Sparton Resources Inc. · TSXV:SRI
Sparton Resources — Shareholder Meeting (July 2022)
23 slides from Sparton Resources's shareholder meeting presentation, July 2022
Slide 1: Corporate Update Annual Meeting 2022
SRI – TSX Venture SPNRF:PK WKN:727532 - Frankfurt CORPORATE UPDATE ANNUAL MEETING 2022 Former Producer Poly Metallic Two Canadian Gold Exploration Copper-Gold Project with Hard Asset Minority Ownership Projects Near Major Operating NI 43-101 Resource Under of Clean Tech Energy Storage Mines in Ontar
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation does not constitute or form part of, and should not be construed as, an offer to sell or issue or the solicitation of an offer to buy or acquire securities of the Company or any of its subsidiaries nor should it or any part of it, not the fact of its dist
Slide 3: 2021-22 Highlights
2021-22 HIGHLIGHTS FINANCIAL: Raised approximately $500,000M through warrant exercise plus options exercise in 2021 by Company Directors, Management, and Consultants Repaid majority of short term debt Drilling Subsidiary generating significant revenue and sustaining cash flow. VRB ENERGY (9.8% owned
Slide 4: Capital Structure
CAPITAL STRUCTURE SPARTON RESOURCES INC. SRI –TSX Venture Exchanges SPNRF:PK Major Shareholders: WKN:727532 - Frankfurt Management ~ 7.5 M Institutional ~ 6.0 M Shares Outstanding 147,031,537 Private ~ 7.9 M Private ~ 12.9 M 52 Week High/Low $ 0.095 / $0.04 Private ~ 4.4 M Private ~ 9.9 M Private ~
Slide 5: Asset Summary
Core Asset Values in minority interest in the Clean-Tech Energy Storage Company VRB Energy Inc. with Robert Friedland’s publicly traded Ivanhoe Electric New Gold Discovery in Quebec, 2018-19; Farm–In by Nearby Major Producer Eldorado Gold on the 51 claim property with major drill Asset Summary c
Slide 6: VRB Energy Inc
VRB ENERGY INC VanSpar, Sparton’s subsidiary, reactivated a world leading Vanadium Flow Battery (VFB) manufacturer that had encountered financial difficulties. Robert Friedland, recognizing this opportunity, became the major shareholder through his privately controlled company HPX (now Ivanhoe Elect
Slide 7: VRB Energy's vanadium redox batteries store energy in liquid vanadium electrolyte
VRB Energy's vanadium redox batteries (VRB™) store energy in liquid VRB BATTERY SCHEMATIC Vanadium electrolyte in a patented process based on the reduction and oxidation of ionic forms of vanadium. VRB Energy is a sector leader in large capacity grid-scale Vanadium Flow batteries with more than 50 b
Slide 8: Activities 2021-22
VRB Energy was pleased to receive a lot of attention at the 10th Energy Storage International Conference and Expo (CNESA) in 2021, including being the recipient of "Best Provider" award Activities 2021-22 VRB Energy has been very busy since the August 2021 $US24 million financing arrangement was
Slide 9: Activities 2021-22 (continued)
The Gigafactory construction in Hubei Province has been underway for about 10 months and the physical infrastructure for the Phase 1 30 Mwh system is approaching completion.. This project is a 4 party joint venture between VRB, the local and state governments and private interests. Activities 2021
Slide 10: Exploration Projects Focusing on Areas near Producing Mines
All projects have been subject to slowdowns due to Covid Restrictions and technical shortages including drilling staff, long waiting times for assay results and a general high volume of exploration work going on especially in the Exploration precious metals sector. Projects Oakes Gold Project, Mat
Slide 11: Oakes Gold Project Area
LOCATION Situated within the world’s most prolific gold producing area, on the extension of the Kirkland-Larder Lake Gold Structural System. The nearby Alamos Gold’s Young Davidson Gold Mine, is currently producing 200,000 ounces gold per annum. OAKES GOLD BACKGROUND The Oakes Property consists of 3
Slide 12: Oakes and Copper Project Areas
Oakes and Copper Project Areas Polymetallic Copper Project 12
Slide 13: Oakes Leases and Nearby Claims
OAKES LEASES AND NEARBY CLAIMS 13
Slide 14: Historic Drilling Data
HISTORIC DRILLING DATA 14
Slide 15: Shaft IP Survey Area Priority Chargeability Anomalies
IP SURVEY AREA SHAFT 2022 PRIORITY CHARGEABILITY ANOMALIES 15
Slide 16: Oakes and Copper Project Areas: Polymetallic Copper-Gold Project
Oakes and Copper Project Areas POLYMETALLIC COPPER-GOLD PROJECT 16
Slide 17: Polymetallic Copper Project
LOCATION Situated adjacent to the Oakes Project Claims near Matachewan, Ontario BACKGROUND A former producing Copper – Molybdenum Mine POLYMETALLIC COPPER PROJECT Sparton has Exclusive right to Evaluate the Property MATACHEWAN, ONTARIO 2021-22 budget ~ $150,000 RESULTS NI 43-101 Compliant Resources
Slide 18: Bruell Gold Project Area
LOCATION 50 km east of Eldorado Gold’s Lamaque Mill which currently produces 135,000 ounces of gold per annum. Situated within an historically prolific gold producing area. BRUELL GOLD BACKGROUND Eldorado Gold Corp. has committed to spend $1.5 Million over 3 years and PROJECT AREA reimburse Sparton
Slide 19: Val d'Or Gold Mining Area
Val d’Or Gold Mining Area Over 30 Million oz. of Gold Produced BRUELL LAMAQUE MINE ELDORADO ELDORADO GOLD CORP OPTION Eldorado Gold’s Lamaque Mine L Bruell Gold Project 19
Slide 20: Eldorado 5000 meter Drill Program for 2022
Eldorado 5000 meter Drill Program for 2022 Red Holes 20
Slide 21: 2022 Going Forward
2022 GOING FORWARD - Monitor and report on VRB Energy corporate and commercial activities. - Continue to monitor and report on Eldorado Bruell program and results. - Begin prospecting and trenching program at Oakes Project on the 5 priority IP anomaly targets. - Prepare for Alamos Gold Oakes Project
Slide 22: Management and Directors
Lee Barker, a Professional Engineer, Professional Geologist and mineral industry consultant has nearly 60 years of experience at both junior and senior mineral industry companies. Barker holds a BA Sc. in Applied Geology from the University of Toronto and an MSc. (Applied) in Mineral Exploration and
Slide 23: For Further Details
FOR FURTHER DETAILS: Lee Barker BASc., MASc., P Eng., CEO Tel:+1-416-716-5762 Email: info@spartonres.ca Richard Williams BA, LLB., Director Tel : +1-416-364-3123 Email: rickw@spartonres.ca CORPORATE HEADQUARTERS Wes Roberts MSc., MBA, P Eng., Director Tel: +1-647-292-3367 216-81A Front Street East E