Sparton Resources Inc. · TSXV:SRI
Sparton Resources — Shareholder Meeting (June 2019)
27 slides from Sparton Resources's shareholder meeting presentation, Jun 28, 2019
Slide 1: Sparton Annual General Shareholder Meeting
VanSpar 斯帕顿钒业 Sparton Annual General Shareholder Meeting June 28 - 2019
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation contains “forward-looking statements”, within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of
Slide 3: VStar Industries: Building a Major China Vanadium Company
VStar Industries Inc. BUILDING A MAJOR CHINA VANADIUM COMPANY
Slide 4: Corporate Structure
CORPORATE STRUCTURE 88% SPARTON RESOURCES INC. (TSX-V) Individual Private Related Parties Available for 7% 93% New Investors VStar MINING 30-75% LTD. (BVI). VANSPAR MINING BEI AN MINING NEGOTIATIONS INC. (BVI) LICENCE FOR + OTHERS NEARBY LEASING RENTIAN UNDER PROCESSING 18% NEGOTIATION PLANT VRB ENE
Slide 5: Pricing Vanadium Pentoxide
PRICING Vanadium Pentoxide (V O ) ~ US$8- 9.50 /lb June 2019 2 5 ▪ Post Financial Crisis - pricing has been volatile. ▪ China imports 1/4 of its annual demand. 。 ▪ China Policy stated that Vanadium development is one of China’s priorities and VRB batteries mandated for new renewable energy storage p
Slide 6: VStar Mining Ltd. (BVI)
VStar MINING LTD. (BVI) DEVELOPMENT OF ADVANCED-STAGE VANADIUM MINE AND PRODUCTION FACILITY IN CHINA ACQUISITION AGREEMENT TO PURCHASE AND DEVELOP ONE V MINING LICENSE WITH APPROVED HIGH GRADE V RESOURCES ⚫ NEGOTIATIONS UNDERWAY TO LEASE OR ACQUIRE NEARBY V2O5 PRODUCTION PLANT AND RELATED INFRASTRUC
Slide 7: VStar China Vanadium Objectives
VStar CHINA VANADIUM OBJECTIVES • SUSTAINED DEVELOPMENT PROGRAMME OVER THE NEXT 5 YEARS CAN CREATE ONE OF THE STRONGEST VANADIUM COMPANYS IN THE WORLD. • High-value product with demand increasing annually. • Close proximity to the World’s major markets. • V Mining License Acquisition at Low Cost, Pr
Slide 8: Vanadium Project Location, Jiangxi Province
VANADIUM PROJECT LOCATION Jiangxi Province
Slide 9: Project Status
PROJECT STATUS 项目状态 AGREEMENT IN PLACE TO ACQUIRE MAJOR VANADIUM PROJECT BEI AN MINING LICENCE + QUANKENG LICENSE 100% purchase agreements signed for Bei An and negotiated for Quankeng. Mining Licenses in Good Standing : projected over 100,000 tonnes (> 200 Million lbs) of contained V2O5 with 2000 m
Slide 10: Bei An Mine Area and Vertical Cross Section with Rentian Plant
BEI AN MINE AREA AND VERTICAL CROSS SECTION WITH RENTIAN VANADIUM PROCESSING PLANT
Slide 11: Bei An Summary
BEI AN SUMMARY Established Infrastructure: Bei An Vanadium Mining License Permitted for Production • Partially developed underground • Processing Facility Available • Infrastructure in place - Highway and Road and Rail access. • All Utilities in place – Electricity / Water • Low Capital development
Slide 12: General Area V Deposits
BEI AN D E RENTIAN PROCESS PLANT Infrastructure Center RENTIAN QUANKENG MINING LICENSE (C) A B GENERAL AREA V DEPOSITS –A+B+C= 670,000 TONNES V2O5 Government Mandate to Consolidate Vanadium Production in Area
Slide 13: Stone Coal Vanadium Mineralization
RENTIAN “STONE COAL” VANADIUM MINERALIZATION 0.93% V2O5 / 10 METRES 15% FREE CARBON
Slide 14: Rentian Drill Results
RENTIAN DRILL RESULTS 0.32% Zn 1.1% V2O5 OVER 28 OVER 28 METRES METRES
Slide 15: Flat Lying, Easily Mined Zones
FLAT LYING, EASILY MINED ZONES
Slide 16: Partial Resources Summary
PARTIAL “RESOURCES” SUMMARY XIUSHUI AREA VANADIUM NON- NI 43-101 COMPLIANT Over 150 drill holes! A 18.2M tonnes @ 0.820% V2O5, (0.5% V2O5 cut off) 170,000 tonnes V2O5 B 35.7M tonnes @0.91% V2O5, (0.7% V2O5 cut off) 350,000 tonnes V2O5 RENTIAN ~15M tonnes @ 0.90% V2O5, (0.5% V2O5 cut off) 150,000 ton
Slide 17: Why VStar & China Vanadium?
WHY VStar & CHINA VANADIUM? General • Project has both National and Local Government support – • Project Location: On the doorstep of the world’s largest consumer of Vanadium (importer of 1/4 of its annual consumption). • Low Open Pit Mining Costs: (est. US$2.50/t) Ore bodies can be mined by undergr
Slide 18: High Grade Gold New Discovery, Bruell Project
HIGH GRADE GOLD NEW DISCOVERY NEW DISCOVERY BRUELL PROJECT POSSIBLE EXTENSION Val d’Or East District Quebec Canada FOR MORE INFORMATION: New Drill Program underway D Focused on developing resources r CURRENT DRILLING .d Québec HISTORICAL ESTIMATES (Two Zones) include i 165,000 tonnes of 4.78 G/T GOL
Slide 19: Bruell
>? \|——_-- > Ran seit Se)aca ra i seethh.” BARI . aint-Marc-de-Figuery as ‘ LANDRIENNE) { Venus Nord (Barexor) [i 7 at “a 15 ] } | .< | Belford (Rotmont] acraute CUE et . a. \ al loc \ eh L } & | a La Motte : Lam a) 4 om itd . ‘ / \C si { ‘a Qbaskas / UHBLEMONT Plage-~ vine 7 ee 4 Y | i » ND/ AGNIGO
Slide 20: Bruell Property Historical Estimates Map
Bice Swine East Sulvan, © ~Bicmne miscanaca acy Pi a ee ‘ CLAUDE JACQUES AND LAI LAI CHAN i : Bruell Property a ‘ ° = ~ SS Shaft Bruell 1 and 2 Lac Pascalis : So 153,158t @ 5.83 g/t Au 33098 20,158 oz Au Shaft Avocalon |__| (Historical) 100,400t @ 3.77 g/t Au F 12,125 oz Au fe nd (Historical) Tiblem
Slide 21: Bruell Central Claim Area Drilling Highlights
N 4.56g/6.4m 3.36g/2.5m, 9.05g/0.34m, 0 100 200m 2018-2019 Drilling Mafic Intrusive -Diorite Mine Shaft 6.51g/4.11m Granodiorite , Quartz Diorite 5.15g/0.87m Intermediate Volcanics 3.7g/2.00 m 5.49g/0.85 5.14g/0.4 m Mine Shaft m 5.22g/2.44m, Diorite 6.51g/2.13m Quartz Feldspar Porphyry Geophysical I
Slide 22: Val d'Or Region Over 30M oz. of Gold Produced
New Zone NEW ZONE NEW DISCOVERY NEW ZONE D CURRENT DRILLING r Val d’Or Region i Over 30M oz. of Gold l Produced l Current/Past Producing Mines Regional Production exceeds 30M oz. of Gold Drilling March 2019 Q a
Slide 23: Bruell Induced Polarization Survey
2200) 28000 SASL ssssen0u— 3354004 3532004 — sasssc00H = Tau s gss2e00H s3028000— 33324001 7 1600 5 ann wk souann onsc0k somaaae p90n0F H H ean 200 svoiont —seztone satan Fagan. sentons Peis am mesos 2b vlacr te alles 1985 1989 Las: \t8e ‘sg090r Sa 53600 ‘200006 suo PASCLINE ss5s500 = aiss400N Cherg
Slide 24: Slide 24
Slide 25: Sheared Altered Diorite with Altered Quartz Porphyry
SHEARED ALTERED DIORITE WITH ALTERED QUARTZ PORPHYRY
Slide 26: 5.17 g/t gold over 1.5 meters
mony re mm NS Opn edna 5.17 git gold ‘nee DON op over 1.5 meters
Slide 27: Thank You
THANK YOU