Slide 1: Noosa Conference Presentation
NOOSA CONFERENCE For personal use only PRESENTATION NOVEMBER 2023 NOT FOR RELEASE TO US WIRE SERVICES OR DISTRIBUTION IN THE UNITED STATES www.cypriummetals.com
Slide 2: Important Notices and Disclaimer
IMPORTANT NOTICES AND DISCLAIMER IMPORTANT: You must read the following before continuing. This Presentation (“Presentation”) has been prepared by Cyprium Metals Limited (ABN 48 002 678 640) (“Cyprium” or “Company”). Summary information By reviewing or retaining these materials, or attending or part
Slide 3: Vision Statement
VISION STATEMENT Cyprium Vision: For personal use only “To become a significant profitable mid-tier copper producer with a multi-asset strategy set to capitalise on the global electrification thematic.” 3 CYPRIUM | NOOSA PRESENTATION - BUILDING AN AUSTRALIAN COPPER COMPANY | NOVEMBER 2023
Slide 4: Who is Cyprium Metals?
WHO IS CYPRIUM METALS? AUSTRALIAN COPPER DEVELOPER Located in a tier-1 mining jurisdiction • Attractive portfolio of 3 copper projects in Western Australia with a Mineral Resource of +1.6 million tonnes of contained copper • Flagship project is the 100% owned brownfield Nifty Copper Project which ha
Slide 5: Corporate Overview
CORPORATE OVERVIEW Corporate Snapshot Share Price History Share price (13 November 2023) $0.027 0.35 120 Shares on Issue 1,524m 0.3 100 Performance rights 117m Equity Raise & SHARE PRICE $/SHARE 0.25 VOLUME (MILLIONS) Relisting (Sept 23) 80 Options 424m 0.2 For personal use only 60 Warrants 80m 0.15
Slide 6: Nifty Copper Mine – Site Layout
NIFTY COPPER MINE – SITE LAYOUT Permitted Tailings Dam For personal use only Waste Dumps 2.8Mtpa Sulphide Concentrator 400 person Mine Village Open Pit Waste Water Offices and Workshops Treatment Facility Heap Leach Pads Gas Pipeline Solution Ponds Bitumen All Weather Airstrip 25,000 tpa SX EW Plant
Slide 7: Open Pit Visualisation – MLX Scoping Study 2020
OPEN PIT VISUALISATION – MLX SCOPING STUDY 2020 For personal use only 7 CYPRIUM | NOOSA PRESENTATION - BUILDING AN AUSTRALIAN COPPER COMPANY | NOVEMBER 2023
Slide 8: Open Pit Visualisation – MLX Scoping Study 2020
OPEN PIT VISUALISATION – MLX SCOPING STUDY 2020 For personal use only 8 CYPRIUM | NOOSA PRESENTATION - BUILDING AN AUSTRALIAN COPPER COMPANY | NOVEMBER 2023
Slide 9: The Nifty Strategy
THE NIFTY STRATEGY Restart the Nifty operation with a focus on capital intensity and lower risk through development of a large-scale open cut mine. Utilise the significant sunk capital infrastructure to unlock Nifty’s +15 year, +900Kt copper resource. For personal use only Current work programme inc
Slide 10: Nifty Execution Plan – Indicative Timeline
NIFTY EXECUTION PLAN – INDICATIVE TIMELINE 1 Month 3 Month 6 Month 12 Month 18 Month 24 Year 3 Year 4 (Year 1) (Year 1) (Year 1) (Year 2) (Year 2) Cathode Production For personal use only Execution Plan (updated costs) Integrated Scoping Study (Oxide & Sulphide) SX EW Production & Development/ Cu Me
Slide 11: Copper Developer Peer Comparison
COPPER DEVELOPER PEER COMPARISON Contained Copper Mineral Resources in Australian Projects1 For personal use only 1. Refer to Appendix and https://cypriummetals.com/investor-centre/analyst-research-reports/ 11 CYPRIUM | NOOSA PRESENTATION - BUILDING AN AUSTRALIAN COPPER COMPANY | NOVEMBER 2023 Right
Slide 12: Summary
SUMMARY • Equity Raising provides Cyprium with the funds required to complete an integrated study (oxide and sulphide) ahead of financing and FID in 2024 • Additional debt funding available for drawdown provides additional liquidity1 • Strengthened Board and executive team to deliver execution and g
Slide 13: Additional Information
For personal use only ADDITIONAL INFORMATION 13 Cyprium | NOOSA PRESENTATION - BUILDING AN AUSTRALIAN COPPER COMPANY | NOVEMBER 2023
Slide 14: Brief History of Nifty
BRIEF HISTORY OF NIFTY History Historical production and copper prices • Nifty produced 720,000 tonnes of copper Annual copper cathode production Annual copper in concentrate production Grade between 1993 and 2019 from a single orebody (tpa) % Cu under the stewardship of 4 different companies For pe
Slide 15: Paterson Exploration Project
PATERSON EXPLORATION PROJECT Premier exploration destination in Australia - Cyprium leveraged to exploration success via JV with IGO Ltd • Large & highly prospective position in the Paterson Province, adjacent to Nifty processing For personal use only infrastructure • IGO can sole fund A$32 million
Slide 16: Maroochydore Copper Project
MAROOCHYDORE COPPER PROJECT Potential to unlock value from a substantial copper resource • Substantial shallow Oxide and Sulphide Mineral Resource of over 480,000 tonnes of copper For personal use only • Mineralisation remains open along strike >3km and down-dip • Diamond drilling completed for meta
Slide 17: Murchison Copper Project
MURCHISON COPPER PROJECT Hollandaire and Nanadie Well are complementary deposits that comprise the Murchison Copper Project • Murchison Copper Project is a shallow resource development opportunity For personal use only • Cue Copper Project located ~20km east of Cue Township • Hollandaire Mineral Res
Slide 18: Mineral Resource Estimates - Nifty
MINERAL RESOURCE ESTIMATES - NIFTY NIFTY COPPER OPERATION - MINERAL RESOURCE ESTIMATE AT MAY 2022 2 Cut-off Measured Indicated Inferred Total Ore Source Ore Grade Metal Ore Grade Metal Ore Grade Metal Ore Grade Metal %Cu Mt %Cu t Cu Mt %Cu t Cu Mt %Cu t Cu Mt %Cu t Cu Oxide 0.25 1.6 0.9 13,600 0.7 0
Slide 19: Mineral Resource Estimates - Maroochydore
MINERAL RESOURCE ESTIMATES - MAROOCHYDORE MAROOCHYDORE - MINERAL RESOURCE ESTIMATE AT 31 MARCH 2016 3 Ore Indicated Inferred Total Source Ore Gra de Conta i ned Ore Gra de Conta i ned Ore Grade Contained (Mt) (% Cu) (t Cu) (Mt) (% Cu) (t Cu) (Mt) (% Cu) (t Cu) For personal use only Sul phi de - - -
Slide 20: Mineral Resource Estimates – Hollandaire / Nandie Well
MINERAL RESOURCE ESTIMATES – HOLLANDAIRE / NANDIE WELL HOLLANDAIRE - 2012 JORC MINERAL RESOURCE ESTIMATE 1 NANADIE WELL - 2012 JORC MINERAL RESOURCE ESTIMATE 4 Resource Grade Metal Grade Metal Grade Metal Material type Volume Tonnes Cu % Cu Tonnes Au g/t Au Ounces Ag g/t Ag Ounces Resource Category
Slide 21: Nifty Copper Project Approvals & Licenses
NIFTY COPPER PROJECT APPROVALS & LICENSES NIFTY COPPER PROJECT APPROVALS Department Permit / Item Description Status Date Lodged Approved Works Approval and Licence Amended Prescribed Activities Licence to enable processing Approved 8th March 2022 4th August 2022 Department of Water & Environmental
Slide 22: Copper Developer Peer Comparison
COPPER DEVELOPER PEER COMPARISON Contained Copper mineral resources in Australian projects1 Primary ASX Mineral Resource Contained Cu Contained Contained Label Project CommodityStage Code Operator As of Date Tonnes Total Cu% Metal M&I Tonnes Cu% Cu Metal Inferred Cu% Cu Metal CYPRIUM MRE COMBINED Cy
Slide 23: Copper Developer Peer Comparison
COPPER DEVELOPER PEER COMPARISON Contained Copper mineral resources in Australian projects1 Primary ASX Label Project Commodity Stage Code Operator Date SOURCE Page Link Caravel, CVV Caravel Copper PFS completed Jul 2022 CVV Caravel Minerals Limited 12-Jul-22 PFS results 12 https://cdn-api.markitdig