Cyprium Metals Limited · ASX:CYM
Cyprium Metals — Noosa Conference 2026
15 slides from Cyprium Metals's conference presentation, Jul 24, 2026
Slide 1: Building Australia's Next Great Copper Company
For personal use only BUILDING AUSTRALIA'S NEXT GREAT COPPER COMPANY NOOSA CONFERENCE INVESTOR PRESENTATION | JULY 2026 www.cypriummetals.com www.cypriummetals.com
Slide 2: Important Information
IMPORTANT INFORMATION Summary information This Presentation contains summary information about Cyprium, and its activities current only at the date of this Presentation. This Presentation is for information purposes only. The information in the Presentation is of a general nature only and does not p
Slide 3: CYM: Rapid Staged Expansion of WA Brownfield Copper
CYM: RAPID STAGED EXPANSION OF WA BROWNFIELD COPPER Nifty Copper Complex: abundant reserves, 75,000 tonnes of brownfield copper processing plant capacity and infrastructure 25,000 TONNE CAPACITY SXEW PLANT Nifty Copper Complex For personal use only Location Status Reserves1 Plant Product Existing HL
Slide 4: Significant Brownfield Site
SIGNIFICANT BROWNFIELD SITE Two processing plants, fully built infrastructure and permits For personal use only 4 CYPRIUM | 24 JULY 2026
Slide 5: Restart Strategy
RESTART STRATEGY PHASE 1 (underway) – SXEW Restart, Re-leach Existing Pads – Targeting 6,000 tpa cathode from releach of existing pads through refurbished “B Train” – [Expand plant capacity to match copper recovery] For personal use only PHASE 2 – Open pit restart, expand SXEW1 – Refurbish “A Train”
Slide 6: Cathode Production Is Nearing as We Complete Phase Cathode Restart
CATHODE PRODUCTION IS NEARING AS WE COMPLETE PHASE 1 CATHODE RESTART REMINE OF EXISTING HEAPS: PARTIAL REFURBISHMENT OF SXEW PLANT: 44,000 tonne Cu reserve; 91,000 tonnes contained1 “B TRAIN’ TO SUPPORT ~6,000 TPA PRODUCTION2 For personal use only Plant refurbishment at 50%; cathode production expec
Slide 7: Phase Cathode: Re-leaching Existing Pads
PHASE 1 CATHODE: RE-LEACHING EXISTING PADS Surface leach designed to continually irrigate 1.2 million tonnes of material – Pads are turned over, covered with soaker hoses and onflow piping, and irrigated – As grade drops, leached material is stripped and removed, and process is repeated below Initia
Slide 8: Direct Injection Leaching Trial
DIRECT INJECTION LEACHING TRIAL Potential for rapid increase in material under leach >> 1.2 million tonnes Waterflood injection of well on Heap 14 = permeable and reporting to off-flow piping For personal use only Wellfield design 8 CYPRIUM | 24 JULY 2026
Slide 9: Phase Cathode: Partial Refurbishment of SX-EW Plant
PHASE 1 CATHODE: PARTIAL REFURBISHMENT OF SX-EW PLANT Nifty SXEW: two independent process trains with shared components, historic peak annual production of 25,000 tonnes cathode Shared Components In Refurbishment Electrolyte Tanks Organics Raffinates For personal use only Diluent Shared Components I
Slide 10: Concentrate: Match Mine to Processing Plan
CONCENTRATE: MATCH MINE TO PROCESSING PLAN1 2.8MT MILL, 50,000 TONNE FLOAT PLANT OPTION 1 (PFS): CONTINUOUSLY ENERIGZED; LAST OPERATED 2019 MATCH FLOAT PLANT CAPACITY BY EXPAND MILLING kt 50 For personal use only 45 46 46 46 40 43 44 44 41 41 35 39 39 30 34 35 35 33 35 25 28 20 22 15 10 14 14 12 5 -
Slide 11: Maroochydore Rediscovered
MAROOCHYDORE REDISCOVERED Globally significant copper resource in Paterson district within haul distance to Nifty 370.8Mt @ 0.43% Cu, 227 ppm Co 106.3Mt @ 0.67% Cu, 308 ppm Co Sedimentary copper Higher-grade domain Inferred resources Higher-grade zone within inferred mineralisation style Will be fur
Slide 12: 2,000 km2 of Under-Drilled Prime Basin Margin Targets
2,000 KM2 OF UNDER-DRILLED PRIME BASIN MARGIN TARGETS For personal use only Exploration to extend oxide production base from known occurrences and increase sulphide reserves 12 CYPRIUM | 24 JULY 2026
Slide 13: Cyprium Metals Snapshot
CYPRIUM METALS SNAPSHOT (ASX: CYM) Brownfield restart of prolific copper complex in Western Australia CORPORATE SUMMARY1 CYM 12MTH SHARE PRICE CHART Share Price (as at 21 July 2026) A$0.415 Share Price (A$) Volume (M) 0.70 Shares on issue 578m 0.60 Market Capitalisation A$239.9m 0.50 For personal us
Slide 14: Upcoming Catalysts
UPCOMING CATALYSTS 2H 2026 delivers production and continued maturation of growth options in a market clamoring for copper For personal use only 2H 2026 CATALYSTS Cyprium transitioning to a producer First leach and copper inventory build Practical completion, wet commissioning of SXEW plant First co
Slide 15: Contact
CONTACT For personal use only Angus Miles Corporate Development and Investor Relations +61 8 6374 1550 Chris Lim External Media Relations Advisor +61 493 392 001 communications@cypriummetals.com Registered Office Level 1, 437 Roberts Road Subiaco WA 6008 Australia Telephone +61 8 6374 1550 www.cypri