor – W-E Cross Section – High Grade Mineralisation

    Meteor – W-E Cross Section – High Grade Mineralisation3 21m @ 1071 ppm TREO from 3m 24m @ 1594 ppm TREO from 6m Inc 3m @ 1716 ppm TREO from 6m Inc 6m @ 2495 ppm TREO from 6m 6m @ 763 ppm TREO from 6m 3m @ 820 ppm TREO from 12m 20m @ 921 ppm TREO from 3m Inc 9m @ 1050 ppm TREO from 9m 9m @ 513 ppm TR

  10. Slide 10: Artemis REE Prospect

    Artemis REE Prospect Summary of Results 4 24m @ 1094 ppm TREO 30m @ 1110 ppm TREO inc. 6m @ 1573 ppm TREO inc. 12m @ 1483 ppm TREO 27m @ 1030 ppm TREO • High-Grade REE blanket >1000 A’ ppm TREO. A • Prospect currently 1.5km by 800m – open in all directions. • High Value MREO intercepts - up 13m @ 15

  11. Slide 11: Artemis Cross-Section A-A'

    Artemis Cross-Section A-A’ 4 24m @ 1094 ppm TREO from 9m Inc 6m @ 1573 ppm TREO from 15m 27m @ 1030 ppm TREO from 15m Inc 12m @ 1408 ppm TREO from 24m 12m @ 845 ppm TREO from 9m 12m @ 1037 ppm TREO from 12m Inc 3m @ 1296 ppm TREO from 12m Inc 6m @ 1437 ppm TREO from 15m 12m @ 701 ppm TREO from 15m 1

  12. Slide 12: Comet REE Project Highlights

    Comet REE Project Highlights5 Exploration Drilling Completed – Assays Pending Thick & Shallow High-Grade MREO Mineralisation starts from a depth of 3-6m Average Intercept TREO = 936 ppm. Average Intercept and averages 11.5m thickness at Meteor. MREO = 242 ppm (26%) of TREO at Meteor. Mineralisation

  13. Slide 13: Woomera IOCG Project

    Woomera IOCG Project Highly Prized Tenure – In Area of Major OAK DAM IOCG Mineralisation6,7 • Multiple high priority gravity targets – 3 Target Styles – IOCG, Stratabound Woomera Defence Winjabbie EMMIE BLUFF IOCG and Sedimentary Copper. Continuous Use Zone Woomera EMMIE IOCG • Native Title Mining E

  14. Slide 14: Woomera IOCG Project

    Woomera IOCG Project WJD1- 62m @ 0.33% 07WJ01- 42m @ 0.34% Cu (int. 824-926m) Cu (int. 864-926m) Three Distinct Styles of Mineralisation6 inc. 9m @ 0.8% Cu from 824m SAE11- 94m @ 0.21% Cu (int. 1005-1099m) inc. 7m @ 0.48% Cu from 1006m inc. 9m @ 0.52% Cu from 1086m • Target 1 - IOCG Breccia Bodies –

  15. Slide 15: Woomera IOCG Project

    Woomera IOCG Project Rocky Well Gravity Anomaly Comparison with Carrapateena Gravity Anomaly6 Carrapateena Target 1 - Rocky Well • Rocky Well Target is an IOCG Breccia Body Style – Displays a Comparable gravity response to the Carrapateena Orebody! • Steep gravity gradient on west side of Rocky Well

  16. Slide 16: South Australia Projects

    South Australia Projects World-Class Olympic Copper Gold Province N • Mabel Creek Copper Gold Project – Large land holding(2,852 km2). AREA 13 • Cu-Au prospects highlight fertility for Iron Oxide- Copper-Gold (IOCG) mineralisation. AREA 5 • Major copper players – RIO, BHP & FMG in surrounding Areas.

  17. Slide 17: Mabel Creek Cu-Au Project

    Mabel Creek Cu-Au Project Olympus IOCG Target10 • A World–Class Sized Geophysical Target in the Olympic Cu-Au Trend. • 3 Milligal Gravity Target comparable to the Prominent Hill Cu-Au Mine geophysical response. • High Powered SQUID EM – identified conductive plate of significant dimensions on easter

  18. Slide 18: Active Ground Campaign for 2023

    PTR Forward Program Active Ground Campaign for 2023 Exploration Activity June July August September October November December Comet Project REE Drilling Programs Assay Results Metallurgical Studies Woomera Project Gravity Survey Results Drilling Programs Mabel Creek EM/Gravity Targets Defined Drilli

  19. Slide 19: Why Invest in PTR?

    Why Invest in PTR? Thick, Shallow Favourable Exploration World Class & High-grade REE Location Upside Cu-Au Targets ASX:PTR 18

  20. Slide 20: Peter Reid

    Peter Reid Chief Executive Officer E: preid@petratherm.com.au T: 0435 181 705

Petratherm — RIU Gold Coast Investment Showcase 2023 on 6ix