  1. Slide 1: High-efficiency and Large-scale VRB-ESS Supports Carbon Neutralization

    High-efficiency and Large-scale VRB-ESS® Supports Carbon Neutralization Mianyan Huang, CEO of VRB Energy 2021-04-15 Version 0.1

  2. Slide 2: Catalogue

    Catalogue Value and mission of VRB ESS technology 01 Advantage of vanadium flow battery 02 Commercial application of large-scale projects 03

  3. Slide 3: Value And Mission of VRB ESS Technology

    1 Value And Mission of VRB ESS Technology

  4. Slide 4: Worldwide Promoting Carbon Emission Trading Markets

    Worldwide Promoting Carbon Emission Trading Markets 4

  5. Slide 5: Three Development Stages Of Energy Storage Technology

    Three Development Stages Of Energy Storage Technology 2020 2025 2030 2060 Stage 1 Stage 2 Stage 3 New power system Deepen reform of the power system to build Carbon neutrality new energy as the main body • Power ratio of 100%+, distribution market 4H + • New energy stocks to replace thermal power •

  6. Slide 6: Energy Storage Market Continue To Grow Globally

    Energy Storage Market Continue To Grow Globally 2020 Total installed capacity of the global electrochemical energy storage projects is 14,247.3MW, newly put into operation scale is 4726.8MW. Total installed capacity of electrochemical energy storage projects in China is 3269.2MW, newly installed cap

  7. Slide 7: Advancement Technology of Flow Battery System

    2 Advancement Technology of Flow Battery System

  8. Slide 8: Safety, Environment Friendly, Low LCOE

    Safety, Environment Friendly, Low LCOE Working principle of vanadium flow battery system Flexible configuration from KW level to Advantage MW level facilitates rapid expansion. Charged and discharged quickly, frequently and with large current, charged and discharged in depth without damaging the bat

  9. Slide 9: VRB ESS Project In The Stage of Demonstration of Commercialization

    VRB ESS Project In The Stage of Demonstration of Commercialization The attraction of domestic energy storage market and the feasibility of flow battery energy storage technology high * Size represents market potential Energy type With large scale renewable energy Power type Management of user electr

  10. Slide 10: Vanadium Is The Superior Storage Solution

    VANADIUM IS THE SUPERIOR STORAGE SOLUTION Vanadium Lithium 23 3 Arizona Public Service 2MW 2MWh V Li Lithium-ion battery (LiB) explosion on April 50.94 6.941 19, 2019 hospitalizes 4 firefighters Cycle-Life Infinite 2,000-5,000 Usable Capacity 100% 80% Safety Inherently safe Fire risk Recyclability 1

  11. Slide 11: Expected Improvement Trend of VRB Product's Performance

    Expected Improvement Trend of VRB Product’s Performance The world leading product of Gen 3 VRB-ESS Stack developing route of VRB MW-ESS Parameter Gen 2 MW ESS Gen 3 MW ESS Gen 1 was produced in 2010 Specific energy(Wh/kg) 10-20 10-20 Gen 2 was produced in 2016 Gen 3 plan to produced in 2021 Energy d

  12. Slide 12: Under Construction or Planned MW Class Flow Battery Projects In China

    Under Construction or Planned MW Class Flow Battery Energy Storage Project In China Xinjiang Hebei ⚫ Vanadium flow battery energy storage power ⚫ Wind power and energy storage project phase 1 in station7.5MW/22.5MWh( phase 1) Hebei Liaoning ⚫ Wind Farm with energy storage demonstration Project in Wa

  13. Slide 13: Global Market Increasing of Vanadium Flow Battery

    Global Market Increasing of Vanadium Flow Battery 13

  14. Slide 14: VRB Is An Ideal Energy Storage Technology Matching Photovoltaic and Wind

    VRB Is An Ideal Energy Storage Technology Matching Photovoltaic, Wind Power Generation and Assisted Carbon Neutrality • More than 25 years of service life ( match the service life of wind power and photovoltaic facilities) • Depth charge and discharge in infinite cycles (no redundant design extensio

  15. Slide 15: Industrial Innovation Promote Large-scale Commercial Project Application

    3 Industrial Innovation Promote Large-scale Commercial Project Application

  16. Slide 16: VRB Energy – Global leader of Large-Capacity Vanadium Flow Battery

    VRB Energy –Global leader of Large –Capacity Vanadium Flow Battery Company Overview Manufacture base -Beijing • VRB Energy was founded in January 2007 and base in Beijing. • VRB Energy holds multiple key patents in vanadium redox flow battery around the world, installed over 60 storage project in 12

  17. Slide 17: Big Event

    Deliver Orknell, California project 600kW/3.6MWh Big Event Gen 2 VRB-ESS™ mass-produced。 Signed state wind power photovoltaic and storage project Acquiring Canadian VRB Zaoyang project 10MW Power Systems。 photovoltaic and energy storage project( phase 1) commissioning。 2007 2009 2010 2012 2014 2016

  18. Slide 18: VRB-ESS: GW ESS with multiple modular energy storage units

    VRB Energy –Global leader of Large –Capacity Vanadium Flow Battery VRB-ESS®, safe ,environment friendly, low LCOE and flexible distribution energy storage technology GW ESS with multiple modular energy storage units 10KW ~ 100KW 500KW ~ 50MW 50MW以上 VRB KW-ESS® VRB MW-ESS® VRB kW product VRB MW produ

  19. Slide 19: Installed Project

    Installed Project Installed almost 60 energy storage project in 12 countries, installed capacity over 40MWh, over 800,000 operation hours User side peak clipping and valley filling SMART GRID With renewable energy USA 600kW/3.6MWh Slovakia 100kW/600kWh State Grid 2MW/8MWh Photovoltaic and energy sto

  20. Slide 20: 3MW/12MWh Project Phase I of Zaoyang 10MW Integration Project

    3MW/12MWh Project Phase I of Zaoyang 10MW Integration Project System composition Economic fesibility study First phase 3MW/12MWh vanadium flow Investment : battery power station: • Capital demand for first phase RMB55million。Include owner’s capital RMB10 6 sets of 500KW PCS million;financing RMB45 m

  21. Slide 21: 3MW/12MWh Project Phase I of Zaoyang 10MW Integration Project

    3MW/12MWh Project Phase I of Zaoyang 10MW Integration Project Onsite picture Operation curve 21

  22. Slide 22: Promote Rapid Cost Reduction and Commercial Application

    Promote Rapid Cost Reduction and Commercial Application Through Technological Progress and Resource Integration Gen 3 product Balance V price World leading performance further cost reduction Cost reduction 28%。 stack and relate facility Vanadium electrolyte occupy 40% cost occupy 60% cost Energy den

  23. Slide 23: Promote Rapid Cost Reduction and Commercial Application

    Promote Rapid Cost Reduction and Commercial Application Through Technological Progress and Resource Integration Gen 3 product Balance V price World leading performance further cost reduction stack and relate facility Vanadium electrolyte Vertical integrated resource and commodity occupy 40% cost occ

  24. Slide 24: VRB MW-ESS 100MW Peak Regulation Energy Storage Power Station

    VRB MW-ESS® 100MW Peak Regulation Energy Storage Power Station Electrical topological diagram • Construction period:6~12months • Floor space:2.66 hectare (100MW/400MWh) • 1.5 ~2 times overload capacity • Waste heat recovery : system efficiency achieve 90% with waste heat recovery Heating 35% Heat wa

  25. Slide 25: Summary

    Summary • Under the goal of carbon neutrality, the rapid development of photovoltaic and wind power generation and the rapid decline in cost bring great opportunities for energy storage technology. • The vanadium flow energy storage system has become an ideal large-capacity energy storage technology